Journal Marine Inside
Published by Politeknik Pelayaran Banten
- Scilit
- Supply Chain & Logistics
- Electrical Energy Management
- Facilities Management
- Environmental Remediation
- Legionella Infection
- Combustion
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 5
- Total Publications
- 26
- Average Citations
- 0.19
- Cited Publications
- 4
- Cited Publications %
- 15.4%
- Self Citations
- 1
- Self Citations %
- 20%
- Q1
- 0
- Med
- 0
- Q3
- 0.8
- 99%
- 1.8
- Max
- 2
- Citing Source Titles
- Citing Publishers
Latest Publications
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 447-453
Hubungan efektivitas aplikasi Venus dengan kinerja karyawan pada proses crew change
Penelitian ini menganalisis hubungan efektivitas aplikasi Venus (Vessel Network System) dengan kinerja karyawan pada proses crew change di PT Pertamina International Shipping. Survei asosiatif melibatkan 60 responden yang dipilih secara purposif. Data kuesioner skala Likert dianalisis menggunakan statistik deskriptif dan regresi linear sederhana. Rata-rata skor efektivitas aplikasi dan kinerja karyawan masing-masing 4,54 dan 4,55 dari skala lima. Koefisien regresi yang dilaporkan sebesar 0,782 (p < 0,001), dengan R² sebesar 0,562. Model menjelaskan 56,2% variasi skor kinerja, bukan peningkatan kinerja yang disebabkan aplikasi. Hasil menunjukkan penilaian pengguna yang tinggi; data waktu penyelesaian administrasi aktual belum disajikan. This associative survey examines the relationship between perceived Venus application effectiveness and employee performance in crew change at PT Pertamina International Shipping. Likert-scale questionnaires were collected from 60 purposively selected respondents. Descriptive statistics and simple linear regression were used. Mean scores were 4.54 and 4.55 out of five, respectively. The reported regression coefficient was 0.782 (p < 0.001), with R² = 0.562. The model explains 56.2% of the variation in performance scores, rather than a causal improvement attributable to the application. Actual administrative processing times were not reported.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 447-453
Open AccessHubungan efektivitas aplikasi Venus dengan kinerja karyawan pada proses crew change
Penelitian ini menganalisis hubungan efektivitas aplikasi Venus (Vessel Network System) dengan kinerja karyawan pada proses crew change di PT Pertamina International Shipping. Survei asosiatif melibatkan 60 responden yang dipilih secara purposif. Data kuesioner skala Likert dianalisis menggunakan statistik deskriptif dan regresi linear sederhana. Rata-rata skor efektivitas aplikasi dan kinerja karyawan masing-masing 4,54 dan 4,55 dari skala lima. Koefisien regresi yang dilaporkan sebesar 0,782 (p < 0,001), dengan R² sebesar 0,562. Model menjelaskan 56,2% variasi skor kinerja, bukan peningkatan kinerja yang disebabkan aplikasi. Hasil menunjukkan penilaian pengguna yang tinggi; data waktu penyelesaian administrasi aktual belum disajikan. This associative survey examines the relationship between perceived Venus application effectiveness and employee performance in crew change at PT Pertamina International Shipping. Likert-scale questionnaires were collected from 60 purposively selected respondents. Descriptive statistics and simple linear regression were used. Mean scores were 4.54 and 4.55 out of five, respectively. The reported regression coefficient was 0.782 (p < 0.001), with R² = 0.562. The model explains 56.2% of the variation in performance scores, rather than a causal improvement attributable to the application. Actual administrative processing times were not reported.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 423-431
The Effect of Variability in Wind Speed and Sea Wave Height Conditions on Ship Berthing Efficiency at Sluke Port, Rembang
Penelitian ini menganalisis hubungan penilaian kondisi angin dan gelombang dengan persepsi efisiensi sandar kapal di Pelabuhan Sluke Rembang. Data kuesioner dari 50 awak kapal PT Pertamina Trans Kontinental dianalisis menggunakan regresi linear berganda. Koefisien regresi skor angin dan gelombang dilaporkan sebesar 0,449 dan 0,217 dengan R² 0,734. Koefisien tersebut bukan persentase kontribusi; arah interpretasinya bergantung pada pengkodean indikator. Data cuaca digunakan sebagai konteks operasional, bukan sebagai pengganti skor kuesioner. Hasil mendukung perlunya evaluasi dengan log waktu sandar dan pengukuran metocean yang berpasangan sebelum penetapan rekomendasi teknis atau klaim kausal. This study examines the association between perceived wind and wave conditions and perceived berthing efficiency at Sluke Port, Rembang. Questionnaire responses from 50 crew members of PT Pertamina Trans Kontinental were analyzed using multiple linear regression. Reported coefficients for wind and wave scores were 0.449 and 0.217, respectively, with R² = 0.734. These coefficients are not percentages of contribution; interpretation of their direction depends on item coding. Weather data provide operational context rather than substitute for questionnaire scores. Matched metocean measurements and berthing-time logs are needed before making causal or engineering recommendations.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 423-431
Open AccessThe Effect of Variability in Wind Speed and Sea Wave Height Conditions on Ship Berthing Efficiency at Sluke Port, Rembang
Penelitian ini menganalisis hubungan penilaian kondisi angin dan gelombang dengan persepsi efisiensi sandar kapal di Pelabuhan Sluke Rembang. Data kuesioner dari 50 awak kapal PT Pertamina Trans Kontinental dianalisis menggunakan regresi linear berganda. Koefisien regresi skor angin dan gelombang dilaporkan sebesar 0,449 dan 0,217 dengan R² 0,734. Koefisien tersebut bukan persentase kontribusi; arah interpretasinya bergantung pada pengkodean indikator. Data cuaca digunakan sebagai konteks operasional, bukan sebagai pengganti skor kuesioner. Hasil mendukung perlunya evaluasi dengan log waktu sandar dan pengukuran metocean yang berpasangan sebelum penetapan rekomendasi teknis atau klaim kausal. This study examines the association between perceived wind and wave conditions and perceived berthing efficiency at Sluke Port, Rembang. Questionnaire responses from 50 crew members of PT Pertamina Trans Kontinental were analyzed using multiple linear regression. Reported coefficients for wind and wave scores were 0.449 and 0.217, respectively, with R² = 0.734. These coefficients are not percentages of contribution; interpretation of their direction depends on item coding. Weather data provide operational context rather than substitute for questionnaire scores. Matched metocean measurements and berthing-time logs are needed before making causal or engineering recommendations.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 415-422
Analisis pengaruh kerusakan struktural deck jetty terhadap kapasitas dan efisiensi loading rate batu bara di jetty Mahakam Coal Terminal
Penelitian ini mengkaji keterkaitan kerusakan deck jetty dengan produktivitas pemuatan batu bara di Jetty Mahakam Coal Terminal melalui observasi, wawancara, dokumentasi dan pembobotan fishbone 5M+1E. Kondisi yang dilaporkan berupa retak beton, keausan lantai dan korosi. Data operasional 21–27 Juni dan 21–27 Agustus 2025 menunjukkan gross loading rate meningkat dari 134 menjadi 202 TPH (50,7%) dan nett loading rate dari 145 menjadi 210 TPH (44,8%). Kategori machine memperoleh skor tertinggi (180; dilaporkan 95%). Perbedaan periode dan skor penilaian tidak membuktikan penyebab struktural secara mandiri. Pengendalian operasional sementara dan inspeksi oleh tenaga ahli struktur diperlukan untuk mengevaluasi risiko dan menetapkan tindakan perbaikan. This study examines the relationship between deck jetty deterioration and coal-loading productivity at Mahakam Coal Terminal using observation, interviews, operational records and 5M+1E fishbone scoring. Reported deterioration includes concrete cracking, floor wear and corrosion. Operational records for 21–27 June and 21–27 August 2025 show gross loading rates of 134 and 202 TPH (50.7% increase), and net rates of 145 and 210 TPH (44.8% increase). The machine category received the highest score (180; reported as 95%). Period differences and rating scores alone do not establish structural causation. Temporary operational controls and inspection by qualified structural specialists are needed to evaluate risks and determine corrective actions.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 415-422
Open AccessAnalisis pengaruh kerusakan struktural deck jetty terhadap kapasitas dan efisiensi loading rate batu bara di jetty Mahakam Coal Terminal
Penelitian ini mengkaji keterkaitan kerusakan deck jetty dengan produktivitas pemuatan batu bara di Jetty Mahakam Coal Terminal melalui observasi, wawancara, dokumentasi dan pembobotan fishbone 5M+1E. Kondisi yang dilaporkan berupa retak beton, keausan lantai dan korosi. Data operasional 21–27 Juni dan 21–27 Agustus 2025 menunjukkan gross loading rate meningkat dari 134 menjadi 202 TPH (50,7%) dan nett loading rate dari 145 menjadi 210 TPH (44,8%). Kategori machine memperoleh skor tertinggi (180; dilaporkan 95%). Perbedaan periode dan skor penilaian tidak membuktikan penyebab struktural secara mandiri. Pengendalian operasional sementara dan inspeksi oleh tenaga ahli struktur diperlukan untuk mengevaluasi risiko dan menetapkan tindakan perbaikan. This study examines the relationship between deck jetty deterioration and coal-loading productivity at Mahakam Coal Terminal using observation, interviews, operational records and 5M+1E fishbone scoring. Reported deterioration includes concrete cracking, floor wear and corrosion. Operational records for 21–27 June and 21–27 August 2025 show gross loading rates of 134 and 202 TPH (50.7% increase), and net rates of 145 and 210 TPH (44.8% increase). The machine category received the highest score (180; reported as 95%). Period differences and rating scores alone do not establish structural causation. Temporary operational controls and inspection by qualified structural specialists are needed to evaluate risks and determine corrective actions.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 456-461
Analisis faktor penyebab keterlambatan proses sandar kapal tanker di TUKS Pertamina Semampir Barat Surabaya
Penelitian ini mengidentifikasi faktor keterlambatan sandar kapal tanker di TUKS Pertamina Semampir Barat Surabaya. Pendekatan deskriptif kualitatif menggunakan observasi, wawancara, dokumentasi, studi pustaka, diagram fishbone dan skor Likert. Informan berasal dari Marine Terminal Safety Inspection (MTSI), mooring gang dan agen. Lima kategori kendala teridentifikasi; skor tertinggi adalah fasilitas/mesin (88%), diikuti metode dan material (84%), manusia (83%), dan lingkungan (81%). Persentase tersebut adalah skor penilaian informan yang dilaporkan, bukan persentase kejadian keterlambatan. Perbaikan jetty, penerangan, dan koordinasi jadwal pandu-tunda menjadi fokus tindak lanjut. Jumlah informan dan log durasi penundaan belum dirinci, sehingga besarnya pengaruh tiap faktor belum dapat ditentukan. This descriptive qualitative study identifies tanker berthing delay factors at the Pertamina Semampir Barat private-use terminal (TUKS), Surabaya. Observation, interviews, documentation, literature, a fishbone diagram and Likert scores were used. Informants represented Marine Terminal Safety Inspection (MTSI), mooring crews and shipping agents. Five categories were identified; the reported highest score was facilities/equipment (88%), followed by methods and materials (84% each), personnel (83%) and environment (81%). These are informant assessment scores, not proportions of delay events. Jetty repairs, lighting and pilot/tug coordination are priorities. Informant counts and delay-duration logs were not specified, so effects on delay duration cannot be quantified.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 456-461
Open AccessAnalisis faktor penyebab keterlambatan proses sandar kapal tanker di TUKS Pertamina Semampir Barat Surabaya
Penelitian ini mengidentifikasi faktor keterlambatan sandar kapal tanker di TUKS Pertamina Semampir Barat Surabaya. Pendekatan deskriptif kualitatif menggunakan observasi, wawancara, dokumentasi, studi pustaka, diagram fishbone dan skor Likert. Informan berasal dari Marine Terminal Safety Inspection (MTSI), mooring gang dan agen. Lima kategori kendala teridentifikasi; skor tertinggi adalah fasilitas/mesin (88%), diikuti metode dan material (84%), manusia (83%), dan lingkungan (81%). Persentase tersebut adalah skor penilaian informan yang dilaporkan, bukan persentase kejadian keterlambatan. Perbaikan jetty, penerangan, dan koordinasi jadwal pandu-tunda menjadi fokus tindak lanjut. Jumlah informan dan log durasi penundaan belum dirinci, sehingga besarnya pengaruh tiap faktor belum dapat ditentukan. This descriptive qualitative study identifies tanker berthing delay factors at the Pertamina Semampir Barat private-use terminal (TUKS), Surabaya. Observation, interviews, documentation, literature, a fishbone diagram and Likert scores were used. Informants represented Marine Terminal Safety Inspection (MTSI), mooring crews and shipping agents. Five categories were identified; the reported highest score was facilities/equipment (88%), followed by methods and materials (84% each), personnel (83%) and environment (81%). These are informant assessment scores, not proportions of delay events. Jetty repairs, lighting and pilot/tug coordination are priorities. Informant counts and delay-duration logs were not specified, so effects on delay duration cannot be quantified.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 408-414
Analisis prioritas risiko kegagalan alat pelindung diri di kamar mesin KM Dharma Kencana IX menggunakan FMEA
Penelitian ini mengidentifikasi prioritas risiko kegagalan alat pelindung diri (APD) di kamar mesin KM Dharma Kencana IX menggunakan Failure Mode and Effect Analysis (FMEA). Data diperoleh dari observasi kondisi APD selama periode Juli 2025–Juli 2026, dokumentasi, wawancara dan kuesioner terhadap tiga narasumber. Risk Priority Number (RPN) dihitung sebagai hasil kali severity, occurrence, dan detection untuk setiap faktor kegagalan. Jumlah RPN tiga faktor pada masing-masing kelompok APD adalah 671 untuk safety shoes, 450 untuk wearpack, dan 258 untuk sarung tangan. Skala penilaian lengkap dan metode agregasi jawaban tiga penilai belum didokumentasikan. Hasil merupakan dasar prioritas inspeksi dan penggantian APD, bukan pengukuran probabilitas keandalan atau bukti penurunan kecelakaan dan biaya. This study identifies personal protective equipment (PPE) failure-risk priorities in the engine room of KM Dharma Kencana IX using Failure Mode and Effect Analysis (FMEA). Evidence comprised observations during July 2025–July 2026, documentation, interviews and questionnaires involving three informants. Each risk priority number (RPN) was calculated as severity × occurrence × detection. Summed RPNs across three factors per PPE group were 671 for safety shoes, 450 for workwear, and 258 for gloves. Full scoring anchors and the aggregation of the three assessors’ ratings are not documented. The results prioritize inspection and replacement rather than measure reliability probabilities or demonstrate reductions in accidents or costs.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 408-414
Open AccessAnalisis prioritas risiko kegagalan alat pelindung diri di kamar mesin KM Dharma Kencana IX menggunakan FMEA
Penelitian ini mengidentifikasi prioritas risiko kegagalan alat pelindung diri (APD) di kamar mesin KM Dharma Kencana IX menggunakan Failure Mode and Effect Analysis (FMEA). Data diperoleh dari observasi kondisi APD selama periode Juli 2025–Juli 2026, dokumentasi, wawancara dan kuesioner terhadap tiga narasumber. Risk Priority Number (RPN) dihitung sebagai hasil kali severity, occurrence, dan detection untuk setiap faktor kegagalan. Jumlah RPN tiga faktor pada masing-masing kelompok APD adalah 671 untuk safety shoes, 450 untuk wearpack, dan 258 untuk sarung tangan. Skala penilaian lengkap dan metode agregasi jawaban tiga penilai belum didokumentasikan. Hasil merupakan dasar prioritas inspeksi dan penggantian APD, bukan pengukuran probabilitas keandalan atau bukti penurunan kecelakaan dan biaya. This study identifies personal protective equipment (PPE) failure-risk priorities in the engine room of KM Dharma Kencana IX using Failure Mode and Effect Analysis (FMEA). Evidence comprised observations during July 2025–July 2026, documentation, interviews and questionnaires involving three informants. Each risk priority number (RPN) was calculated as severity × occurrence × detection. Summed RPNs across three factors per PPE group were 671 for safety shoes, 450 for workwear, and 258 for gloves. Full scoring anchors and the aggregation of the three assessors’ ratings are not documented. The results prioritize inspection and replacement rather than measure reliability probabilities or demonstrate reductions in accidents or costs.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 401-407
The effect of final disbursement account delays on principal satisfaction
Penelitian ini menganalisis hubungan skor keterlambatan Final Disbursement Account (FDA) dan kepuasan principal pada PT Garuda Unggul Nasional Cabang Tanjung Priok menggunakan mixed methods sequential explanatory. Data kuantitatif berasal dari 68 responden principal, dilanjutkan wawancara untuk menjelaskan konteks operasional. Regresi linear sederhana menghasilkan koefisien 0,577 (p < 0,001) dan R² sebesar 0,590. Arah pengkodean skor FDA perlu diperjelas sebelum hubungan positif ditafsirkan sebagai dampak keterlambatan atau pengelolaannya. Wawancara mengidentifikasi koordinasi operasional dan keuangan serta verifikasi dokumen sebagai bidang perbaikan. Temuan menunjukkan hubungan antarskor, bukan pengaruh kausal atau ukuran durasi keterlambatan aktual. This explanatory sequential mixed-methods study examines the association between Final Disbursement Account (FDA) delay scores and principal satisfaction at PT Garuda Unggul Nasional, Tanjung Priok Branch. Quantitative data from 68 principal respondents were followed by interviews to contextualize operational processes. Simple linear regression yielded a coefficient of 0.577 (p < 0.001) and R² of 0.590. The direction of FDA score coding must be clarified before interpreting this positive relationship as the effect of delays or of their management. Interviews identified interdepartmental coordination and document verification as improvement priorities. The findings represent an association between scores, not a causal effect or a measure of actual delay duration.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 401-407
Open AccessThe effect of final disbursement account delays on principal satisfaction
Penelitian ini menganalisis hubungan skor keterlambatan Final Disbursement Account (FDA) dan kepuasan principal pada PT Garuda Unggul Nasional Cabang Tanjung Priok menggunakan mixed methods sequential explanatory. Data kuantitatif berasal dari 68 responden principal, dilanjutkan wawancara untuk menjelaskan konteks operasional. Regresi linear sederhana menghasilkan koefisien 0,577 (p < 0,001) dan R² sebesar 0,590. Arah pengkodean skor FDA perlu diperjelas sebelum hubungan positif ditafsirkan sebagai dampak keterlambatan atau pengelolaannya. Wawancara mengidentifikasi koordinasi operasional dan keuangan serta verifikasi dokumen sebagai bidang perbaikan. Temuan menunjukkan hubungan antarskor, bukan pengaruh kausal atau ukuran durasi keterlambatan aktual. This explanatory sequential mixed-methods study examines the association between Final Disbursement Account (FDA) delay scores and principal satisfaction at PT Garuda Unggul Nasional, Tanjung Priok Branch. Quantitative data from 68 principal respondents were followed by interviews to contextualize operational processes. Simple linear regression yielded a coefficient of 0.577 (p < 0.001) and R² of 0.590. The direction of FDA score coding must be clarified before interpreting this positive relationship as the effect of delays or of their management. Interviews identified interdepartmental coordination and document verification as improvement priorities. The findings represent an association between scores, not a causal effect or a measure of actual delay duration.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 481-486
Analisis kerusakan crane dan dampaknya terhadap pemuatan batu bara ship to ship pada MV African Nightjar di Muara Berau
Penelitian studi kasus ini mengkaji kerusakan pulley crane pada pemuatan batu bara dengan metode ship to ship (STS) di MV African Nightjar, Muara Berau. Data diperoleh melalui observasi, wawancara, dokumentasi, dan kuesioner kepada empat responden, kemudian dianalisis secara deskriptif dengan diagram fishbone. Skor persentase yang dilaporkan untuk faktor manusia, pengawasan, material, dan lingkungan masing-masing 85%, 85%, 81%, dan 80%; penyebutnya belum dapat direkonsiliasi dari tabel. Estimasi durasi pemuatan berubah dari dua menjadi tiga hari. Keausan bearing merupakan indikasi teknis yang memerlukan pemeriksaan lebih lanjut. Rekomendasi meliputi inspeksi sesuai manual, pengadaan suku cadang dan pengawasan pengoperasian sesuai SWL. Temuan terbatas pada kasus ini dan tidak mengestimasi proporsi penyebab seluruh kerusakan STS. This case study examines crane pulley damage during ship-to-ship (STS) coal loading on MV African Nightjar at Muara Berau. Evidence comprised observations, interviews, documents, and questionnaires from four respondents, analysed descriptively using a fishbone diagram. Reported scores for human, supervision, material, and environmental factors were 85%, 85%, 81%, and 80%, respectively; their denominators cannot yet be reconciled from the table. Estimated loading duration changed from two to three days. Bearing wear is a technical indication requiring further inspection. Recommendations include manufacturer-based inspection, spare-part availability, and supervision of operation within SWL. Findings are confined to this case, not causal proportions of all STS failures.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 481-486
Open AccessAnalisis kerusakan crane dan dampaknya terhadap pemuatan batu bara ship to ship pada MV African Nightjar di Muara Berau
Penelitian studi kasus ini mengkaji kerusakan pulley crane pada pemuatan batu bara dengan metode ship to ship (STS) di MV African Nightjar, Muara Berau. Data diperoleh melalui observasi, wawancara, dokumentasi, dan kuesioner kepada empat responden, kemudian dianalisis secara deskriptif dengan diagram fishbone. Skor persentase yang dilaporkan untuk faktor manusia, pengawasan, material, dan lingkungan masing-masing 85%, 85%, 81%, dan 80%; penyebutnya belum dapat direkonsiliasi dari tabel. Estimasi durasi pemuatan berubah dari dua menjadi tiga hari. Keausan bearing merupakan indikasi teknis yang memerlukan pemeriksaan lebih lanjut. Rekomendasi meliputi inspeksi sesuai manual, pengadaan suku cadang dan pengawasan pengoperasian sesuai SWL. Temuan terbatas pada kasus ini dan tidak mengestimasi proporsi penyebab seluruh kerusakan STS. This case study examines crane pulley damage during ship-to-ship (STS) coal loading on MV African Nightjar at Muara Berau. Evidence comprised observations, interviews, documents, and questionnaires from four respondents, analysed descriptively using a fishbone diagram. Reported scores for human, supervision, material, and environmental factors were 85%, 85%, 81%, and 80%, respectively; their denominators cannot yet be reconciled from the table. Estimated loading duration changed from two to three days. Bearing wear is a technical indication requiring further inspection. Recommendations include manufacturer-based inspection, spare-part availability, and supervision of operation within SWL. Findings are confined to this case, not causal proportions of all STS failures.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 340-348
ANALISIS PENYEBAB MENURUNNYA KINERJA INJEKTOR DALAM PROSES PENGABUTAN PADA MESIN INDUK DI KAPAL MV. INTAN BARUNA
Injektor adalah komponen dalam sistem bahan bakar pada mesin diesel, yang berfungsi menyemprotkan bahan bakar ke dalam ruang bakar dengan tekanan tinggi. Namun, sering terjadi tersumbatnya nosel injektor dan o-ring yang getas, sehingga dapat mengakibatkan terhambatnya kinerja mesin. Penelitian ini bertujuan untuk mengetahui dan menganalisis penyebab tersumbatnya nosel injektor dan o-ring yang getas serta dampak apa yang akan di timbulkan terhadap kinerja mesin induk. Dalam penelitian ini, penulis menggunakan metode kualitatif deskriptif. Data yang diperoleh didapat melalui observasi, wawancara, studi pustaka, dan dokumentasi. Data juga dapat diperoleh dengan menggunakan Instruction Manual Book, sebagai pembanding untuk megetahui data yang normal. Hasil penelitian ini diharapkan dapat mengindentifikasi faktor-faktor penyebab tersumbatnya nosel injektor, o-ring yang getas dan dapat memberikan rekomendasi tindakan pencegahan agar permasalahan dapat diminimalisir. Dengan demikian, kinerja injektor akan bekerja dengan optimal untuk mendukung operasional mesin induk.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 340-348
Open AccessANALISIS PENYEBAB MENURUNNYA KINERJA INJEKTOR DALAM PROSES PENGABUTAN PADA MESIN INDUK DI KAPAL MV. INTAN BARUNA
Injektor adalah komponen dalam sistem bahan bakar pada mesin diesel, yang berfungsi menyemprotkan bahan bakar ke dalam ruang bakar dengan tekanan tinggi. Namun, sering terjadi tersumbatnya nosel injektor dan o-ring yang getas, sehingga dapat mengakibatkan terhambatnya kinerja mesin. Penelitian ini bertujuan untuk mengetahui dan menganalisis penyebab tersumbatnya nosel injektor dan o-ring yang getas serta dampak apa yang akan di timbulkan terhadap kinerja mesin induk. Dalam penelitian ini, penulis menggunakan metode kualitatif deskriptif. Data yang diperoleh didapat melalui observasi, wawancara, studi pustaka, dan dokumentasi. Data juga dapat diperoleh dengan menggunakan Instruction Manual Book, sebagai pembanding untuk megetahui data yang normal. Hasil penelitian ini diharapkan dapat mengindentifikasi faktor-faktor penyebab tersumbatnya nosel injektor, o-ring yang getas dan dapat memberikan rekomendasi tindakan pencegahan agar permasalahan dapat diminimalisir. Dengan demikian, kinerja injektor akan bekerja dengan optimal untuk mendukung operasional mesin induk.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 462-469
Analisis deskriptif penerapan Maritime Labour Convention (MLC) 2006 dan kinerja awak kapal bagian kamar mesin MV Sinabung
Industri pelayaran domestik menghadapi tantangan dalam menjamin kesejahteraan pelaut sesuai standar Maritime Labour Convention (MLC) 2006, khususnya pada lingkungan kerja kamar mesin MV. Sinabung yang memiliki suhu hingga 50°C dan tingkat kebisingan di atas 110 dBA. Penelitian ini bertujuan untuk menganalisis tingkat penerapan MLC 2006 dan kinerja awak kapal di bagian kamar mesin MV. Sinabung serta mengidentifikasi faktor penghambat penerapannya. Penelitian menggunakan pendekatan kuantitatif deskriptif dengan metode sensus terhadap 27 kru kamar mesin. Data dikumpulkan melalui kuesioner skala Likert dengan 25 indikator, observasi lapangan, dan telaah dokumen resmi kapal. Hasil penelitian menunjukkan bahwa penerapan MLC 2006 secara keseluruhan berada pada kategori baik dengan persentase 77,53%, sedangkan kinerja awak kapal berada pada kategori sangat baik dengan persentase 82,89%. Aspek hak finansial memperoleh capaian tertinggi sebesar 83,70%, sementara perlindungan jam istirahat saat tugas darurat menjadi aspek yang masih perlu diperhatikan. Faktor penghambat utama meliputi tuntutan operasional kapal dan kondisi lingkungan kamar mesin yang bising. Persentase tersebut merupakan skor capaian kuesioner, bukan hasil pengujian pengaruh MLC terhadap kinerja atau audit kepatuhan formal. The domestic shipping industry faces challenges in ensuring seafarers’ welfare in accordance with the Maritime Labour Convention (MLC) 2006 standards, particularly in the engine room environment of MV. Sinabung, where temperatures can reach 50°C and noise levels exceed 110 dBA. This study aims to analyze the implementation level of MLC 2006 and the performance of engine room crew members on MV. Sinabung, as well as to identify factors that hinder its implementation. This study employed a descriptive quantitative approach using a census method involving 27 engine room crew members. Data were collected through a 25-item Likert-scale questionnaire, field observations, and an examination of official vessel documents. The results showed that the overall implementation of MLC 2006 was categorized as good, with a percentage of 77.53%, while crew performance was categorized as very good, reaching 82.89%. Financial rights achieved the highest percentage at 83.70%, while protection of rest hours during emergency duties remained an aspect requiring attention. The main inhibiting factors were operational demands and the noisy engine room environment. These percentages describe questionnaire scores rather than a tested effect of MLC implementation on performance or a formal compliance audit.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 462-469
Open AccessAnalisis deskriptif penerapan Maritime Labour Convention (MLC) 2006 dan kinerja awak kapal bagian kamar mesin MV Sinabung
Industri pelayaran domestik menghadapi tantangan dalam menjamin kesejahteraan pelaut sesuai standar Maritime Labour Convention (MLC) 2006, khususnya pada lingkungan kerja kamar mesin MV. Sinabung yang memiliki suhu hingga 50°C dan tingkat kebisingan di atas 110 dBA. Penelitian ini bertujuan untuk menganalisis tingkat penerapan MLC 2006 dan kinerja awak kapal di bagian kamar mesin MV. Sinabung serta mengidentifikasi faktor penghambat penerapannya. Penelitian menggunakan pendekatan kuantitatif deskriptif dengan metode sensus terhadap 27 kru kamar mesin. Data dikumpulkan melalui kuesioner skala Likert dengan 25 indikator, observasi lapangan, dan telaah dokumen resmi kapal. Hasil penelitian menunjukkan bahwa penerapan MLC 2006 secara keseluruhan berada pada kategori baik dengan persentase 77,53%, sedangkan kinerja awak kapal berada pada kategori sangat baik dengan persentase 82,89%. Aspek hak finansial memperoleh capaian tertinggi sebesar 83,70%, sementara perlindungan jam istirahat saat tugas darurat menjadi aspek yang masih perlu diperhatikan. Faktor penghambat utama meliputi tuntutan operasional kapal dan kondisi lingkungan kamar mesin yang bising. Persentase tersebut merupakan skor capaian kuesioner, bukan hasil pengujian pengaruh MLC terhadap kinerja atau audit kepatuhan formal. The domestic shipping industry faces challenges in ensuring seafarers’ welfare in accordance with the Maritime Labour Convention (MLC) 2006 standards, particularly in the engine room environment of MV. Sinabung, where temperatures can reach 50°C and noise levels exceed 110 dBA. This study aims to analyze the implementation level of MLC 2006 and the performance of engine room crew members on MV. Sinabung, as well as to identify factors that hinder its implementation. This study employed a descriptive quantitative approach using a census method involving 27 engine room crew members. Data were collected through a 25-item Likert-scale questionnaire, field observations, and an examination of official vessel documents. The results showed that the overall implementation of MLC 2006 was categorized as good, with a percentage of 77.53%, while crew performance was categorized as very good, reaching 82.89%. Financial rights achieved the highest percentage at 83.70%, while protection of rest hours during emergency duties remained an aspect requiring attention. The main inhibiting factors were operational demands and the noisy engine room environment. These percentages describe questionnaire scores rather than a tested effect of MLC implementation on performance or a formal compliance audit.
- Open Access
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 349-354
Evaluasi kerusakan dan perawatan katup gas buang mesin induk pada AHTS Logindo Stamina
Penelitian ini mengkaji kerusakan katup gas buang silinder 6 pada mesin induk MAK 9M25C AHTS Logindo Stamina. Studi kasus deskriptif kualitatif menggunakan observasi, wawancara, dokumentasi dan catatan pemeliharaan. Pada 6 Mei 2026, level air pendingin HT turun hingga batas rendah, muncul asap hitam, dan temperatur gas buang silinder 6 tercatat 243°C. Pemeriksaan melaporkan kerusakan spindle, valve seat, flame ring dan O-ring. Setelah penggantian komponen, temperatur silinder 6 tercatat sekitar 365–367°C. Temuan mendukung inspeksi kondisi katup, pemantauan temperatur dan level pendingin, serta perawatan berbasis jam kerja sesuai manual. Karena pengamatan berasal dari satu kasus dan beberapa tindakan dilakukan bersamaan, kontribusi masing-masing tindakan belum dapat diisolasi. This descriptive qualitative case study examines exhaust-valve damage in cylinder 6 of the MAK 9M25C main engine on AHTS Logindo Stamina using observation, interviews, documentation and maintenance records. On 6 May 2026, the high-temperature cooling-water level fell to the low limit, black smoke appeared, and cylinder 6 exhaust temperature was recorded at 243°C. Inspection reported damage to the spindle, valve seat, flame ring and O-ring. Following component replacement, cylinder 6 temperature was approximately 365–367°C. The findings support condition inspection, exhaust-temperature and coolant-level monitoring, and running-hour-based maintenance according to the manufacturer manual. This single case does not isolate the effects of individual maintenance actions.
- 26 November 2026
- Published by Politeknik Pelayaran Banten in Journal Marine Inside
- Vol. 8 (2) , 349-354
Open AccessEvaluasi kerusakan dan perawatan katup gas buang mesin induk pada AHTS Logindo Stamina
Penelitian ini mengkaji kerusakan katup gas buang silinder 6 pada mesin induk MAK 9M25C AHTS Logindo Stamina. Studi kasus deskriptif kualitatif menggunakan observasi, wawancara, dokumentasi dan catatan pemeliharaan. Pada 6 Mei 2026, level air pendingin HT turun hingga batas rendah, muncul asap hitam, dan temperatur gas buang silinder 6 tercatat 243°C. Pemeriksaan melaporkan kerusakan spindle, valve seat, flame ring dan O-ring. Setelah penggantian komponen, temperatur silinder 6 tercatat sekitar 365–367°C. Temuan mendukung inspeksi kondisi katup, pemantauan temperatur dan level pendingin, serta perawatan berbasis jam kerja sesuai manual. Karena pengamatan berasal dari satu kasus dan beberapa tindakan dilakukan bersamaan, kontribusi masing-masing tindakan belum dapat diisolasi. This descriptive qualitative case study examines exhaust-valve damage in cylinder 6 of the MAK 9M25C main engine on AHTS Logindo Stamina using observation, interviews, documentation and maintenance records. On 6 May 2026, the high-temperature cooling-water level fell to the low limit, black smoke appeared, and cylinder 6 exhaust temperature was recorded at 243°C. Inspection reported damage to the spindle, valve seat, flame ring and O-ring. Following component replacement, cylinder 6 temperature was approximately 365–367°C. The findings support condition inspection, exhaust-temperature and coolant-level monitoring, and running-hour-based maintenance according to the manufacturer manual. This single case does not isolate the effects of individual maintenance actions.