Project Management and Scientific Journal

Published by African Journals Online (AJOL)

Abbrev: Proj. Manag. Sci. J.
EISSN 2590-9681
Database Coverage
  • Scilit
Journal Articles
All-time journal articles
30
2025 journal articles
19
Subject
  • Management Sciences
  • Product Engineering
  • Supply Chain & Logistics

Publications Analysis

Publications in 2016-2026
Open Access Publications in 2016-2026
Top Subjects

Publications in 2016-2026.

SubjectPublications
Management Sciences
19
Product Engineering
11
Supply Chain & Logistics
7
Sustainability Studies
4
Economics
4
Political Science & International Relations
2
Education & Pedagogy
2
Risk Management & Assessment
2
AI & Machine Learning
1
Communication Studies
1

Top Countries

Publications in 2016-2026.

CountryPublications
Ghana
18
Tanzania
4
Zambia
1
Nicaragua
1

Citation analysis
Publications published in 2023-2024 and cited in 2025.
Total Citations
30
Total Publications
7
Average Citations
4.29
Cited Publications
7
Cited Publications %
100%
Self Citations
3
Self Citations %
10%

Metrics
h5_index
5
Monthly Citation Metric (MCM)
0.31

Monthly Citation Metric

Citations per year
All citations in 2016-2026

Citation Distribution
All citations to publications in 2023-2024.
Q1
2.5
Med
3
Q3
8
99%
8
Max
8

Citation Origins
Publications published in 2023-2024 and cited in 2025.
Citing Source Titles
Citing Publishers

Latest Publications

  • Open Access

    Monitoring and Evaluation Practices and Performance of Selected Building Construction Companies in Kiambu County, Kenya

    by Samuel Nduati Ndung’U, Robert Ombati, Annstellah Gakii

    This study examined the impact of project planning, a key monitoring and evaluation (M&E) practice, on the performance of 168 NCA-registered building construction firms in Kiambu County, Kenya. Applying Systems Theory and a descriptive research design, the study utilized multiple linear regression to analyze data from 251 participants. The results identified a significant positive correlation (P = .803, p < 0.001) between project planning and overall performance, noting that while planning often aligns with high-level goals, firms frequently struggle to develop specific M&E frameworks. Projects that maintained clear objectives and consistent reviews demonstrated superior cost efficiency and timeliness. Ultimately, the study concludes that systematic planning is essential for success and recommends that firms institutionalize risk assessments and periodic reviews, while advocating for standardized government guidelines to mitigate budget overruns and construction delays.

  • Open Access

    Assessing the Impact of Project Risk Management Practices on the Performance of Offshore Petroleum Engineering Projects in Ghana

    by David Ackah, Joseph Sekyi-Ansah

    Offshore petroleum engineering projects are characterised by high technical complexity, capital intensity, environmental sensitivity, and operational uncertainty. In Ghana, the rapid expansion of offshore petroleum activities has heightened the importance of effective project risk management practices to ensure successful project delivery. This study assessed the impact of project risk management practices on the performance of offshore petroleum engineering projects in Ghana. The study specifically examined the influence of risk identification, risk analysis, risk response planning, risk monitoring, and risk communication on project performance indicators, including cost, time, quality, safety, and environmental compliance. A quantitative research design with a cross-sectional survey approach was adopted. Data were collected from 152 professionals involved in offshore petroleum engineering projects in Ghana using structured questionnaires. The data were analysed using descriptive statistics, Pearson correlation analysis, and multiple regression analysis. The findings revealed that project risk management practices are implemented at moderate to high levels in offshore petroleum projects in Ghana. Correlation results showed a positive and significant relationship between all risk management practices and project performance. Regression analysis indicated that risk management practices explain 61% of the variation in project performance, with risk response planning emerging as the most significant predictor. The study concludes that effective project risk management practices significantly enhance the performance of offshore petroleum engineering projects in Ghana. The study recommends strengthening risk response planning, improving risk identification and analysis techniques, enhancing risk monitoring systems, and improving communication frameworks within offshore project environments. The findings contribute to both theory and practice by providing empirical evidence on the role of risk management in improving outcomes for offshore petroleum projects in developing-country contexts.

  • Open Access

    The Effect of Strategic Procurement Management on Cost Overruns and Schedule Delays in Petroleum Engineering Projects in Ghana

    by David Ackah, Joseph Sekyi-Ansah

    Petroleum engineering projects are highly capital-intensive and complex undertakings that frequently experience cost overruns and schedule delays, particularly in developing economies such as Ghana. This study examined the effect of strategic procurement management on cost overruns and schedule delays in petroleum engineering projects in Ghana. The study was guided by the need to understand how procurement-related practices influence project performance outcomes in the oil and gas sector. A quantitative explanatory research design was adopted, using a cross-sectional survey approach. Primary data were collected from 142 professionals involved in petroleum engineering projects, including procurement managers, engineers, contract administrators, and supply chain specialists. Data were analysed using descriptive statistics, Pearson correlation, and multiple regression analysis. The findings revealed that strategic procurement management practices in Ghana’s petroleum engineering projects are implemented to a moderate extent. Cost overruns and schedule delays were prevalent across projects. The results further indicated a strong negative relationship between strategic procurement management and cost overruns (r = -0.62, p < 0.01) and between strategic procurement management and schedule delays (r = -0.68, p < 0.01). Regression analysis showed that strategic procurement management explains 41% of the variation in cost overruns and 50% of the variation in schedule delays. The study concluded that effective procurement management significantly reduces both cost overruns and schedule delays, with a stronger effect on schedule performance. The study recommends strengthening procurement planning, improving supplier relationship management, enhancing contract administration systems, and adopting digital procurement technologies to improve project delivery outcomes in Ghana’s petroleum sector.

  • Open Access

    Critical Success Factors for Lean Project Management Implementation in Ghana’s Upstream Petroleum Industry

    by David Ackah

    This study examined the critical success factors influencing the implementation of Lean Project Management (LPM) in Ghana’s upstream petroleum industry. The upstream petroleum sector is characterised by high capital investment, operational complexity, and significant project risks, making efficient project management approaches essential for improved performance. Despite the growing relevance of lean principles in enhancing project efficiency, empirical research on the factors driving successful Lean Project Management implementation in Ghana’s petroleum industry remains limited. The study adopted a quantitative research approach using a descriptive survey design. Primary data were collected using structured questionnaires administered to 112 professionals, including project managers, engineers, and technical staff, within selected upstream petroleum organisations in Ghana. The data were analysed using descriptive statistics, correlation analysis, and multiple regression analysis with SPSS software. The study examined five key critical success factors: top management commitment, organisational culture, employee involvement and training, communication systems, and continuous improvement practices. The findings revealed that all identified factors significantly influence the implementation of Lean Project Management. However, communication systems and top management commitment emerged as the strongest predictors of successful implementation. The results further indicated that continuous improvement practices and organisational culture play vital supporting roles, while employee training remains an area requiring further enhancement within the sector. The study concludes that the successful implementation of Lean Project Management in Ghana’s upstream petroleum industry depends on a combination of leadership, organisational, and operational factors. It recommends that petroleum organisations strengthen leadership commitment, improve communication systems, invest in employee training, and institutionalise continuous improvement practices to enhance project performance and operational efficiency. The study contributes to existing knowledge by providing empirical evidence on the implementation of Lean Project Management in the context of a developing country petroleum sector, where research is limited.

  • Open Access

    Applications, Challenges, Methodological Advancements and Insights of Structural Equation Modelling: A Meta-Analysis

    by Muya Mgaza Somo

    Structural Equation Modelling (SEM) has proven to be a crucial tool for researchers analyzing complex networks of relationships among latent constructs. This cutting-edge review of SEM applications, enduring methodological issues and advances and findings is accomplished via a meta-analysis of 75 peer-reviewed articles (2015-2025). The review identifies SEM is being applied mainly for theory testing, scale validation and mediation/moderation analysis, thus solidifying its place across disciplines ranging from engineering management to psychology. But its potency is all too frequently neutralized by recurring methodological fallacies, like specification errors in model specification, sample size deficiency, neglect of measurement invariance, uncritical reliance on fit indices and misuse of non-normal and missing data. Above all, the analysis highlights that these issues primarily occur not due to statistical complexity but due to insufficient methodological discipline and theoretical acumen. The review also highlights significant advancements like Bayesian SEM, Partial Least Squares SEM, machine learning integration and improved reporting standards that are strengthening and making the technique more flexible by building a brighter future for the method. This integration concludes that the optimal application of SEM requires effective compliance with good theory, well-thought-through research design and open practices.

  • Open Access

    Examining the Consequences of Inadequate Performance on Quality Control in TARURA Roads Construction Projects

    by M. Lukanazya Dickson, S. Tekka Ramadhani, J. Shengeza Japhari

    The Tanzania Development Vision (TDV) 2025 has recognized and multifaceted a profound and an integrated infrastructure network as a main driver for the economic development, with roads occupying over 75% of goods and 90% of passengers. The Tanzania Rural and Urban Roads Agency (TARURA) is among the government institutions pivotal in realizing this vision by constructing and maintaining roads to enhance a circulatory system and economic growth. An Efficient road networks has been identified to lessen the transportation costs and time, and thus enhancing the cheaper and more competitive products, both domestically and internationally. However, the achievement of the construction projects is essentially dependent on effective Quality Control (QC), an area where a substantial deficiency has been acknowledged. This study examines the consequences of inadequate QC performance in TARURA road construction projects. A quantitative research approach was employed, employing a structured questionnaire disseminated to 159 experienced professionals in Mwanza region. Data were analysed using the descriptive and inferential statistics techniques, comprising the Relative Importance Index (RII) to rank critical factors. The findings identified eight critical factors leading to inadequate QC, with inadequate planning and QC initiatives (RII=0.773), insufficient financial and human resources (RII=0.751), and the limited capacity of local contractors (RII=0.742) being the most significant. Further, the study develops a logical model representing that inadequate QC triggers a cascading effect: primary technical consequences (including poor materials, incorrect techniques) leading to secondary consequences (including cost overruns, safety hazards, legal disputes). The two has culminated in tertiary strategic consequences, comprising project failure, eroded public trust, and a long-term drain on national resources. The study findings conclude that imposing rigorous QC is not only a technical necessity but a fundamental prerequisite for TARURA's fiscal obligation, public safety, and the achievement of its national.

  • Open Access

    Evaluating AI’s Impact on Supply Chain Resilience and Disruption Recovery: The Case of Ghana Ports and Harbours Authority, Takoradi

    by Robert Tay

    The increasing frequency of global supply chain disruptions, driven by geopolitical tensions, pandemics, and climate-related shocks, has heightened the need for resilient and adaptive logistics systems. Artificial Intelligence (AI) is emerging as a transformative tool for enhancing supply chain resilience and recovery capabilities. This study evaluates the impact of AI on supply chain resilience and disruption recovery within the Ghana Ports and Harbours Authority (GPHA), Takoradi. Specifically, it examines how AI-driven technologies—such as predictive analytics, real-time monitoring, automation, and decision-support systems—contribute to mitigating risks, improving operational efficiency, and accelerating recovery from disruptions. Using a mixed-methods approach, data will be collected through structured questionnaires, interviews with key port officials, and analysis of operational records. The study seeks to establish the extent to which AI adoption enhances the port’s ability to anticipate disruptions, optimize resource allocation, and maintain continuity of port services. Findings are expected to provide empirical insights into the role of AI in strengthening supply chain resilience in emerging economies, offering policy and managerial implications for GPHA and similar port authorities in Sub-Saharan Africa. Ultimately, the research contributes to the growing body of knowledge on digital transformation in supply chain management and its strategic role in ensuring sustainable port operations

  • Open Access

    Assessing how local regulatory frameworks and economic incentives, along with firm characteristics, staff training, and cultural factors, influence waste management practices among SMEs in the Volta and Oti regions.

    by Stephen Kwesi Afeamenyo, Engr. Michael K. Tsorgali, Paul Kwabla Afatsawu

    This study investigates the impact of local regulatory frameworks, economic incentives, firm characteristics, staff training, and cultural factors on waste management practices among small and medium-sized enterprises (SMEs) in Ghana’s Volta and Oti regions. Using a quantitative research design, data were collected from 219 respondents through structured surveys and analysed using descriptive statistics, MANOVA, and regression analysis. Findings reveal significant regional disparities, with SMEs in the Volta Region outperforming those in the Oti Region in key areas, such as waste segregation, employee training, and digital tool adoption. Waste minimisation strategies, particularly prefabrication (β = 0.494), digital tools (β = 0.424), and material reuse (β = 0.212), were strongly correlated with perceived effectiveness. Regulatory frameworks (β = 0.255) and economic incentives (β = 0.150) significantly enhanced waste management, though firm characteristics (β = 0.269) emerged as the strongest predictor. Challenges included high costs, limited recycling infrastructure, and skill gaps. The study recommends strengthening regulatory enforcement, providing targeted financial incentives, investing in employee training, and promoting the adoption of technology to improve waste management practices. These measures can support sustainable construction practices, reduce environmental impact, and align with Ghana’s broader sustainability goals. The findings contribute to the discourse on waste management in resource-constrained settings, offering actionable insights for policymakers and industry stakeholders.


  • Open Access

    Sustainable Public Procurement as Organisational Transformation

    by Ackah David, Dadzie Boafo Eric

    This study explores the role of Sustainable Public Procurement (SPP) as a driver of organisational transformation within public sector institutions. While SPP is traditionally viewed as a tool for achieving environmental and social policy objectives, this research positions it as a strategic mechanism that reshapes institutional processes, cultures, and priorities. Adopting a qualitative research design grounded in interpretivism, the study draws on semi-structured interviews with procurement officers, sustainability managers, and senior executives across selected public organisations. Thematic analysis of the data reveals three core findings: (1) practical implementation of SPP is strongly linked to strategic alignment with national policy and top management support; (2) capacity gaps among procurement professionals and limited supplier readiness hinder transformation efforts; and (3) SPP fosters a cultural shift from cost-based decision-making to value-based procurement practices. The study concludes that SPP, when embedded adequately within institutional frameworks and supported by continuous capacity-building, can serve as a powerful lever for organisational transformation. These findings offer important implications for policymakers, procurement leaders, and public sector reform advocates aiming to enhance sustainability while modernising public institutions.


  • Open Access

    Evaluation of Key Performance Factors of Public Building Construction Projects under the Force Account Method

    by Faraja M. Magania, Ramadhani Said Tekka, Duwa Hamisi Chengula

    This study aimed to evaluate key performance factors influencing the effective implementation of public building construction projects using the Force Account Method (FAM) in Tanzania. A case study and descriptive survey design were employed to investigate projects implemented under the Ministry of Education, Science and Technology (MoEST). The target population included 128 stakeholders comprising engineers, consultants, contractors, local fundi, project coordinators, and regulatory officers, selected using stratified and purposive sampling. Data were collected through semi-structured questionnaires and document reviews, with quantitative analysis conducted using SPSS and Smart PLS, and thematic analysis for qualitative responses. Instrument validity was ensured through triangulation and pilot testing, while reliability was confirmed by Cronbach’s Alpha values ranging from 0.83 to 0.973. Ethical considerations included informed consent, anonymity, and data integrity. Findings revealed that six interdependent factors which are; effective planning, effective design, procurement management, construction supervision, adequacy and competence of project participants, and effective leadership and government support are the critical factors for FAM success. Structural model results confirmed strong positive relationships among these factors, with institutional support significantly influencing all other components. The study concludes that FAM can be a cost-effective and efficient method when managed through an integrated, systemic approach. Key recommendations include revising FAM guidelines to reflect modern practices, implementing certified training programs, adopting digital tools for project management, and developing a unified implementation framework aligned with the construction lifecycle. These findings offer practical and policy-level insights for improving public construction delivery in Tanzania.