SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Published by Universitas Majalengka
- Scilit
- Manufacturing
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 12
- Total Publications
- 101
- Average Citations
- 0.12
- Cited Publications
- 11
- Cited Publications %
- 10.9%
- Self Citations
- 0
- Self Citations %
- 0%
- Q1
- 0
- Med
- 0
- Q3
- 0
- 99%
- 2
- Max
- 3
- Citing Source Titles
- Citing Publishers
Latest Publications
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 67-76
IMPLEMENTASI PIPELINE DALAM PRODUKSI ANIMASI 3D UNTUK MEMPROMOSIKAN MEREK LOKAL
Di era teknologi yang terus berkembang, animasi 3D telah menjadi alat penting dalam periklanan modern untuk menarik perhatian audiens dan menyampaikan informasi produk dengan cara yang impactful. Artikel ini mengkaji berbagai penerapan animasi 3D dalam iklan, termasuk produk teknologi, promosi kebudayaan dan pariwisata, iklan perumahan, dan billboard, serta mengulas manfaat penggunaan pipeline produksi dalam konteks ini. Pipeline produksi animasi 3D menawarkan alur kerja yang terstruktur dan sistematis, meningkatkan efisiensi produksi melalui automasi tugas rutin, dan memastikan konsistensi kualitas. Pipeline juga mempermudah pengelolaan proyek dengan manajemen sumber daya yang efisien, penjadwalan yang efektif, dan fleksibilitas dalam menangani revisi. Artikel ini bertujuan untuk menunjukkan keuntungan animasi 3D dalam periklanan, menggali potensi aplikasinya dalam berbagai konteks, dan merekomendasikan metode serta teknik inovatif untuk memaksimalkan dampak iklan.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 67-76
Open AccessIMPLEMENTASI PIPELINE DALAM PRODUKSI ANIMASI 3D UNTUK MEMPROMOSIKAN MEREK LOKAL
Di era teknologi yang terus berkembang, animasi 3D telah menjadi alat penting dalam periklanan modern untuk menarik perhatian audiens dan menyampaikan informasi produk dengan cara yang impactful. Artikel ini mengkaji berbagai penerapan animasi 3D dalam iklan, termasuk produk teknologi, promosi kebudayaan dan pariwisata, iklan perumahan, dan billboard, serta mengulas manfaat penggunaan pipeline produksi dalam konteks ini. Pipeline produksi animasi 3D menawarkan alur kerja yang terstruktur dan sistematis, meningkatkan efisiensi produksi melalui automasi tugas rutin, dan memastikan konsistensi kualitas. Pipeline juga mempermudah pengelolaan proyek dengan manajemen sumber daya yang efisien, penjadwalan yang efektif, dan fleksibilitas dalam menangani revisi. Artikel ini bertujuan untuk menunjukkan keuntungan animasi 3D dalam periklanan, menggali potensi aplikasinya dalam berbagai konteks, dan merekomendasikan metode serta teknik inovatif untuk memaksimalkan dampak iklan.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 409-414
PEMBUATAN PART BRACKET PIPE MAIN L/SIDE 844A7-I7000 MENGGUNAKAN MESIN STAMPING PRESS
This practical work report explains the process of making the Bracket Pipe Main P/Side 844A7-17000part using a stamping press machine and operating procedures for the stamping press machine at PT Persada Selaras Indonesia. The aim is to find out directly the process of making the Bracket Pipe Main P/Side 844A7-17000 part, and to know how to operate the stamping press machine. The process of making the Bracket Pipe Main P/Side 844A7-17000 consists of several stages starting from checking the material using SPHC-PO, checking the product design, the Stamping Press process with four stages of the production process (blanking, bending 1 and forming, bending 2 and restrike, & Piercing). Apart from that, this report discusses how to operate a stamping press machine starting from the machine inspection stage to setting up the stamping press machine. Through this practical work report, it is hoped that readers will gain insight into the process of making the Bracket Pipe Main P/Side 844A7-17000 and the company's contribution to maintaining product quality.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 409-414
Open AccessPEMBUATAN PART BRACKET PIPE MAIN L/SIDE 844A7-I7000 MENGGUNAKAN MESIN STAMPING PRESS
This practical work report explains the process of making the Bracket Pipe Main P/Side 844A7-17000part using a stamping press machine and operating procedures for the stamping press machine at PT Persada Selaras Indonesia. The aim is to find out directly the process of making the Bracket Pipe Main P/Side 844A7-17000 part, and to know how to operate the stamping press machine. The process of making the Bracket Pipe Main P/Side 844A7-17000 consists of several stages starting from checking the material using SPHC-PO, checking the product design, the Stamping Press process with four stages of the production process (blanking, bending 1 and forming, bending 2 and restrike, & Piercing). Apart from that, this report discusses how to operate a stamping press machine starting from the machine inspection stage to setting up the stamping press machine. Through this practical work report, it is hoped that readers will gain insight into the process of making the Bracket Pipe Main P/Side 844A7-17000 and the company's contribution to maintaining product quality.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 394-401
METODE PELAKSANAAN PEKERJAAN PIERHEAD PADA PROYEK PEMBANGUNAN JEMBATAN CIKERUH DI JALAN RAYA CIBOLERANG KECAMATAN JATIWANGI KABUPATEN MAJALENGKA
ABSTRAK One of the important structures in the maritime industry, the pierhead construction used for various functions such as loading and unloading ships, stackinggoods, and other logistics activities. Hence, the construction of the pierhead requires careful planning and execution to ensure that the structure is strong, safe, and complies with safety standards and regulations applicable. The aim of carrying out this practical work is to know what is the process and method for implementing pierhead work on the project construction of the Cikeruh bridge on the Ciborelang highway, Jatiwangi District Majalengka Regency, know what tools and materials are used in carrying out pierhead work and how to care for the concrete. In the method of carrying out pierhead work there are eight stages work includes Preparatory Work, ringlock installation, Installation of working floors, concrete work, installation of formwork, pierhead casting, formwork dismantling and concrete maintenance. As for the tools used in carrying out the work Pierheads include: excavators, dump trucks, truck mixers, concrete pumps, pipes tremi, concrete vibrator, air compressor, wood cutting tool, crane, generator generator, hand tools, hand saws, wire cutters and electric drills. Meanwhile, the materials used in carrying out pierhead work namely using FC'40 concrete, reinforcing steel, 3x3 angle cast stop, ringlock, concrete decking, plywood coated with 1 side polyfilm (12 mm and 9 mm thick), profile steel or holow and wood (size 5/7 and 4/6), scaffolding, formwork oil andtie road.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 394-401
Open AccessMETODE PELAKSANAAN PEKERJAAN PIERHEAD PADA PROYEK PEMBANGUNAN JEMBATAN CIKERUH DI JALAN RAYA CIBOLERANG KECAMATAN JATIWANGI KABUPATEN MAJALENGKA
ABSTRAK One of the important structures in the maritime industry, the pierhead construction used for various functions such as loading and unloading ships, stackinggoods, and other logistics activities. Hence, the construction of the pierhead requires careful planning and execution to ensure that the structure is strong, safe, and complies with safety standards and regulations applicable. The aim of carrying out this practical work is to know what is the process and method for implementing pierhead work on the project construction of the Cikeruh bridge on the Ciborelang highway, Jatiwangi District Majalengka Regency, know what tools and materials are used in carrying out pierhead work and how to care for the concrete. In the method of carrying out pierhead work there are eight stages work includes Preparatory Work, ringlock installation, Installation of working floors, concrete work, installation of formwork, pierhead casting, formwork dismantling and concrete maintenance. As for the tools used in carrying out the work Pierheads include: excavators, dump trucks, truck mixers, concrete pumps, pipes tremi, concrete vibrator, air compressor, wood cutting tool, crane, generator generator, hand tools, hand saws, wire cutters and electric drills. Meanwhile, the materials used in carrying out pierhead work namely using FC'40 concrete, reinforcing steel, 3x3 angle cast stop, ringlock, concrete decking, plywood coated with 1 side polyfilm (12 mm and 9 mm thick), profile steel or holow and wood (size 5/7 and 4/6), scaffolding, formwork oil andtie road.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 35-42
Pembuatan Game 2D Melawan Virus Menggunakan Unity Engine
A game or game is something that can be played with certain rules so that there are winners and there are losers, usually in a context that is not serious with the purpose of refreshing. Various games include; action, action-adventure, simulation, construction, and management, role playing games (RPG), strategy, racing, sports, puzzles, and word games. To create a digital game, a game engine designed to develop video games on various platforms is required. The Unity Engine can be used to create 2D (two-dimensional) and 3D (three-dimensional) games and supports a wide range of cross-platform devices such as smartphones, PCs, PlayStation 5, and many other platforms. In this study, the researcher wants to implement the creation of a 2D game called LAVIR using the GDLC (Game Development Life Cycle) method. The creation of this game aims to reduce anxiety, fear and eliminate boredom.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 35-42
Open AccessPembuatan Game 2D Melawan Virus Menggunakan Unity Engine
A game or game is something that can be played with certain rules so that there are winners and there are losers, usually in a context that is not serious with the purpose of refreshing. Various games include; action, action-adventure, simulation, construction, and management, role playing games (RPG), strategy, racing, sports, puzzles, and word games. To create a digital game, a game engine designed to develop video games on various platforms is required. The Unity Engine can be used to create 2D (two-dimensional) and 3D (three-dimensional) games and supports a wide range of cross-platform devices such as smartphones, PCs, PlayStation 5, and many other platforms. In this study, the researcher wants to implement the creation of a 2D game called LAVIR using the GDLC (Game Development Life Cycle) method. The creation of this game aims to reduce anxiety, fear and eliminate boredom.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 141-148
RANCANG BANGUN TRANSMIS MESIN PERONTOK 3600 RPM BERBASIS MOTOR BENSIN
A rice threshing machine is the process of separating rice from its stems, so that reducing rice agricultural yields is very strategic in supporting rice production. Modification of the tool which previously used a slamming system, resulted in the yield of grain containing quite high levels of grain. The aim of this research is to design the transmission rotation to make the belt pulley and shaft more effective. The rice threshing machine transmission system consists of a pulley and belt with various belt sizes. The appearance of the pulley for calculations is adjusted to a pulley size of 10 inches = 25.4cm. Then the belt that connects the 10 inch/25.4cm pulley and the 9.74cm A58 belt is the belt that connects the pulley and the shaft. Based on the results of transmission performance testing with power and planning moment of 5.8164 kW and pulley planning moment of 1573.65 kg.mm from type A, the calculation of driver pulley rotation = 3 inches (d1) and motor rotation = 3600 rpm (n1) can be used rpm of the drive pulley when it is not loaded and when working, namely the rpm of the drive pulley when it is not loaded is 1080 rpm. Furthermore, the pulley rpm when working is 9.75\ rpm\ and\ The design power of the shaft is 4.92\ for the shear stress that occurs on the shaft of 0.838 kg/mm which is smaller than the allowable shear stress with a value of 5.16 kg/mm. so that the power and moment of planning the shaft with a diameter that can be used safely.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 141-148
Open AccessRANCANG BANGUN TRANSMIS MESIN PERONTOK 3600 RPM BERBASIS MOTOR BENSIN
A rice threshing machine is the process of separating rice from its stems, so that reducing rice agricultural yields is very strategic in supporting rice production. Modification of the tool which previously used a slamming system, resulted in the yield of grain containing quite high levels of grain. The aim of this research is to design the transmission rotation to make the belt pulley and shaft more effective. The rice threshing machine transmission system consists of a pulley and belt with various belt sizes. The appearance of the pulley for calculations is adjusted to a pulley size of 10 inches = 25.4cm. Then the belt that connects the 10 inch/25.4cm pulley and the 9.74cm A58 belt is the belt that connects the pulley and the shaft. Based on the results of transmission performance testing with power and planning moment of 5.8164 kW and pulley planning moment of 1573.65 kg.mm from type A, the calculation of driver pulley rotation = 3 inches (d1) and motor rotation = 3600 rpm (n1) can be used rpm of the drive pulley when it is not loaded and when working, namely the rpm of the drive pulley when it is not loaded is 1080 rpm. Furthermore, the pulley rpm when working is 9.75\ rpm\ and\ The design power of the shaft is 4.92\ for the shear stress that occurs on the shaft of 0.838 kg/mm which is smaller than the allowable shear stress with a value of 5.16 kg/mm. so that the power and moment of planning the shaft with a diameter that can be used safely.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 447-450
RANCANG BANGUN PROTOTYPE SMART GREENHOUSE MENGGUNAKAN THINGSPEAK
The design of this smart greenhouse prototype is one of the implementations of artificial intelligence controlled by the Arduino uno microcontroller, which has actuators in the form of lights and pumps and is equipped with DHT22 sensors, Soil Moisture and Temperature Sensors. The method used in making this smart greenhouse prototype is the Prototype method. There are seven stages in the prototype method that guide the process of making robots, namely gathering requirements, building prototypes/prototypes, evaluating prototypes, programming systems, testing systems, evaluating systems, and using the system. The most important stage in making this smart greenhouse prototype is the stage where at this stage testing is carried out on the results of the design and programming of the robot that has been made to prove the robot prototype is in accordance with what is desired or not. The testing process is carried out in tandem with the assembly process and programming process. In the process of assembling and programming the robot prototype, it is done with system errors. Testing with system errors is carried out to get a robot prototype that works optimally.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 447-450
Open AccessRANCANG BANGUN PROTOTYPE SMART GREENHOUSE MENGGUNAKAN THINGSPEAK
The design of this smart greenhouse prototype is one of the implementations of artificial intelligence controlled by the Arduino uno microcontroller, which has actuators in the form of lights and pumps and is equipped with DHT22 sensors, Soil Moisture and Temperature Sensors. The method used in making this smart greenhouse prototype is the Prototype method. There are seven stages in the prototype method that guide the process of making robots, namely gathering requirements, building prototypes/prototypes, evaluating prototypes, programming systems, testing systems, evaluating systems, and using the system. The most important stage in making this smart greenhouse prototype is the stage where at this stage testing is carried out on the results of the design and programming of the robot that has been made to prove the robot prototype is in accordance with what is desired or not. The testing process is carried out in tandem with the assembly process and programming process. In the process of assembling and programming the robot prototype, it is done with system errors. Testing with system errors is carried out to get a robot prototype that works optimally.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 209-215
SIMULASI JARINGAN VPN ROUTER DENGAN METODE LINK STATE ROUTING PROTOCOL DI SMK KORPRI MAJALENGKA
At this time the progress of information technology is growing so rapidly. The internet is a product of advances in information technology that can be accessed by anyone and anywhere. The increasingly sophisticated information technology helps a lot in human life today, but not a few also have a negative impact on the individual and group levels. Therefore, it is necessary to have a data and information security system. SMK Korpri Majalengka is an education provider institution in Majalengka Regency that has not carried out a data communication security system that is not optimal, such as confidential data that can still be accessed by just anyone. The agency needs a local network that has a wide range, cannot be accessed by just anyone, but only people who have access rights are connected to the local network so that agency security can be maintained properly. To solve this problem, a Virtual Private Network (VPN) network is needed. Therefore, the author intends to answer the above problems by simulating the "VPN Router Network with the Link State Routing Protocol Method" with the aim of maintaining the data and information security system at SMK Korpri Majalengka Regency.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 209-215
Open AccessSIMULASI JARINGAN VPN ROUTER DENGAN METODE LINK STATE ROUTING PROTOCOL DI SMK KORPRI MAJALENGKA
At this time the progress of information technology is growing so rapidly. The internet is a product of advances in information technology that can be accessed by anyone and anywhere. The increasingly sophisticated information technology helps a lot in human life today, but not a few also have a negative impact on the individual and group levels. Therefore, it is necessary to have a data and information security system. SMK Korpri Majalengka is an education provider institution in Majalengka Regency that has not carried out a data communication security system that is not optimal, such as confidential data that can still be accessed by just anyone. The agency needs a local network that has a wide range, cannot be accessed by just anyone, but only people who have access rights are connected to the local network so that agency security can be maintained properly. To solve this problem, a Virtual Private Network (VPN) network is needed. Therefore, the author intends to answer the above problems by simulating the "VPN Router Network with the Link State Routing Protocol Method" with the aim of maintaining the data and information security system at SMK Korpri Majalengka Regency.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 358-362
Proses Fabrikasi Rafter-Box Pada PT Wika Kontruksi Majalengka
Dunia industri dan konstruksi baja pada saat ini telah mengalami perkembangan yang sangat pesat, dimana meningkatnya permintaan dari berbagai pihak yang menginginkan adanya kemajuan dalam infrastruktur di indonesia. pt. wijaya karya kontruksi, adalah perusahaan yang bergerak dalam bidang fabrikasi baja. yang terletak di majalengka, contoh produk yang dibuat seperti ; struktur bangunan gedung, jembatan, kilang minyak dan lainnya. pada sebuah contoh kasus pembangunan proyek stasiun halim (kcic), terdapat beberapa proyek yang dikerjakan di pt. wika industri & konstruksi majalengka, beberapa komponen dasar bangunan proyek stasiun halim (kcic) ; colomn bottom, column mind, colomn top, rafter-box, colomn twist, beam, rafter-box adalah bagian dari strucktur bangunan pada penerapan, setasiun halim atau lebih dekenal sebagai kuda-kuda. yang berfungsi untuk mendukung beban atap termasuk juga beratnya sendiri dan sekaligus dapat memberikan bentuk pada atapnya. pada proses pembuatan rafterbok diperlukan beberapa tahapan fabrikasi . cutting, fit up, weld, finishing
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 358-362
Open AccessProses Fabrikasi Rafter-Box Pada PT Wika Kontruksi Majalengka
Dunia industri dan konstruksi baja pada saat ini telah mengalami perkembangan yang sangat pesat, dimana meningkatnya permintaan dari berbagai pihak yang menginginkan adanya kemajuan dalam infrastruktur di indonesia. pt. wijaya karya kontruksi, adalah perusahaan yang bergerak dalam bidang fabrikasi baja. yang terletak di majalengka, contoh produk yang dibuat seperti ; struktur bangunan gedung, jembatan, kilang minyak dan lainnya. pada sebuah contoh kasus pembangunan proyek stasiun halim (kcic), terdapat beberapa proyek yang dikerjakan di pt. wika industri & konstruksi majalengka, beberapa komponen dasar bangunan proyek stasiun halim (kcic) ; colomn bottom, column mind, colomn top, rafter-box, colomn twist, beam, rafter-box adalah bagian dari strucktur bangunan pada penerapan, setasiun halim atau lebih dekenal sebagai kuda-kuda. yang berfungsi untuk mendukung beban atap termasuk juga beratnya sendiri dan sekaligus dapat memberikan bentuk pada atapnya. pada proses pembuatan rafterbok diperlukan beberapa tahapan fabrikasi . cutting, fit up, weld, finishing
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 291-298
ANALISA PRODUKTIVITAS KERJA WAKTU DAN BIAYA ALAT BERAT PADA PROYEK MODERNISASI IRIGASI RENTANG KAB. INDRAMAYU
The Modernization of the Rentang Irrigation Project in Indramayu Regency plays a strategic role in supporting food security and agricultural sector development. The use of heavy equipment is crucial for ensuring the smooth and efficient execution of irrigation work. This study aims to identify the heavy equipment used, the productivity of the heavy equipment, the duration of the activity cycles, and the estimated costs of operating the heavy equipment in the Rentang Irrigation Modernization Project. The research was conducted through direct field observations to collect data on the time required by each piece of heavy equipment during soil reclamation work. This data was then used to calculate the productivity of the heavy equipment. The results showed that the production capacity of the Kubota U50 Excavator is 27.79 m3/hour. The required working duration for the Excavator is 154.23 hours, with an estimated operational cost of Rp. 267,541,273. The production capacity of the Dump Truck is 5.45 m3/hour, with a required working duration of 147.73 hours and an estimated operational cost of Rp. 568,013,231. The production capacity of the Vibro Roller is 63.56 m3/hour, with a required working duration of 337.14 hours and an estimated operational cost of Rp. 112,817,843.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 291-298
Open AccessANALISA PRODUKTIVITAS KERJA WAKTU DAN BIAYA ALAT BERAT PADA PROYEK MODERNISASI IRIGASI RENTANG KAB. INDRAMAYU
The Modernization of the Rentang Irrigation Project in Indramayu Regency plays a strategic role in supporting food security and agricultural sector development. The use of heavy equipment is crucial for ensuring the smooth and efficient execution of irrigation work. This study aims to identify the heavy equipment used, the productivity of the heavy equipment, the duration of the activity cycles, and the estimated costs of operating the heavy equipment in the Rentang Irrigation Modernization Project. The research was conducted through direct field observations to collect data on the time required by each piece of heavy equipment during soil reclamation work. This data was then used to calculate the productivity of the heavy equipment. The results showed that the production capacity of the Kubota U50 Excavator is 27.79 m3/hour. The required working duration for the Excavator is 154.23 hours, with an estimated operational cost of Rp. 267,541,273. The production capacity of the Dump Truck is 5.45 m3/hour, with a required working duration of 147.73 hours and an estimated operational cost of Rp. 568,013,231. The production capacity of the Vibro Roller is 63.56 m3/hour, with a required working duration of 337.14 hours and an estimated operational cost of Rp. 112,817,843.
- Open Access
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 424-434
Metode Pelaksanaan Pekerjaan Pondasi Bore Pile Pada Proyek Penanganan Longsoran Ruas Jalan Bts. Kota Sumedang – Cijelag STA 19+198 Jawa Barat
The implementation of bore pile foundations in the Cirebon Regency – Majalengka Regency – Sumedang Regency Road Preservation Project is one of the avalanche handling work items that aims to strengthen the soil retaining wall structure from the load of the structure on it, the soil retaining wall structure was built because the existing condition had previously collapsed so a new soil retaining wall was planned. The foundation used in the construction of this soil retaining wall is a bore pile foundation. Bore pile foundation is a type of deep foundation whose installation is carried out first by drilling the ground with the diameter of the drilling hole according to the plan using a hydraulic drilling machine until it reaches a predetermined depth, then an assembled steel frame is inserted, and casting is carried out using a concrete mixture. The purpose of this study is to find out the stages of bore pile foundation work in the Avalanche Handling Project from the preparation of tools and materials to the implementation of the work. Knowing how to drill and install bore pile reinforcement. Knowing how bore pile casting works. In the implementation of bore pile work in the Avalanche Handling project of the Sumedang City Boundary Road section of STA 19 + 198, there are several stages, namely preparatory work, drilling work, rebar installation work, and casting work.
- 1 October 2024
- Published by Universitas Majalengka in SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
- Vol. 8, 424-434
Open AccessMetode Pelaksanaan Pekerjaan Pondasi Bore Pile Pada Proyek Penanganan Longsoran Ruas Jalan Bts. Kota Sumedang – Cijelag STA 19+198 Jawa Barat
The implementation of bore pile foundations in the Cirebon Regency – Majalengka Regency – Sumedang Regency Road Preservation Project is one of the avalanche handling work items that aims to strengthen the soil retaining wall structure from the load of the structure on it, the soil retaining wall structure was built because the existing condition had previously collapsed so a new soil retaining wall was planned. The foundation used in the construction of this soil retaining wall is a bore pile foundation. Bore pile foundation is a type of deep foundation whose installation is carried out first by drilling the ground with the diameter of the drilling hole according to the plan using a hydraulic drilling machine until it reaches a predetermined depth, then an assembled steel frame is inserted, and casting is carried out using a concrete mixture. The purpose of this study is to find out the stages of bore pile foundation work in the Avalanche Handling Project from the preparation of tools and materials to the implementation of the work. Knowing how to drill and install bore pile reinforcement. Knowing how bore pile casting works. In the implementation of bore pile work in the Avalanche Handling project of the Sumedang City Boundary Road section of STA 19 + 198, there are several stages, namely preparatory work, drilling work, rebar installation work, and casting work.