International Journal of Industrialized Construction

Published by University of Alberta Libraries

Abbrev: Int. J. Ind. Constr.
EISSN 2563-5034
Database Coverage
  • Scilit
Journal Articles
All-time journal articles
24
2025 journal articles
0
Subject
  • Product Engineering

Publications Analysis

Publications in 2016-2026
Open Access Publications in 2016-2026
Top Subjects

Publications in 2016-2026.

SubjectPublications
Product Engineering
20
Manufacturing
10
Sustainability Studies
5
Supply Chain & Logistics
4
Facilities Management
2
AI & Machine Learning
2
Computer-Aided Engineering
2
Paper & Wood Materials Science
1
Management Sciences
1
Metallurgical Engineering
1

Top Countries

Publications in 2016-2026.

CountryPublications
Canada
4
United States
4
Singapore
1
Germany
1
India
1
United Kingdom
1
Australia
1

Citation analysis
Publications published in 2023-2024 and cited in 2025.
Total Citations
0
Total Publications
0
Average Citations
0.00
Cited Publications
0
Cited Publications %
0%
Self Citations
0
Self Citations %
0%

Metrics
h5_index
3
Monthly Citation Metric (MCM)
0

Citations per year
All citations in 2016-2026

Citation Distribution
All citations to publications in 2023-2024.
Q1
0
Med
0
Q3
0
99%
0
Max
0

Citation Origins
Publications published in 2023-2024 and cited in 2025.
Citing Source Titles
Citing Publishers

Latest Publications

  • Open Access

    A Multidimensional Framework for Construction Worker Well Being: Implications for Off-Site Construction Transitions

    by Deyaaldeen Alnakdali, Sena Assaf, Tadesse Zelele, Natalia Cooper, Mohamed Al-Hussein, Ahmed Bouferguene

    Worker well-being in construction is increasingly recognized as a prerequisite for sustainable performance and retention, yet it is often addressed narrowly through physical safety indicators. This paper conceptualizes construction well-being as a multidimensional phenomenon shaped by managerial support, personal, physical, career, financial, environmental, and task-related dimensions. A targeted literature synthesis was conducted to consolidate evidence on key well-being drivers in traditional on-site construction and to translate these insights into practical implications for the industry's transition toward off-site construction (OSC). This has become an essential step since the industry is shifting more towards OSC for efficient, sustainable, and safe construction in controlled environments. The synthesis indicates that on-site construction concentrates risks through uncontrolled outdoor conditions, schedule pressure, long working hours, variable supervisory practices, and workplace stressors such as workload strain and interpersonal conflict. OSC can reconfigure, rather than eliminate, these risks by relocating work to production facilities with greater potential to control indoor environmental quality and by standardizing workflows. However, OSC also introduces distinct challenges, including machinery-related indoor noise, repetitive task demands, and potential reductions in autonomy under closer monitoring. Based on the comparative synthesis, the paper proposes dimension-specific lessons learned, including risks and opportunities, for enhancing worker well-being during OSC transitions, emphasizing proactive environmental monitoring, supportive leadership routines, predictable scheduling, structured training pathways, and embedded inclusion practices. The resulting implications provide a worker-centered roadmap for organizations seeking to scale OSC without overlooking the human element.


  • Open Access

    Economic and Financial Implications of Shifting from Onsite to Off Site Construction: Evidence from Industry Stakeholders

    by Tadesse Zelele, Xue Chen, Mohamed Assaf, Sena Assaf, Mohammad Elahi, Deyaaldeen Alnakdali, Aryan Hojjati, Joon Hwang, Sang Jun Ahn, Ahmed Bouferguene, et al.

    Off-site construction (OSC) is associated with potential improvements in cost efficiency and schedule performance, but its adoption outcomes and stakeholder perceptions remain under-evaluated. This study examines stakeholder perceptions of the economic and financial impacts of OSC transition using survey evidence from Edmonton, Canada. An 8-question structured questionnaire was administered in person to OSC stakeholders representing different firm sizes and annual OSC delivery volumes. The survey captured perceptions of (i) overall project cost impact, (ii) affected cost components, (iii) economic/financial drivers, (iv) cash-flow restructuring, and (v) financing period changes. Data were analyzed using descriptive statistics and cross-tabulation (including comparisons by annual OSC project volume as a proxy for OSC maturity/experience). Results show heterogeneous perceptions of overall cost impact: respondents reported expected cost decreases, cost increases, and uncertainty. Material, labor, and site management costs were identified as the most affected cost components. Shorter project schedules were the most frequently selected economic driver, followed by reduced waste/rework, improved quality, and greater cost certainty. In contrast, cash-flow and financing-period impacts were perceived less consistently, with high uncertainty among lower-volume firms. Higher-volume firms more often identified larger early-stage expenditures as a key cash-flow shift. The findings provide perception-based evidence on economic and financial barriers/enablers of OSC transition and support the need for clearer cost and financing benchmarks to accelerate adoption.


  • Open Access

    Designing an Integrative and Ubiquitous Lean Culture: A Cartographic Exploration of Sustainable Project Discourses

    by Fatma Zahra Ayari, Ines Sahtout Gaha

    This work offers a renewed interpretation of Lean culture through a cartographic approach applied to scientific discourse on sustainable projects. In the current construction sector, marked by increasing demands for sustainability, efficiency, and organizational transformation, numerous contributions highlight Lean’s structuring role as a lever for governance, value creation, and performance. However, the notion of Lean culture remains unstructured and sometimes traditional, oscillating among philosophy, tools, values, and practices. This ambiguity calls for clarification of its definitions, uses, and conceptual evolution. To address this issue, the research adopts a branching mapping methodology that identifies Lean both as a method and as a practice, aiming to analyze, visualize, and structure existing discourse through networks of co-occurrence and conceptual convergence. The analysis is conducted using an international scientific corpus and visualized through the VOSviewer platform, which highlights thematic clusters connecting Lean, organizational culture, design, sustainability, and project management. This exploration reveals discursive dynamics that progressively reframe Lean within an integrative cultural perspective. It shows how cognitive, procedural, and normative dimensions interact to support transitions toward more responsible and sustainable project practices. The article proposes a structured conceptualization of this integrative Lean culture, supported by diagrams that articulate the interactions between Lean, design culture, and sustainability objectives. The purpose of this contribution is to provide a deeper and more nuanced interpretative framework for existing discourse while identifying new avenues for research and practical application. More specifically, it seeks to underscore the ubiquitous nature of Lean through the lens of design, fostering a more integrated, cross-functional Lean approach that is closely aligned with the cultural dynamics and sustainability imperatives shaping contemporary project environments.


  • Open Access

    Protective Coating Strategies for Additively Manufactured Steel Components in Modular and Offsite Construction

    by Atef Zekri, Brahim Aissa

    Additive manufacturing (AM) of steel components is emerging as an enabling technology for modular and offsite construction, offering design flexibility, digital fabrication, and rapid replacement of critical components. However, additively manufactured steels exhibit distinct surface and microstructural features, including increased roughness, porosity, and residual stresses, which can reduce resistance to corrosion and hydrogen-assisted degradation and limit their long-term durability in construction environments. This paper presents a focused mini-review of protective coating strategies for AM steel components, with emphasis on metallic-doped anti-corrosion coatings that also act as barriers to hydrogen-assisted degradation. This paper reviews recent experimental results on conventionally manufactured steel substrates, showing how dopants such as molybdenum, chromium, zirconium diboride, and titanium carbide modify the coating microstructure, reduce defect pathways, and enhance resistance to corrosion and hydrogen diffusion. These mechanisms are critically examined in terms of their relevance to additively manufactured substrates. Coating deposition techniques relevant to modular construction applications are reviewed, including electroless plating, physical vapor deposition, thermal spraying, cold spray, and laser cladding, with attention to their suitability for coating AM steel components with complex geometries. Common characterization approaches, including electrochemical testing and gas-phase hydrogen permeation measurements, are summarized to illustrate how coating performance relates to service-relevant degradation mechanisms. The review highlights that while most existing studies focus on conventionally manufactured steels, the underlying coating mechanisms provide transferable design principles for AM alloys. Key findings indicate that metallic-doped coatings can significantly enhance barrier performance and durability, but coating architectures must be adapted to accommodate AM-specific surface features. The paper outlines how coating architectures must be adapted to accommodate AM-specific surface features, supporting the reliable deployment of additively manufactured steel components in modular and offsite construction systems.

  • Open Access

    Safer, Faster, Greener, Better & Lower Cost: Integrated Project Delivery Creates Good Conditions for Modular Offsite Construction

    by Alan Mossman

    The purpose of this paper is to encourage construction customers (= public or private sector owners, clients, principals, employers), as well as those who deliver construction, to consider Integrated Project Delivery (IPD) or Project Alliancing (PA) to procure construction generally and particularly Modular Offsite Construction (MOC). MOC has the potential to be safer, faster, greener, better quality and lower cost [SFGQ$] than other methods, provided key criteria are met. IPD/PA can increase the chances that delivery teams deliver a SFGQ$ project. Most construction is procured using bilateral, adversarial and transactional contracts that assume that no party can be trusted, encourage each party to maximise their own profits from the project at the expense of others while creating significant inflexibility within the team. Delivering MOC requires close collaboration between designers, fabricators and constructors. Delivering complex projects requires team members able to work flexibly and quickly make changes to create what is best for the project. IPD/PA can be set up so that all the major parties on a project are aligned to support the customer’s intention – while they all become advocates for the project. IPD/PA creates relationships among and between multiple parties as the basis for designing and delivering a project when little is known about the project detail at the outset – these are relational rather than transactional agreements. IPD/PA enable designers and constructors to work flexibly with the customer to create what the customer wants. This paper looks at critical governance and commercial arrangements that need considering for MOC to work for customers and particularly those in the public sector.

  • Open Access

    Improving Information Flow in Building Energy Audits: A Lean Analysis of Structured Mobile Data Capture

    by Soufiane Zoumehri, Zoubeir Lafhaj, Laure Ducoulombier, Pascal Yim, Rida Zerrari, Saad El Babidi, Emilie Fessler, Romain Raullet

    Building energy audit missions are information-intensive service processes in which delays emerge at handoffs between preparation, field visit, consolidation, simulation, reporting, and client validation. This study diagnoses process losses across the mission flow and examines the pilot contribution of a structured mobile data collection application in two agencies. An exploratory mixed-method case study combined two anonymized questionnaires (six practitioners and three managers), count-based descriptive summaries, and deductive analysis of open answers. Because the application was still under pilot deployment, and because the comparison relied on recalled similar missions rather than matched controls, the numerical results are reported as raw counts and interpreted as directional tendencies rather than statistically generalizable effects. Losses were mainly concentrated in pre-visit input readiness, post-visit data continuity, report production effort, and client iteration delays. In retrospective comparison with recalled similar missions without the application, five of six practitioners reported lower search time during drafting, four of six reported lower re-entry effort, and six of six reported lower post-visit missing-data frequency. Structured mobile capture mainly supported quality-at-source and continuity between field collection and office-based work, while end-to-end lead time remained constrained by upstream document readiness, validation loops, and other organizational factors.

  • Open Access

    Policy and Regulatory Barriers and Mitigation Strategies for Modular Offsite Construction (MOC) Adoption

    by Vafa Rostamiasl, Aida Aghlmand Azarian, Joon Ha Hwang, Aryan Hojjati, Jun Ahn, Mohamed Al-Hussein, Ahmed Bouferguene, Osama Moselhi

    Modular and Offsite Construction (MOC) is recognized for its potential to improve productivity, quality control, and delivery predictability in the construction sector. However, despite these advantages, large-scale adoption of MOC remains limited across many regions. This study investigates policy and regulatory barriers that affect MOC adoption through a two-stage multi-stakeholder survey involving public owners, private owners, production builders, and manufacturers. A total of 94 respondents from industry professionals and academics participated in the surveys (52 for the first survey and 42 for the second survey). The first survey identified and ranked key barriers that affect MOC adoption, and the second survey addressed mitigation strategies for the identified barriers. Although the research investigated multiple barrier categories, this paper focuses exclusively on policy and regulatory barriers such as approval processes, procurement systems and MOC-specific codes. The findings show that public owners showed the strongest concern regarding policy barriers in the form of approval delays and procurement inefficiencies as key barriers to MOC adoption. Although all stakeholder groups did not rank policy and regulatory-related barriers as their primary concern, many of the top-ranked mitigation strategies are policy related that require government intervention and regulatory clarification. Overall, the results highlight the key role of policy in enabling scalable MOC adoption in the construction industry.

  • Open Access

    An Automated Construction Learning Factory: Driving Digital Design, Additive Manufacturing, and Robotic Assembly with IFC

    by Casper A. Jensen, Jochen Teizer

    Construction automation remains fragmented, with Building Information Modeling (BIM), Additive Manufacturing (AM), and robotics operating as isolated technologies rather than integrated systems. This research presents and evaluates an integrated framework that connects and automates design, manufacturing, transportation and assembly through Industry Foundation Classes (IFC) data exchange within a physical Construction Learning Factory (CLF). Implemented at 1:50 scale, the framework demonstrates how standardized BIM data can drive coordinated automation across separate processes. Six high-detail modular building components were fabricated through an automated slicing and digital fabrication workflow, transported via autonomous navigation, and assembled in a controlled CLF setup within millimeter-level positioning accuracy. Performance evaluation comparing automated operation against manual control demonstrated measurable differences in consistency, accuracy, and throughput, while revealing inherent trade-offs between speed and reliability, especially in the context of transportation. The complete digital fabrication workflow – from IFC model through automated manufacturing, vision-triggered transport, to coordinate-driven assembly – operates without proprietary middleware, using open-format data exchange and relatively lightweight integration scripts. This work illustrates foundational capabilities for standardized, interoperable data workflows in construction automation. These implemented at larger scale can assist practitioners in real-world construction processes.

  • Open Access

    Panelized Wood Construction Quality Control in Real-Time: An Intelligent Framework

    by Djamel Eddine Touil, George Nader, Reza Enaloui, Ahmed Bouferguene, Mohamed Al-Hussein, Simaan AbouRizk

    Off-site construction increasingly employs panelized wood systems; however, reliance on low-cost softwood lumber introduces geometric defects such as twist, crook, and cup, which compromise framing quality and structural performance. This study presents a real-time, vision-based quality control framework for wood wall framing that detects and corrects nailing misalignment during production. A fine-tuned YOLOv8s model detects stud centers and nailer positions from industrial camera images, while a PLC-controlled actuator implements corrective adjustments in real-time. Experimental validation on a full-scale wood framing machine achieved a defect detection accuracy of 99.7% and maintained an average alignment error below 1 mm. A comparative evaluation confirms that YOLOv8s offers the best speed–accuracy trade-off for real-time deployment. The proposed framework shifts quality control from post-production inspection to in-process correction, thereby substantially enhancing manufacturing consistency in panelized wood construction.

  • Open Access

    Planning Governance in MMC Based Public Infrastructure Projects

    by Bernardo Martim Beck da Silva Etges, Marcus C. T. Fireman

    The construction sector is increasingly adopting Modern Methods of Construction (MMC) to improve productivity, predictability, and coordination in complex delivery environments. In public infrastructure projects, however, the distributed nature of production, extended logistics chains, and strong institutional constraints intensify planning and coordination challenges. While Lean Construction is recognized as a key enabler of MMC, existing research has primarily examined Lean practices in isolation or emphasized short-term planning routines, offering limited insight into how planning practices are articulated across planning horizons and governed in practice. This study investigates how Lean practices are articulated across planning horizons in MMC-based public infrastructure projects and how digital support shapes the governance of planning and control across construction sites. The research adopts a Design Science Research approach, grounded in action-oriented interventions implemented in multiple public infrastructure projects in Brazil. Empirical evidence was synthesized across projects to identify recurring patterns, governance mechanisms, and coordination challenges. The findings indicate that Lean planning practices are unevenly articulated across planning horizons, with relatively mature operational practices and persistent gaps at strategic and tactical levels, particularly in medium-term planning and off-site logistics coordination. Digital tools enhance transparency and situational awareness but do not, by themselves, ensure effective articulation across planning horizons. The paper contributes to MMC and Lean Construction research by reframing the Last Planner System as a planning governance mechanism and by highlighting the critical role of medium-term planning in governing distributed production systems in public infrastructure projects.