Jurnal Aplikasi Pelayaran dan Kepelabuhanan

Published by Universitas Hang Tuah

Abbrev: J. Apl. Pelayaran dan Kepelabuhanan
ISSN 2087-2607EISSN 2654-4911
Database Coverage
  • Scilit
Journal Articles
All-time journal articles
216
2025 journal articles
36
Subject
  • Supply Chain & Logistics
  • Facilities Management
  • Management Sciences

Publications Analysis

Publications in 2016-2026
Open Access Publications in 2016-2026
Top Subjects

Publications in 2016-2026.

SubjectPublications
Facilities Management
48
Supply Chain & Logistics
44
Management Sciences
33
Operations Management
24
Risk Management & Assessment
15
Manufacturing
12
Education & Pedagogy
8
Sociology
7
Ocean Dynamics
6
Combustion
6

Top Countries

Publications in 2016-2026.

CountryPublications
Indonesia
175

Citation analysis
Publications published in 2023-2024 and cited in 2025.
Total Citations
40
Total Publications
43
Average Citations
0.93
Cited Publications
17
Cited Publications %
39.5%
Self Citations
0
Self Citations %
0%

Metrics
2025 Integrated Impact Indicators
I3
84
I3/N
3.65
h5_index
7
Monthly Citation Metric (MCM)
0.25

Monthly Citation Metric

Citations per year
All citations in 2016-2026

Citation Distribution
All citations to publications in 2023-2024.
Q1
0
Med
1
Q3
2
99%
8
Max
8

Citation Origins
Publications published in 2023-2024 and cited in 2025.
Citing Source Titles
Citing Publishers

Latest Publications

  • Open Access

    Analysis of Increased Oil Content in Wastewater from the Oily Water Separator (OWS) Process on the MV. Meratus Project Tangguh

    by Tamrin Ismail, Mursidi Mursidi, Maxima Ari Saktiono

    This study aims to analyze the causes of increased oil content in the effluent discharged from the Oily Water Separator (OWS) process, determine the resulting impacts, and formulate effective preventive and corrective measures. The research was conducted onboard MV. MERATUS PROJECT TANGGUH using a descriptive qualitative method, with data gathered through observation, interviews, and documentation from the daily logbook. The results indicate that the oil content in the discharged water exceeded the standard limit of 15 ppm on several occasions, reaching a peak value of 20 ppm. This increase was driven by technical factors, such as coalescer filter clogging and Oil Content Meter (OCM) inaccuracies; operational factors, including non-compliance with Standard Operating Procedures (SOPs); and maintenance factors, specifically the lack of routine servicing. The resulting impacts include marine environmental pollution, violations of MARPOL Annex I regulations, and a decline in OWS system performance as well as ship operational efficiency. Preventive measures that can be implemented include regular cleaning and component replacement, disciplined adherence to SOPs, and the execution of scheduled preventive maintenance. Based on the findings, it is concluded that the rise in oil content within the OWS system is a result of interacting multifaceted factors; therefore, mitigation must be addressed comprehensively through technical, operational, and maintenance approaches.

  • Open Access

    The Effect of Seafarers' Skills Training Programs on Seafarer Performance Aboard Merchant Ships

    by Eka Endah Suryani, Kuncowati Kuncowati, Nyoman Ardiana Listriyawati

    This study aimed to analyze the effect of seafarers’ skills training programs on the performance of seafarers aboard merchant ships and to identify the factors contributing most significantly to training effectiveness. A quantitative method with a causal approach was employed, involving 72 seafarers working on merchant ships. Data were collected through Likert-scale questionnaires and analyzed using validity and reliability tests, classical assumption tests, simple linear regression, the coefficient of determination, and hypothesis testing with IBM SPSS. The results showed that seafarers’ skills training has a positive and significant effect on seafarers’ performance, as demonstrated by a calculated t-value of 11.373 and a significance value of 0.000 (< 0.05), confirming the acceptance of the research hypothesis. The correlation coefficient (R) of 0.806 indicates a very strong relationship, while the coefficient of determination (R Square) of 0.649 demonstrates that 64.9% of the variation in seafarers’ performance is explained by skills training, with the remaining 35.1% attributed to other factors. The findings indicate that training effectiveness is influenced by the training model, methods, instructor competence, relevance of training materials, and availability of facilities and infrastructure. Therefore, seafarers’ skills training is essential for improving competence and performance. Maritime education and training institutions, shipping companies, and government authorities should continuously improve training quality through competency-based curricula, instructor development, and modern simulation technology aligned with international maritime safety standards.

  • Open Access

    Analysis of the Failure of the Fuel Oil Purifier No. 2 Purification Process on the Quality of Main Engine Fuel Oil on Board MV. Tanto Sukses

    by Gatot Priyo Tri Atmojo, Mursidi Mursidi, Dyah Agustin Widhi Yanti

    Failure of the purification process in Fuel Oil Purifier No. 2 reduces the quality of fuel supplied to the main engine, resulting in incomplete combustion, lower engine efficiency, and increased component wear. This study aims to identify the causes of purification failure, analyze its impact on fuel quality and main engine performance, and propose corrective and preventive measures. A descriptive qualitative method was used, with data collected through direct observation during sea practice (PRALA), interviews with engine officers and crew, documentation, and literature review. The results show that purification failure was caused by fuel heating temperatures below the normal operating range (80–85°C) due to carbon deposits on the boiler burner, sludge accumulation causing bowl disc overflow, and damaged electric motor bearings and V-belts that prevented the purifier from reaching its optimum rotational speed. These conditions reduced the effectiveness of separating water and impurities from the fuel, allowing contaminated fuel to enter the main engine. As a result, combustion became incomplete, engine efficiency declined, and the risk of engine component wear increased. The study concludes that successful fuel purification depends on maintaining the correct operating temperature, ensuring the reliability of purifier components, and implementing proper maintenance procedures. Preventive measures include consistent application of the Planned Maintenance System (PMS), routine cleaning of the boiler burner and bowl disc, regular monitoring of operating temperature, timely replacement of worn bearings and V-belts with manufacturer-approved spare parts, and continuous monitoring of fuel quality to ensure reliable main engine performance.

  • Open Access

    Optimization of the Clearance In and Clearance Out Processes to Reduce Delays of Vessels Operated by PT. Matsuura Indonesia Jaya at Gresik Port

    by Mochamad Ghulam Ar Rizki, Kuncowati Kuncowati, Elva Febriana Anggraeny

    This study analyzes the clearance in and clearance out processes to reduce delays of vessels operated by PT Matsuura Indonesia Jaya at Gresik Port. Vessel arrival and departure services depend on document readiness, data accuracy, verification by relevant authorities, digital systems, and operational coordination. A descriptive qualitative method was employed through observation, semi-structured interviews with two operational officers, documentation, and analysis of 51 vessel-call records over 17 weeks. The results show that clearance in begins with receipt of the estimated time of arrival, document checking, system submission, verification, and issuance of service permission. Clearance out includes preparing departure documents before operations are completed, final verification, issuance of the Sailing Approval, and coordination of pilotage, towage, and unberthing. The stages requiring the greatest optimization are preliminary document checking, earlier submission, verification monitoring, and synchronization of administrative work with operational activities. Dominant controllable causes of delay include incomplete or expired documents, discrepancies between manual and system data, revisions or repeated data entry, delayed information, and slow coordination. Operational and external factors, including cargo-handling delays, technical readiness of vessels, service queues, network or system disruptions, weather, and sea currents, also extend waiting time. Optimization is achieved through document checklists, clear task allocation, early submission, status monitoring, and active communication among the parties involved.

  • Open Access

    Analysis of the Implementation of Digital Navigation Equipment and Publications to Improve Navigation Effectiveness on Board MV. Lodestar Adventure

    by Fajar Muafik, Mudiyanto Mudiyanto, S. Teguh Wiyono

    This study aims to analyze the implementation of digital navigation equipment and publications and identify efforts to improve navigation effectiveness on MV. Lodestar Adventure. A qualitative descriptive approach was employed. The research subjects consisted of the Captain, Chief Officer, Third Officer, and Apprentice Officer, selected through purposive sampling based on their direct involvement in operating digital navigation systems. Data were collected through observation, interviews, documentation, and literature review, while data analysis followed the interactive model of Miles and Huberman, including data reduction, data display, and conclusion drawing. The findings indicate that the implementation of digital navigation systems, including the Electronic Chart Display and Information System (ECDIS), Automatic Identification System (AIS), Global Positioning System (GPS), Radar, and Electronic Navigational Chart (ENC), has improved navigation effectiveness. However, several challenges remain, such as delayed ENC updates, suboptimal safety parameter settings, differences in crew competency in utilizing advanced ECDIS features, and overreliance on digital systems without adequate visual verification. Efforts to improve navigation effectiveness include regular ENC updates, continuous crew training and briefings, strengthened coordination among watch officers, and the application of cross-checking between digital navigation systems and visual observation. Therefore, effective navigation depends not only on advanced technology but also on competent human resources, up-to-date navigation data, and consistent implementation of safety procedures.

  • Open Access

    The Impact of Delays in The Renewal of Safety, Construction, and Radio Certificates on The Operational Smoothness of Ships

    by Awel Suryadi, Iqlima Khairani, Adhi Pratistha Silen

    Ships rely on properly maintained statutory certificates to ensure safe and efficient maritime operations. However, PT Sinarmas LDA Maritime has experienced delays in renewing safety and construction certificates and radio certificates, disrupting delivery schedules, increasing idle time, and limiting vessel operations. This study aims to systematically evaluate the partial and simultaneous effects of delays in renewing these three certificate types on ship operational smoothness and identify the most influential factor. A quantitative research design was employed using multiple linear regression analysis. Data were collected from 70 purposively selected respondents comprising land and sea employees of PT Sinarmas LDA Maritime. Data were processed using SPSS version 27 through validity and reliability tests, classical assumption tests, including normality, multicollinearity, and heteroscedasticity tests, and hypothesis testing using t-test, F-test, and coefficient of determination. The regression equation obtained was Y = 5.649 + 0.142X1 + 0.076X2 + 0.553X3, with an R² of 0.524, indicating that the three independent variables collectively explain 52.4% of the variation in ship operational smoothness. Simultaneously, certificate renewal delays significantly affect ship operational smoothness (F = 24.263; p < 0.001). Partially, only delays in radio certificate renewal have a significant effect (p < 0.001), whereas delays in safety and construction certificate renewals do not show significant effects. These findings emphasize the need to strengthen certificate administration through digital-based monitoring systems, enabling timely renewal, reducing operational disruptions, minimizing idle time, and supporting safer and more efficient vessel operations, particularly regarding radio certificate compliance and strengthening overall maritime service reliability and continuity.

  • Open Access

    Analysis of the Red Lane Determination of Imported Furniture Goods Owned by PT Jasco Logistics Surabaya

    by Abu Taufiqurrahman, Ekka Pujo Ariesanto Akhmad, Toto Dwijaya Saputra

    This study was motivated by the assignment of the red channel to imported furniture, which requires document and physical inspection before the issuance of the Goods Release Approval Letter (Surat Persetujuan Pengeluaran Barang – SPPB), delaying customs clearance and increasing logistics costs. This study analyzes the red channel determination process for furniture imports handled by PT Jasco Logistics Surabaya, identifies obstacles and assesses their impact on import efficiency. A descriptive qualitative method was employed. Data were collected through observations, interviews with operational and Export Import (Exim) staff, and documentation. Data analysis followed the Miles, Huberman, and Saldana model, comprising data collection, condensation, display, and conclusion verification. The findings show that red channel determination is based on the Directorate General of Customs and Excise risk management system through the CEISA Service Computer System (SKP), considering the importer's profile, commodity characteristics, and random selection mechanisms. The handling process involves receiving import documents, preparing the Import Declaration (Pemberitahuan Impor Barang – PIB), red channel assignment, physical inspection, and customs clearance. Key obstacles include lengthy physical inspections, queues in the behandle area, container transfers to the Customs Temporary Storage Facility (Tempat Penimbunan Pabean – PLP), and issuance of Customs Tariff and/or Customs Value Assessment Letters (Surat Penetapan Tarif dan/atau Nilai Pabean – SPTNP). These obstacles cause cargo release delays, increased demurrage and warehouse rental costs, and reduced operational efficiency. The study concludes that stronger stakeholder coordination and greater accuracy in customs document preparation are essential for supporting a smoother and more efficient import process.

  • Open Access

    Analysis of Anchor System Disturbance to Support Crew Safety During the Letgo Process on MV. Isa Express

    by Saban Zudir Bahadjai, Mudiyanto Mudiyanto, Dedy Kristiawan

    This research, titled “Analysis of Anchor System Disturbance to Support Crew Safety During the Letgo Process on MV. Isa Express,” examines the causes and impacts of an anchor system failure that occurred on 10 April 2025. During the letgo operation, the windlass brake malfunctioned, causing an uncontrolled anchor chain runaway and creating a serious safety hazard for the crew on the forecastle deck. The study aims to identify the factors contributing to the disturbance, assess its impact on crew safety, and propose corrective and preventive measures. A qualitative descriptive case study approach was employed using data collected through onboard observation, interviews with the Master, deck officers, Bosun, and deck ratings, and documentation analysis. The findings reveal that the incident resulted from three interconnected factors: excessive wear of the windlass brake lining combined with corrosion of the brake lever, a Planned Maintenance System that remained largely reactive, and delayed follow-up on the Bosun’s earlier brake condition report. These deficiencies significantly increased the risk of injury to the deck crew, although a more serious accident was prevented by the prompt response of the duty officer. To improve operational safety, the study recommends implementing a preventive maintenance strategy, conducting brake function tests before every letgo operation, and ensuring timely follow-up of maintenance reports to enhance anchor system reliability and crew safety.

  • Open Access

    Risk Management Analysis of Turbocharger Maintenance for Enhancing Main Engine Performance in MV. Pekan Sampit

    by Bagiyo Suwasono, Roudlitul Awwalin, M. Ribakh Fanani

    The turbocharger is a vital component of a ship's main engine, responsible for supplying pressurized scavenging air into the combustion chamber to optimize combustion performance. Operational issues with the main engine turbocharger on MV. Pekan Sampit led to a decline in engine performance. This study aims to identify the risk factors associated with sub-optimal turbocharger maintenance, evaluate their impact on main engine performance, and formulate mitigation strategies on MV. Pekan Sampit. A descriptive qualitative research method was employed, utilizing an integrated approach of the Fishbone Diagram and Failure Mode and Effects Analysis (FMEA). The results indicate that the primary risk factor originates from the Machine category (RPN 276.75) due to bushing and shaft wear, followed by Material (RPN 214.50) and Method (RPN 212.00) caused by fouling on the air filter/aftercooler and delays in the Planned Maintenance System (PMS). Consequently, these issues triggered a reduction in scavenge air pressure, incomplete combustion, an exhaust gas temperature (EGT) surge up to 460°C, and a drop in engine speed from 1,210 RPM to 1,140 RPM. Optimization efforts involve replacing worn components, cleaning the air filter and aftercooler, maintaining the seawater cooler, and strictly implementing the PMS along with daily monitoring.

  • Open Access

    Management of Phytosanitary Certificate Documents in the Veneer Wood Export Process at PT. Jasco Logistics Surabaya Branch

    by Desi Wulandari, Ekka Pujo Ariesanto Akhmad, Didik Purwiyanto

    This study aims to describe the management of Phytosanitary Certificate documents in veneer wood export activities at PT. Jasco Logistics Surabaya Branch, identify obstacles encountered, and examine the company’s efforts to overcome them. A qualitative method with a single case study design was employed. Data were collected through interviews with export document staff, operational staff, and the Branch Manager, supported by direct observation and documentation. Data were analyzed using an interactive model consisting of data collection, data reduction, data display, and conclusion drawing. Data validity was ensured through source triangulation, technique triangulation, and member checking. The results show that Phytosanitary Certificate management generally follows six stages of quarantine procedures: user registration, submission of the Quarantine Inspection Application, administrative inspection, quarantine action through physical inspection, determination of inspection results, and certificate issuance and distribution. These stages are complemented by operational activities, including preparation of prerequisite documents, cargo space booking, and buyer approval of the draft certificate before final issuance. The main obstacles are the long buyer approval process, ranging from one to four days, and data discrepancies identified during stuffing. To address these obstacles, the company implements preventive measures, including routine reminders, document verification, additional time buffers, and coordination with quarantine authorities. Reactive measures include negotiations with warehouse owners when operational problems occur. The study concludes that effective document management requires timely coordination among the company, buyers, warehouses, and quarantine authorities. Strengthening communication with buyers is particularly important to accelerate draft approval and support a more efficient veneer wood export process.