Journal of Civil and Construction Engineering
Published by MAT Journals
- Scilit
- Concrete
- Product Engineering
- Climate Change
- Geotechnical Engineering
- Remote Sensing
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 2
- Total Publications
- 9
- Average Citations
- 0.22
- Cited Publications
- 2
- Cited Publications %
- 22.2%
- Self Citations
- 0
- Self Citations %
- 0%
- h5_index
- 1
- Monthly Citation Metric (MCM)
- 0.07
- Q1
- 0
- Med
- 0
- Q3
- 0
- 99%
- 1.9
- Max
- 2
- Citing Source Titles
- Citing Publishers
Latest Publications
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (3) , 40-56
Multi-Response Optimization of Mechanically Processed Recycled Aggregate for Concrete
The engineering performance of recycled aggregate concrete is strongly controlled by the quality of the recycled aggregate and, in particular, by the quantity and condition of adhered mortar. This study develops a multi-response interpretation of an experimental high-strength concrete dataset in which recycled coarse aggregate was mechanically processed for 0, 200, 500, and 700 Los Angeles abrasion-machine revolutions and incorporated at 0–100% replacement of virgin coarse aggregate. The analysis combines workability, density, 28-day compressive strength, flexural strength, split tensile strength, ultrasonic pulse velocity, and elastic modulus to identify a practical processing–replacement window. The source experimental programme used a high-strength concrete mix with a water-to-cement ratio of 0.26, silica fume, and polycarboxylate-ether superplasticizer. The results show that increasing replacement generally reduces hardened performance, whereas increasing processing intensity improves performance by reducing adhered mortar and improving the effective aggregate–paste interface. At 50% replacement, the reported 28-day compressive strength increased from 46.78 MPa for unprocessed aggregate to 73.23 MPa after 500 revolutions, while the corresponding value at 700 revolutions was 75.42 MPa. Thus, the incremental strength gain from 700 over 500 revolutions was only about 3%, indicating a diminishing-return region. Similar convergence was observed for UPV and elastic modulus. A 500-revolution treatment therefore emerges as a practical compromise between performance and processing demand, while replacement around 50% provides a useful balance between recycled-material utilization and structural performance. The paper presents the performance map based on replacement level and processing intensity and identifies the experimental variables.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (3) , 40-56
Multi-Response Optimization of Mechanically Processed Recycled Aggregate for Concrete
The engineering performance of recycled aggregate concrete is strongly controlled by the quality of the recycled aggregate and, in particular, by the quantity and condition of adhered mortar. This study develops a multi-response interpretation of an experimental high-strength concrete dataset in which recycled coarse aggregate was mechanically processed for 0, 200, 500, and 700 Los Angeles abrasion-machine revolutions and incorporated at 0–100% replacement of virgin coarse aggregate. The analysis combines workability, density, 28-day compressive strength, flexural strength, split tensile strength, ultrasonic pulse velocity, and elastic modulus to identify a practical processing–replacement window. The source experimental programme used a high-strength concrete mix with a water-to-cement ratio of 0.26, silica fume, and polycarboxylate-ether superplasticizer. The results show that increasing replacement generally reduces hardened performance, whereas increasing processing intensity improves performance by reducing adhered mortar and improving the effective aggregate–paste interface. At 50% replacement, the reported 28-day compressive strength increased from 46.78 MPa for unprocessed aggregate to 73.23 MPa after 500 revolutions, while the corresponding value at 700 revolutions was 75.42 MPa. Thus, the incremental strength gain from 700 over 500 revolutions was only about 3%, indicating a diminishing-return region. Similar convergence was observed for UPV and elastic modulus. A 500-revolution treatment therefore emerges as a practical compromise between performance and processing demand, while replacement around 50% provides a useful balance between recycled-material utilization and structural performance. The paper presents the performance map based on replacement level and processing intensity and identifies the experimental variables.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (3) , 15-28
Barriers to Successful Completion of Urban Water Supply Projects: A Quantitative Performance Analysis of Nine UWSSP Subprojects in Western Nepal
Urban water supply projects in Nepal frequently experience significant delays and cost overruns, yet systematic quantitative analysis of their performance remains limited. This study analyzes the quantitative performance of nine recently completed Urban Water Supply and Sanitation (Sector) Project (UWSSP) subprojects in Western Nepal, examining time overruns, extensions of time (EoT), Variation Orders (VO), and cost variance. Using project summary records from the Western Regional Project Management Office, the study found that all nine subprojects experienced universal time overruns ranging from 39.7% to 137.1% (average 69.0%), with eight of nine projects receiving three or more EoTs and seven of nine receiving two or more VOs. Counterintuitively, all projects were completed under budget relative to initial contract amounts, with cost variances ranging from -2.6% to -25.5% (average -12.4%). Tikapur Storm Water Drainage Project performed best on schedule (39.7% overrun), while Purnagiri WSS performed worst (137.1% overrun). The findings challenge conventional project management assumptions by demonstrating that severe schedule delays can coexist with apparent cost underruns. The study contributes empirical evidence on infrastructure project performance in Nepal's unique institutional context and provides baseline data for future comparative research.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (3) , 15-28
Barriers to Successful Completion of Urban Water Supply Projects: A Quantitative Performance Analysis of Nine UWSSP Subprojects in Western Nepal
Urban water supply projects in Nepal frequently experience significant delays and cost overruns, yet systematic quantitative analysis of their performance remains limited. This study analyzes the quantitative performance of nine recently completed Urban Water Supply and Sanitation (Sector) Project (UWSSP) subprojects in Western Nepal, examining time overruns, extensions of time (EoT), Variation Orders (VO), and cost variance. Using project summary records from the Western Regional Project Management Office, the study found that all nine subprojects experienced universal time overruns ranging from 39.7% to 137.1% (average 69.0%), with eight of nine projects receiving three or more EoTs and seven of nine receiving two or more VOs. Counterintuitively, all projects were completed under budget relative to initial contract amounts, with cost variances ranging from -2.6% to -25.5% (average -12.4%). Tikapur Storm Water Drainage Project performed best on schedule (39.7% overrun), while Purnagiri WSS performed worst (137.1% overrun). The findings challenge conventional project management assumptions by demonstrating that severe schedule delays can coexist with apparent cost underruns. The study contributes empirical evidence on infrastructure project performance in Nepal's unique institutional context and provides baseline data for future comparative research.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (2) , 42-65
Active Protection of Corroded Steel Reinforcement Embedded in FRP-Wrapped Concrete
Ignoring the fact that steel and concrete are among the building materials that are used in civil engineering more often than any other material, people are preoccupied with the lifetime of the material. This is due to the fact that reinforced concrete is one of the construction materials that has the lowest overall cost. The corrosion of steel in concrete is the most worrisome problem because it accelerates the degradation of concrete infrastructure and is the major driver of the problem. Other concerns include concrete structures that have been affected by corrosion, which undergo a gradual process of structural degradation comprising numerous distinct stages over the period of the structure’s service life. This process occurs throughout the lifespan of the structure. In reinforced concrete structures, corrosion is one of the most prevalent factors contributing to structural collapse. These phases include the onset of corrosion, cracking of concrete, excessive deflection, and finally, the collapse of the building as a consequence of the loss of structural strength. All of these stages lead to the last step, which is the collapse of the structure. Monitoring is being provided for an increasing number of concrete structures, with the goal of extending the useful life of these structures. A wide range of damage detection techniques, including explosive and nondestructive approaches, have been developed over the last several decades. This was performed to investigate the changes caused by corrosion.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (2) , 42-65
Active Protection of Corroded Steel Reinforcement Embedded in FRP-Wrapped Concrete
Ignoring the fact that steel and concrete are among the building materials that are used in civil engineering more often than any other material, people are preoccupied with the lifetime of the material. This is due to the fact that reinforced concrete is one of the construction materials that has the lowest overall cost. The corrosion of steel in concrete is the most worrisome problem because it accelerates the degradation of concrete infrastructure and is the major driver of the problem. Other concerns include concrete structures that have been affected by corrosion, which undergo a gradual process of structural degradation comprising numerous distinct stages over the period of the structure’s service life. This process occurs throughout the lifespan of the structure. In reinforced concrete structures, corrosion is one of the most prevalent factors contributing to structural collapse. These phases include the onset of corrosion, cracking of concrete, excessive deflection, and finally, the collapse of the building as a consequence of the loss of structural strength. All of these stages lead to the last step, which is the collapse of the structure. Monitoring is being provided for an increasing number of concrete structures, with the goal of extending the useful life of these structures. A wide range of damage detection techniques, including explosive and nondestructive approaches, have been developed over the last several decades. This was performed to investigate the changes caused by corrosion.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (1) , 28-41
Bibliometric Analysis of Project Delay Research in Nepal (2014–2025)
Project delays and cost overruns are common in Nepal’s construction sector. This study maps how research on these issues has grown and what it mainly discusses. Papers were collected from Nepal Journals Online (NepJOL) and the IOE Graduate Conference Proceedings from 2014 to 2025. Of the 48 records, 33 papers were included after screening. VOSviewer was used to examine publication trends, key sources, author collaboration, and major topics using keyword links and bibliographic coupling. Results show a clear rise in delay-related studies in recent years, mostly published in local journals and conference proceedings. Many studies focus on hydropower and road projects and often use survey methods such as the relative importance Index (RII) and risk/performance frameworks. Author collaboration is limited and mainly involves a small group of researchers and institutions. This review summarizes the main themes and highlights gaps for future studies in Nepal.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (1) , 28-41
Bibliometric Analysis of Project Delay Research in Nepal (2014–2025)
Project delays and cost overruns are common in Nepal’s construction sector. This study maps how research on these issues has grown and what it mainly discusses. Papers were collected from Nepal Journals Online (NepJOL) and the IOE Graduate Conference Proceedings from 2014 to 2025. Of the 48 records, 33 papers were included after screening. VOSviewer was used to examine publication trends, key sources, author collaboration, and major topics using keyword links and bibliographic coupling. Results show a clear rise in delay-related studies in recent years, mostly published in local journals and conference proceedings. Many studies focus on hydropower and road projects and often use survey methods such as the relative importance Index (RII) and risk/performance frameworks. Author collaboration is limited and mainly involves a small group of researchers and institutions. This review summarizes the main themes and highlights gaps for future studies in Nepal.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (2) , 13-21
Prioritizing Technical Challenges and Management Strategies in Lift Irrigation Projects: An RII–Pareto Approach from Surkhet, Nepal
Home / Archives / Vol. 12 No. 2 (2026) / Articles Prioritizing Technical Challenges and Management Strategies in Lift Irrigation Projects: An RII–Pareto Approach from Surkhet, Nepal
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (2) , 13-21
Prioritizing Technical Challenges and Management Strategies in Lift Irrigation Projects: An RII–Pareto Approach from Surkhet, Nepal
Home / Archives / Vol. 12 No. 2 (2026) / Articles Prioritizing Technical Challenges and Management Strategies in Lift Irrigation Projects: An RII–Pareto Approach from Surkhet, Nepal
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (2) , 22-31
Comparative Study of Compressive Strength between Natural Concrete and Recycled Concrete
This study discusses the use of recycled coarse aggregate (RCA) as a partial replacement for natural coarse aggregate (NCA) in concrete construction. Three replacement proportions (15%, 30%, 45%) were used to compare compressive strength and material cost with 0% replacement concrete. The mix design of 1:1.36:2.67 was used with a water-cement ratio (w/c) of 0.45. Compressive strength was determined at 14 days and 28 days by testing 6 cubes for each proportion. Among all proportions, including 0% replacement, the average compressive strength for 14-day and 28-day concrete at 30% replacement was 36.66 MPa and 37.83 MPa, respectively—the highest overall. Non-destructive test (rebound hammer) numbers ranged from 26 to 29, indicating fair concrete. Impact values (19–25%) and Los Angeles Abrasion values (18–29%) suggest suitability for wearing courses. Cost analysis showed up to 13.22% reduction in material cost with 45% RCA replacement. It is concluded that NCA can be replaced by RCA up to 45% when the RCA age is approximately 2 years.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (2) , 22-31
Comparative Study of Compressive Strength between Natural Concrete and Recycled Concrete
This study discusses the use of recycled coarse aggregate (RCA) as a partial replacement for natural coarse aggregate (NCA) in concrete construction. Three replacement proportions (15%, 30%, 45%) were used to compare compressive strength and material cost with 0% replacement concrete. The mix design of 1:1.36:2.67 was used with a water-cement ratio (w/c) of 0.45. Compressive strength was determined at 14 days and 28 days by testing 6 cubes for each proportion. Among all proportions, including 0% replacement, the average compressive strength for 14-day and 28-day concrete at 30% replacement was 36.66 MPa and 37.83 MPa, respectively—the highest overall. Non-destructive test (rebound hammer) numbers ranged from 26 to 29, indicating fair concrete. Impact values (19–25%) and Los Angeles Abrasion values (18–29%) suggest suitability for wearing courses. Cost analysis showed up to 13.22% reduction in material cost with 45% RCA replacement. It is concluded that NCA can be replaced by RCA up to 45% when the RCA age is approximately 2 years.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (1) , 50-58
A Study on the Effectiveness of Electronic Building Permit System (EBPS) in Tulsipur Submetropolitan City Using TAM Model
As society embraces digital transformation, building permit processes through electronic systems present a promising solution to streamline approvals. This study aims to assess the current status of the permit system and identify challenges in implementing an Electronic Building Permit System (EBPS). The research employs a mixed-method approach, beginning with surveys of municipal officers, engineers, and designers to evaluate the present state of the permit system. The Technology Acceptance Model (TAM) is used to analyse how users perceive the EBPS. Descriptive analysis is used to interpret these findings. To uncover specific challenges in EBPS, the study incorporates a questionnaire survey and Relative Importance Index (RII) analysis, drawing from primary data sources. Tulsipur Sub-Metropolitan City (TSMC) is advancing from Level 0 to Level 1 in automating its building permit process. Still, it faces significant hurdles, including inadequate training, a shortage of EBPS professionals, and resistance to change. To address these challenges, the study recommends raising awareness among proponents and in-house staff, implementing comprehensive training programs, gradually introducing EBPS with government support, and establishing legal frameworks and standardized tools. These measures and efforts to attract skilled professionals and explore funding options are crucial for successfully adopting an electronic-based building permit system.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (1) , 50-58
A Study on the Effectiveness of Electronic Building Permit System (EBPS) in Tulsipur Submetropolitan City Using TAM Model
As society embraces digital transformation, building permit processes through electronic systems present a promising solution to streamline approvals. This study aims to assess the current status of the permit system and identify challenges in implementing an Electronic Building Permit System (EBPS). The research employs a mixed-method approach, beginning with surveys of municipal officers, engineers, and designers to evaluate the present state of the permit system. The Technology Acceptance Model (TAM) is used to analyse how users perceive the EBPS. Descriptive analysis is used to interpret these findings. To uncover specific challenges in EBPS, the study incorporates a questionnaire survey and Relative Importance Index (RII) analysis, drawing from primary data sources. Tulsipur Sub-Metropolitan City (TSMC) is advancing from Level 0 to Level 1 in automating its building permit process. Still, it faces significant hurdles, including inadequate training, a shortage of EBPS professionals, and resistance to change. To address these challenges, the study recommends raising awareness among proponents and in-house staff, implementing comprehensive training programs, gradually introducing EBPS with government support, and establishing legal frameworks and standardized tools. These measures and efforts to attract skilled professionals and explore funding options are crucial for successfully adopting an electronic-based building permit system.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (1) , 18-27
Reusing Demolished Concrete Waste for the Production of Eco-friendly Concrete Blocks
The rapid expansion of construction and demolition activities has resulted in a substantial accumulation of concrete waste, posing both environmental and resource-management challenges. This study investigates the potential of using crushed demolished concrete waste as an alternative to natural coarse aggregates in the manufacture of eco-friendly concrete blocks. Recycled aggregates were processed from locally sourced demolition debris and incorporated into block mixes at replacement levels ranging from 0 to 100%. Concrete blocks were manufactured under controlled conditions and assessed through compressive strength and density testing at curing ages of 7, 14, and 28 days. Compressive strength was observed to decline systematically with increasing demolished aggregates. However, blocks containing up to 50% recycled aggregates exhibited performance levels suitable for non-load-bearing masonry applications. Higher replacement ratios, while showing reduced strength, remained structurally stable for partition walls and secondary construction uses. The findings confirm that demolished concrete waste can be effectively repurposed into functional masonry units, offering measurable material cost savings and contributing to sustainable construction practices by reducing landfill disposal and natural aggregate consumption.
- 1 January 2026
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 12 (1) , 18-27
Reusing Demolished Concrete Waste for the Production of Eco-friendly Concrete Blocks
The rapid expansion of construction and demolition activities has resulted in a substantial accumulation of concrete waste, posing both environmental and resource-management challenges. This study investigates the potential of using crushed demolished concrete waste as an alternative to natural coarse aggregates in the manufacture of eco-friendly concrete blocks. Recycled aggregates were processed from locally sourced demolition debris and incorporated into block mixes at replacement levels ranging from 0 to 100%. Concrete blocks were manufactured under controlled conditions and assessed through compressive strength and density testing at curing ages of 7, 14, and 28 days. Compressive strength was observed to decline systematically with increasing demolished aggregates. However, blocks containing up to 50% recycled aggregates exhibited performance levels suitable for non-load-bearing masonry applications. Higher replacement ratios, while showing reduced strength, remained structurally stable for partition walls and secondary construction uses. The findings confirm that demolished concrete waste can be effectively repurposed into functional masonry units, offering measurable material cost savings and contributing to sustainable construction practices by reducing landfill disposal and natural aggregate consumption.
- 25 February 2025
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 11 (1) , 53-65
Optimizing G+20 Multistorey Octagonal Building with Shear Wall and Floating Column
This paper examines a multistorey building with G+20 floors that is designed in a complicated octagonal shape. In contrast to normal structures, which usually consist of four-facing sides, the octagonal-shaped building has eight-facing sides and has the advantage of an open core in the center that allows for proper air circulation and natural light to be provided throughout the day. The G+20 storey building is complicated, with different kinds of irregularities at different levels in the floors. With floating columns that trigger the structure to have critical zones due to the discontinuity of the load transfer path leads to poor performance and boosted displacement in the building. This work focuses on the outcome compression of three models: model I is a straightforward, RC-framed building; Model II is a structure with floating columns; and Model III is a building with floating columns and a shear wall in the center. ETABS v2016 software has been utilized to perform response spectrum analysis to evaluate several characteristics including storey displacement and storey drifts. When comparing the models, model III has come up with a lesser storey displacement by 50% and more strength as compared to other models.
- 25 February 2025
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 11 (1) , 53-65
Optimizing G+20 Multistorey Octagonal Building with Shear Wall and Floating Column
This paper examines a multistorey building with G+20 floors that is designed in a complicated octagonal shape. In contrast to normal structures, which usually consist of four-facing sides, the octagonal-shaped building has eight-facing sides and has the advantage of an open core in the center that allows for proper air circulation and natural light to be provided throughout the day. The G+20 storey building is complicated, with different kinds of irregularities at different levels in the floors. With floating columns that trigger the structure to have critical zones due to the discontinuity of the load transfer path leads to poor performance and boosted displacement in the building. This work focuses on the outcome compression of three models: model I is a straightforward, RC-framed building; Model II is a structure with floating columns; and Model III is a building with floating columns and a shear wall in the center. ETABS v2016 software has been utilized to perform response spectrum analysis to evaluate several characteristics including storey displacement and storey drifts. When comparing the models, model III has come up with a lesser storey displacement by 50% and more strength as compared to other models.
- 20 January 2025
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 11 (1) , 9-33
Seismic Performance Assessment of RC Buildings with Variable Soft Storey Configurations and Infill Masonry Using Nonlinear Pushover Analysis
Reinforced Concrete (RC) buildings with infill masonry walls are a prevalent construction practice in seismically active regions such as Nepal. However, rapid population growth has driven a surge in residential construction, often bypassing essential design considerations, including seismic safety. This oversight leaves many buildings susceptible to significant damage, even during low-intensity ground shaking. A critical factor influencing a building's seismic performance is the presence and placement of soft stories floors that are comparatively weaker or more flexible than others in the structure. These soft storeys can dramatically affect structural behavior during seismic events. Structural engineers frequently resort to increasing the dimensions of beams and columns to address these vulnerabilities. While this approach enhances structural capacity, it often results in inefficient and overly conservative designs. This study evaluates the seismic performance of RC buildings with varying soft storey levels and in fills masonry configurations through nonlinear pushover analysis using finite element simulations. The analysis compares bare frames, structures with different percentages of infill masonry, and fully infilled models. Key structural responses analyzed include base shear, performance points, deflection, storey drift, and hinge formation stages. The results reveal that increasing the quantity of infill masonry enhances performance points and base shear while reducing displacement. Storey drift ratios displayed sharp peaks at certain levels, followed by reductions. Capacity curves for frames with 25%, 50%, 75%, and 100% infill illustrated considerable variations in structural response. Fully infilled frames demonstrated higher base shear capacities but reduced roof displacements at the collapse stage compared to partially infilled frames. These findings underscore the critical role of infill masonry quantity and soft-storey positioning in seismic design. By addressing these factors, engineers can achieve a more effective balance between structural safety and design efficiency in reinforced concrete buildings.
- 20 January 2025
- Published by MAT Journals in Journal of Civil and Construction Engineering
- Vol. 11 (1) , 9-33
Seismic Performance Assessment of RC Buildings with Variable Soft Storey Configurations and Infill Masonry Using Nonlinear Pushover Analysis
Reinforced Concrete (RC) buildings with infill masonry walls are a prevalent construction practice in seismically active regions such as Nepal. However, rapid population growth has driven a surge in residential construction, often bypassing essential design considerations, including seismic safety. This oversight leaves many buildings susceptible to significant damage, even during low-intensity ground shaking. A critical factor influencing a building's seismic performance is the presence and placement of soft stories floors that are comparatively weaker or more flexible than others in the structure. These soft storeys can dramatically affect structural behavior during seismic events. Structural engineers frequently resort to increasing the dimensions of beams and columns to address these vulnerabilities. While this approach enhances structural capacity, it often results in inefficient and overly conservative designs. This study evaluates the seismic performance of RC buildings with varying soft storey levels and in fills masonry configurations through nonlinear pushover analysis using finite element simulations. The analysis compares bare frames, structures with different percentages of infill masonry, and fully infilled models. Key structural responses analyzed include base shear, performance points, deflection, storey drift, and hinge formation stages. The results reveal that increasing the quantity of infill masonry enhances performance points and base shear while reducing displacement. Storey drift ratios displayed sharp peaks at certain levels, followed by reductions. Capacity curves for frames with 25%, 50%, 75%, and 100% infill illustrated considerable variations in structural response. Fully infilled frames demonstrated higher base shear capacities but reduced roof displacements at the collapse stage compared to partially infilled frames. These findings underscore the critical role of infill masonry quantity and soft-storey positioning in seismic design. By addressing these factors, engineers can achieve a more effective balance between structural safety and design efficiency in reinforced concrete buildings.