Journal of Architecture and Civil Engineering

Published by Quest Journals

Abbrev: J. Archit. Civ. Eng.
EISSN 2321-8193
Database Coverage
  • Scilit
Journal Articles
All-time journal articles
98
2025 journal articles
64
Subject
  • Product Engineering
  • Concrete
  • Hospitality, Leisure, Sport & Tourism
  • Facilities Management
  • Sustainability Studies
  • Risk Management & Assessment

Publications Analysis

Publications in 2016-2026
Open Access Publications in 2016-2026
Top Subjects

Publications in 2016-2026.

SubjectPublications
Product Engineering
27
Sustainability Studies
16
Risk Management & Assessment
14
Facilities Management
13
Hospitality, Leisure, Sport & Tourism
13
Concrete
11
Supply Chain & Logistics
10
Climate Change
9
Operations Management
8
Manufacturing
7

Citation analysis
Publications published in 2023-2024 and cited in 2025.
Total Citations
2
Total Publications
33
Average Citations
0.06
Cited Publications
2
Cited Publications %
6.1%
Self Citations
0
Self Citations %
0%

Metrics
h5_index
2
Monthly Citation Metric (MCM)
0.17

Monthly Citation Metric

Citations per year
All citations in 2016-2026

Citation Distribution
All citations to publications in 2023-2024.
Q1
0
Med
0
Q3
0
99%
3.7
Max
5

Citation Origins
Publications published in 2023-2024 and cited in 2025.
Citing Source Titles
Citing Publishers

Latest Publications

  • Implementation of Value Engineering in Construction Projects Based on Building Information Modeling (BIM) Case Study: Factory Construction Project in Cikarang, West Java

    by Hafizh Sulung Irfan Mudzaki, Dwi Dinariana, Fitri Suryani

    The application of Value Engineering (VE) integrated with Building Information Modeling (BIM) represents an innovative approach to improving cost efficiency and functional value in construction projects. This research aims to examine the integration of VE and BIM in a factory construction project in Cikarang, West Java, focusing on the analysis of the main steel structural element (rafter) to develop a more economical design alternative without compromising quality and functionality. The research methodology includes functional, creative, and evaluative analysis stages, along with the application of Life Cycle Cost (LCC) as a basis for decision-making. The study findings indicate that the alternative design using Castellated Beam provides significant cost efficiency. The material volume is reduced by 64,568 kg, and the initial construction cost decreases by 53.69% compared to the original design. Overall, the total project cost savings reach 3.00%. The LCC analysis further demonstrates long-term savings of 50.07% over the project’s lifecycle. Although the salvage value of the alternative design is lower, its advantages in initial and maintenance costs yield greater economic benefits. BIM technology at the 5D level proves effective in enhancing the accuracy of quantity take-offs and cost estimation, while also enabling efficient visualization of design alternatives.This study concludes that the integration of VE and BIM is an effective strategy for improving cost efficiency and design decision quality. Castellated Beam is recommended as an optimal solution for similar projects, and the implementation of VE based on BIM should be expanded to other construction elements to maximize overall project value.

  • Wayfinding and Navigation in Healthcare Infrastructure: A Case Study of AIIMS Jodhpur

    by Sobhagya Mittal, Shuvojit Sarkar, Anil Dewan

    India’s healthcare infrastructure operates through a multi-tiered framework encompassing primary, secondary, and tertiary care institutions, guided by constitutional mandates and public health policies. Despite these provisions, spatial disparities in access remain pronounced, particularly in preventive care and chronic disease management, due to regional imbalances, infrastructural limitations, and workforce shortages. These challenges intensify within large tertiary care hospitals, where complex spatial configurations and dispersed service nodes hinder intuitive navigation. Patients and visitors frequently encounter cognitive strain and emotional distress while locating essential departments such as outpatient clinics, diagnostic units, and pharmacies. In the absence of a standardized navigational model, wayfinding strategies must be contextually adapted to accommodate demographic variability, including age, literacy, health condition, and cultural orientation. The deployment of effective wayfinding systems comprising legible signage, spatial zoning, and navigational aids plays a critical role in enhancing user experience and streamlining institutional workflows. Integrating cognitive and behavioral principles into environmental design not only reduces navigational frustration but also reinforces the operational and therapeutic efficacy of healthcare spaces. Future research could investigate how spatial logic and wayfinding challenges vary across public vs. private hospitals, or urban vs. rural healthcare settings, and further examine the use of spatial analysis tools to evaluate circulation efficiency, departmental adjacencies, and visual connectivity in relation to patient movement and institutional performance.

  • A Risk Management Analysis to Planning of Oesapa Besar Bridge Replacement in Kupang City

    by Angeline Grace Allo, Nusa Sebayang, Erni Yulianti

    The construction of the Oesapa Besar Bridge Replacement in Kupang City must be conducted due to a significant decline in structural quality. The planning stage is dealing with many risks stemming from technical, financial, environmental and social factors. Therefore, this study aims to analyze the potential risks which may arise during the planning stage and evaluate the effectiveness of the proposed mitigation strategies to reduce these risks. The selected method to be applied in this study is Failure Mode and Effect Analysis (FMEA) method to identify potential failures and evaluate risks. The instrument in the form of a questionnaire with 13 risk indicators was distributed to 35 respondents. The results showed all risk variables experienced a decrease for their RPN value after the mitigation strategy was implemented. The total RPN value before mitigation was 2,394.63, has a decrease to 1,504.26 after mitigation, or equivalent to a decrease of 890.37 (37.18%). There are three main risks showed a significant decrease: (a) Innacurate cost estimation, (b) Budget innefficiency due to government policy, and (c) Inadequate water channel outlets. However, there are also several risks that remained in the high category after mitigation had been performed, such as: changes in traffic patterns, water pollution, land acquisition and negatively affected livelihoods.

  • Arbitration versus Litigation: Perceptions of Effectiveness in Resolving Construction Disputes in Indonesia

    by Arief R. Julitjahjono, Arman Jayady, Dwi Dinariana

    Dispute resolution plays an essential role in maintaining project continuity and legal certainty in the construction industry, where high-value contracts and technical complexities frequently lead to disagreements. In Indonesia, two primary mechanisms are available for resolving such disputes: litigation and arbitration. While arbitration is increasingly favored for its procedural flexibility and perceived neutrality, its actual effectiveness in the construction context—compared to litigation—remains underexplored in empirical research. This study aims to evaluate the effectiveness of arbitration as a dispute resolution method in Indonesia’s construction sector, particularly in comparison to litigation. It also seeks to identify the underlying factors that influence arbitration’s effectiveness and to examine the key challenges that hinder its optimal implementation. The research employs a mixed-methods approach, combining quantitative analysis of validated arbitration effectiveness indicators with qualitative insights from open-ended expert responses. Data were collected through structured questionnaires distributed to selected professionals in the construction industry, including lawyers, engineers, and contract administrators, who have experience both as claimants in arbitration proceedings and as observers or participants in court-based dispute resolution. These respondents are considered representative of stakeholders capable of assessing arbitration and litigation with informed judgment. The results indicate that arbitration is generally perceived as more effective than litigation, especially in terms of decision objectivity, procedural flexibility, and international enforceability. However, significant challenges remain, such as high arbitration costs, lengthy resolution times in complex cases, and limited public trust in arbitrator impartiality. These findings underscore the need for institutional improvements to enhance arbitration’s credibility and accessibility in Indonesia’s construction industry.

  • Addressing Wayfinding Challenges in Nigerian Shopping Malls: An Integrated Review of Spatial Legibility, Signage, Culture, And Digital Tools

    by Onwuka Nathaniel Chuckuemeka, Emokpae Murphy Erebor, Ruth R. Martins

    In contemporary Nigerian cities, shopping malls have evolved beyond commercial enclaves into complex social spaces, reflecting urban aspirations and cultural interactions. However, navigating these environments remains a persistent challenge for many users, often resulting in cognitive strain, frustration, and reduced satisfaction. This review critically examines wayfinding within Nigerian malls, drawing on environmental psychology, design theory, and empirical evidence to explore the role of signage, architectural legibility, cultural expectations, and emerging digital tools. Relying primarily on qualitative studies, observational data, and recent scholarly discourse, the study identifies key barriers such as inconsistent signage, inadequate visual landmarks, and limited use of adaptive technologies. Findings reveal that while users often compensate through interpersonal strategies, such as asking for directions, these do not replace the need for robust, culturally attuned wayfinding systems. Recommendations emphasize integrating layered strategiescombining intuitive architectural design, clear signage systems, and inclusive technological aidsto support seamless navigation and enhance user experience. Ultimately, the study advocates for treating wayfinding as a central design concern, rather than an afterthought, in Nigerian mall development.

  • Risk Management Analysis to Construction Project of Liliba Bridge Duplication in Kupang City

    by Reyckhard Cristian Pellokila, Nusa Sebayang, Erni Yulianti

    Kupang City is a municipality and capital city of East Nusa Tenggara Province, that currently has a rapid population growth, increasing activities and higher number of travels, therefore, it is necessary to improve road facilities and its infrastructure. The implementation of Liliba Bridge Duplication work uses APBN funding source through the Regional Road of Presidential Instruction (Impres) program with a work contract value of Rp. 72.413.655.000, -. The construction work of Liliba Bridge Duplication is unavoidable will cause many risks along its implementation, especially this construction will take place on an active route in the city center crossing with very dense traffic and large use of heavy equipment and sophisticated machinery. The selected method that will be used in data management and initial data exploration of this study was the Work Breakdown Structure which divided into two methods of ISO 31000 and House of Risk (HOR) to identifity, assess, mapping, classifying and mitigating the risks. Based on the identification results, there were 134 risks identified and can occur during the Liliba Bridge Duplication project. Verification using the first questionnaire distributed to 30 respondents revealed 84 relevant risks and further action (the analysis) succeeded to identify 11 risk agents at the highest level. From the 11 risk agents, their ARP value were calculated using House of Risk (HOR) Stage 1, resulting in 6 dominant risk agents with the highest values: (1) A10 with ARP value of 279, (2) A11 with ARP value of 252, (3) A8 with ARP value of 225, (4) A9 with ARP value of 144, (5) A6 with ARP value of 130, and (6) A7 with ARP value of 120. Three main mitigation strategies for risk mitigation were found, such as wearing appropriate personal protective equipment (PPE) such as gloves, safety shoes, safety helmets or safety googles and safety belts (PA1), held training related to Occupational Safety and Health (OSH) (PA2), and ensuring cafeful material procurement planning (including listing of type, quantity, and time of delivery), tracking material deliveries to guarantee timely arrival and preparing a sufficiently large and organized material storage area (PA3).

  • Application of Lean Construction in The Structural Work of the Arumaya Office Building Project

    by Benov Rensa Tri Putra, Fitri Suryani, Krishna S. Pribadi

    This study aims to evaluate the implementation of lean construction, identify the causes of waste, and analyze its impact on time performance in the structural work of the Arumaya Office Building project in Jakarta. Lean construction focuses on reducing waste and increasing added value in the construction process. However, the project faced several challenges, such as design revisions, limited storage space, and technical obstacles that contributed to waste.The method used is exploratory with a quantitative approach. Data were collected through interviews and questionnaires, then analyzed descriptively to identify the most dominant waste factors. The results show that lean construction has been implemented, although improvements are still needed. The most frequent type of waste is defects caused by a lack of coordination. The greatest impact on project delays comes from damaged materials due to poor maintenance. These findings provide a strategic foundation for improving the implementation of lean construction in future projects

  • Value Engineering in The Selection of Fire Proof Facade Materials for The Transjakarta Bus Stop Building at Roundabout Hi Jakarta

    by Umbu Berthanly Divar

    The façade system is a critical element of bus stop structures, serving not only as an aesthetic feature and weather barrier but also as a key component in ensuring fire safety. However, many façade materials used in public facilities still fail to meet fire resistance standards, with some even employing flammable components. In practice, material selection often prioritizes low initial costs over long-term safety and maintenance considerations, increasing the risk of fire hazards and future expenses. This study applies the Value Engineering (VE) approach to optimize the selection of fire-resistant façade materials, balancing cost efficiency, technical performance, and safety. A case study was conducted at the strategically located Bundaran HI TransJakarta Bus Stop, which experiences high passenger traffic and demands a high level of safety. The analysis compared the original façade material—Façade Seven® ACP PE—with two alternatives: Alucobond® A2 (Alternative 1) and Seven® ACP FR (Alternative 2). Life Cycle Cost Analysis (LCCA) results show total costs of Rp 5,839,108,944 for the original material, Rp 6,409,735,117 for Alternative 1, and Rp 5,563,289,858 for Alternative 2. The use of Seven® ACP FR yields a 5% cost saving for façade works compared to the original material and reduces total project costs by 0.70%, making it the most economical option. Risk analysis further confirms the superiority of Seven® ACP FR, with LCCA costs reduced from Rp 7,471,223,369.42 to Rp 5,897,558,846.65 after risk mitigation—reflecting a 21.06% saving. These findings highlight the potential of VE to deliver safer, more cost-effective, and sustainable material solutions for public transportation infrastructure.

  • Risk Management on Schedule Performance in the Construction of Baros–Petir Provincial Road, Banten Province, Indonesia

    by Tresnoviati Ros Peggy, Fitri Suryani, Dwi Dinariana

    Construction projects, especially road infrastructures, are inherently prone to risks that can delay schedules and increase costs. This study analyzes dominant risks affecting schedule performance in the Baros–Petir road reconstruction project and develops effective risk response strategies. Using a mixed-methods approach— quantitative risk assessment with Probability Impact Matrix (PIM) and qualitative expert judgment from 3 key stakeholders and 30 project practitioners—this research identifies key risk factors, notably change orders and volume discrepancies between contract and actual field conditions, as critical threats to schedule adherence. Proposed mitigation includes dynamic rescheduling, rigorous monitoring, and contractual clauses for risk transfer. The results serve as a reference to improve risk handling frameworks in road construction projects for better time and cost control.

  • The Effect of Operational Delay Risk to investment Decision Making on Construction of Semarang – Demak Toll Road Project - Indonesia

    by Faris Haqqul Anwar, Sutanto Hidayat, Erni Yulianti

    Roads play as a key element in a transportation infrastructure with major role in improving connectivity between regions, driving the economic growth and improving public welfare. Unfortunately, the Semarang-Demak National Road, as a part of Pantura (North Coast) road network frequently experiences severe congestions, tidal flooding and land subsidence as the constraints that able to delay the smoothness flow of goods and services in these areas. To address these issues and improve capacity and quality of transportation services, the government is planning to build the Semarang-Demak Toll Road, integrated with a sea wall. This national strategic project is expected to improve the connectivity along regional areas, shorten the travel times, reduce logistic costs and protect protect coastal areas from tidal flooding threat. The method used in this study was a mixed method where it is a combination between quantitative and qualitative methods aided by sensitivity analysis and SWOT analysis. Result of study on the effect of Delay on NPV and IRR values: from sensitivity analysis, showed that operational delay have a significant negative impact on the financial feasibility of the project. As the delay time increases, NPV and IRR values decrease. Further, in the scenario of delay of more than 10 years (more than 2030), the investment becomes detrimental since the present value of the cash inflow is less than the initial investment. Meanwhile the effective mitigation strategies proposed in this study are: based on the SWOT analysis, there are several effective mitigation strategies to reduce the impact of operational delays such as strengthening cooperation with local government, using appropriate construction technology, and implementing proactive risk management and effective stakeholder management.