Types
Company, Funder
Locations
Muscat, Oman

Latest Publications

  • Digital Integration and Rule-Based Optimization of Workover Hoist Scheduling in a Mature Oil Cluster: A Field Case Study from the Nimr Cluster, Oman

    by A. Alzadjali, A. Al Ajmi, H. Al Noumani, Y. Riyami, N. Siyabi, M. Al I'SAee, H. Al Yaqoubi, G. Al Shukaili, M. Al Rawahi, I. Al Lawati, et al.

    Challenge: The Nimr Cluster in southern Oman comprises 23 mature fields, more than 3,000 drilled wells and over 1,200 well interventions per year across all job types. Hoist planning previously required planners to extract and reconcile intervention proposals, production deferment, integrity dates and work-order status from five enterprise systems into spreadsheets, consuming approximately two hours per planner per day and producing prioritization that depended on individual judgment. Average restoration cycle time (RCT), the elapsed time from identifying an intervention need to returning the well to production, was 19.4 days in the five months before implementation. Methodology: The Hoist Sequence Optimizer (HSO) entered full production use in July 2025. It integrates enterprise records through a daily-refreshed data pipeline and generates hoist schedules with a transparent, deterministic rule-based method: regional priority categories defined by integrity action code and deferment or gain thresholds, objective-specific greedy construction heuristics, hoist-eligibility and free-interval constraints, and an integrity-deadline repair step with a 15-day planning margin. Planners review, adjust and freeze assignments before execution. HSO does not use machine learning or other artificial-intelligence models. Performance was evaluated by a before-and-after comparison of planning effort and monthly RCT (February–June 2025 versus August 2025–February 2026), with statistical testing and an economic valuation of the RCT change. Results: Recorded planning effort fell by approximately 90%. Mean monthly RCT fell from 19.4 to 15.5 days, a reduction of 3.95 days (20.3%; Welch t-test p = 0.027; 95% confidence interval 0.5–7.4 days), and averaged 14.1 days over October 2025–February 2026. For approximately 32 hoist restoration jobs per month at the field-average rate of 50 bbl/d per well, the 3.95-day reduction brings forward about 6,300 bbl (1,000 m³) of oil per month, equivalent to approximately US$0.5 million of gross revenue per month (about US$6 million per year) at US$80/bbl. A sensitivity analysis bounds this estimate. Novelty: The paper discloses the complete decision logic of an operating, planner-in-the-loop hoist scheduler, namely its input variables, priority categories, ranking criteria, constraints and integrity-repair rule, and links that logic to field-measured RCT and economic outcomes in a large mature onshore cluster. Published workover-scheduling methods are mostly evaluated on computational instances; this study contributes post-implementation field evidence for an explainable rule-based approach that planners can audit and adopt.

  • Innovative Approach to Water Management: Converting a Well Testing-Unit Into a Semi-Permanent Process Facility for Water Diversion

    by A. Tariq, H. Halim, A. Tarasov, R. O. Panferov, M. Mahmood, H. Al Salti, Mohammed Nasser Al Aufi

    As gas fields mature, produced water volumes tend to increase and can eventually become a significant constraint on processing capacity. As a result, an increasing share of facility capacity is dedicated to water handling rather than hydrocarbon processing, reducing operational flexibility and limiting opportunities for production growth. While facility expansion can alleviate this bottleneck, conventional brownfield developments often require lengthy execution schedules that may not align with immediate production objectives. To address this challenge, Shell Development Oman (SDO) utilized the SLB Production Express (PX) concept, a modular upstream dewatering facility designed to separate and remove free water from multiphase production streams before they reach central processing facilities. By relocating the dewatering function closer to the source, the solution reduces the hydraulic and water-processing burden on downstream facilities, thereby releasing capacity for additional gas and condensate production while preserving the hydrocarbon flow path. The process combines high-pressure three-phase separation for efficient bulk-water removal and hydrocarbon recovery with a secondary low-pressure, high-residence-time conditioning stage to achieve disposal-water quality requirements (drained water is disposed to local water evaporation pond). Recovered gas and condensate are recombined and returned to the production network, minimizing hydrocarbon losses while maintaining production continuity. The facility was engineered as a semi-permanent production asset, requiring comprehensive process simulation, separator-efficiency assessment, pressure-drop optimization, safety-system integration, piping integrity verification, and compliance with Shell DEM1 and DEM2 technical assurance frameworks. The successful deployment of the PX facility demonstrated how modular dewatering technologies can provide a practical alternative to conventional debottlenecking projects. The approach establishes a scalable framework for managing produced-water constraints and accelerating production value realization across mature hydrocarbon assets.

  • Advanced Tank Maintenance Technologies in Oil and Gas – Upstream: Robotic De-Sludging, Robotic Coating Removal, Dehumidification, and Drone-Based Inspection for Storage Tank Maintenance

    by A. Al Jahwari, M. Al Hakmani, H. Al Ghafri, Z. S. Al Habsi

    Extended tank outages remain a persistent constraint on upstream field economics, since a drained storage tank that cannot be returned to service quickly translates directly into lost or deferred production. This paper evaluates four maintenance technologies that Petroleum Development Oman PDO introduced to shorten outage windows and reduce confined-space risk during tank cleaning, surface preparation, coating, and inspection: a remotely piloted hydraulic dozer for bottom-sludge removal, a magnetically mounted climbing robot for coating and Glass-Reinforced Epoxy (GRE) stripping, a controlled-humidity dehumidification system for coating cure, and a Drone visual internal inspection. Performance was benchmarked against the manual methods each technology replaced, using data gathered from pilot deployments on tanks of differing construction, among them floating-roof-crude tanks, double-wall dehydration tanks, and single-wall storage tanks. Through the trials, cleaning cycles shortened by half, coating-removal timelines compressed by 40 to 75 percent, and the number of workers entering the tank fell by 70 to 90 percent depending on the task. The dehumidification system removed weather and time- of-day as constraints on coating work, sustaining round-the-clock application, while the Drone visual internal inspection of tanks did away with internal scaffolding altogether, cutting six weeks from inspection schedules and around USD 100,000 in access costs per tank. Taken together, the four technologies avoided several million dollars in combined deferment and direct spending on the tanks studied, without any sacrifice in the quality of the resulting work. The paper sets out the operating principles and deployment procedure for each technology, reports the field results, and closes with a discussion of what operators should plan for, including the residual manual work that even a heavily automated campaign still requires, before scaling these methods across a wider tank fleet.

  • Real-Time Digital Twin Model for Optimizing Drilling Performance and Support Intelligent Decision Making

    by Abdullah Al Mamari

    Maintaining efficient and sustainable drilling performance is a key challenge in well delivery, particularly in deciding whether drilling dysfunctions can be corrected through parameter optimization or require pull-out-of-hole (POOH) and run-in-hole (RIH) operations. This paper presents a real-time digital twin model using Mechanical Specific Energy (MSE) analytics to optimize drilling performance, reduce non-productive time (NPT), and improve well delivery efficiency across multiple fields in Oman. A real-time digital twin workflow — a continuously updated virtual model of the drilling process that stays synchronized with live rig data and closes the loop with an operational recommendation, as distinct from a static or periodically refreshed decision-support review — was developed to continuously monitor drilling performance using live rig sensor data integrated with MSE analysis. The model processes key parameters — weight on bit, rotary speed, torque, rate of penetration, flow rate, standpipe pressure, and drilling fluid properties — to build a continuous picture of downhole conditions. MSE is dynamically benchmarked against offset-well performance to evaluate efficiency. Combined physics-based and rule-based logic classifies drilling states as stable drilling, optimization required, or critical failure requiring POOH and RIH, while generating real-time operational recommendations and supporting integration with rig surveillance systems. The model was validated using data from more than 500 wells across 15 fields in Oman, achieving 99.1% accuracy — measured as agreement between the model's recommended action and the independently recorded operational outcome of each bit run — in identifying inefficient drilling conditions and recommending the appropriate corrective action. Field implementation demonstrated improved decision consistency and operational efficiency in real drilling environments. In Well A case study, the reservoir section was drilled in three bit runs compared with eight in an offset well, significantly reducing drilling time and tripping frequency. The system effectively differentiated between conditions requiring parameter optimization and those requiring BHA replacement, enabling timely interventions and avoiding unnecessary POOH operations. Overall, the approach reduced drilling time by up to 17% and well cost by approximately 6%. In addition, fewer tripping operations and more efficient drilling contributed to lower rig energy consumption, improved operational performance, and better well delivery outcomes across multiple field applications. This work introduces a digital twin-based drilling decision framework that extends conventional MSE analysis into real-time operational intelligence. Its novelty lies in integrating MSE with structured decision logic to classify drilling states and enable proactive interventions, supporting more autonomous, efficient, and lower-carbon drilling operations in complex field environments.

  • Optimizing Fire & Gas Detector Placement Through In-House Engineering: A Kaizen-Driven Approach to Cost Efficiency and Safety

    by T. B. Taloot Albusaidi

    Fire and Gas (F&G) mapping is a critical engineering activity used to determine the optimum location of fire and gas detectors in oil and gas facilities to ensure effective detection of hazardous events while meeting process safety requirements. The mapping process considers the potential release scenarios, hazardous area characteristics, equipment layout, congestion, ventilation conditions, detector technology, and the required detection coverage within the identified risk areas. Effective F&G mapping is not limited to placing detectors based on predefined spacing or equipment locations. It requires a systematic assessment of credible fire and gas scenarios, and an evaluation of how a hazardous event could develop and propagate within the facility. For flammable and toxic gas detection, factors such as gas dispersion behavior, prevailing wind conditions, ventilation, release elevation, physical obstructions, and detector line-of-sight limitations can significantly influence the final detector locations. Similarly, fire and smoke detector placement requires consideration of the fire scenario, detector field of view, obstruction by structures or equipment, and the ability of the selected detector technology to identify the hazardous event within the required area. The objective of the mapping exercise is therefore to achieve the required detection coverage and performance without unnecessary duplication of detectors. This requires a balance between maximizing coverage and avoiding excessive detector installation, particularly in congested facilities where multiple detectors may provide overlapping coverage without providing a significant improvement in the overall safety performance. A properly optimized F&G mapping study should demonstrate that the required coverage criteria are achieved for the identified hazardous areas while considering detector availability, voting philosophy, and potential common cause failures. Traditionally, F&G mapping studies have been performed by specialized third-party consultants, often resulting in conservative detector layouts with limited opportunity for optimization. This paper presents an in-house engineering methodology developed to optimize detector placement through a structured Kaizen initiative while maintaining the required safety performance. The methodology applies a detailed review of the original mapping assumptions, detector coverage, overlapping detection areas, and facility-specific conditions to identify optimization opportunities without compromising the intended protection philosophy. The methodology combines engineering experience, F&G mapping software and standardized engineering practices to challenge previous detector placement strategies by third parties. Rather than relying solely on conservative design practices, detector placement was optimized by evaluating credible release scenarios, equipment criticality, process conditions, detector coverage and voting philosophy. A hybrid selection of 1ooN and 2ooN detection coverage philosophies was adopted where appropriate to achieve the required protection without overdesign. As a result, the methodology reduced the total number of detectors from 19 to 12. This represents a 37% reduction while maintaining the required detection coverage. Internal execution reduced the duration of F&G mapping studies from 6-8 weeks to approximately 2-3 weeks and eliminated external consultancy costs. Additional savings were achieved through reduced procurement processes, construction activities, pre-commissioning, commissioning and future maintenance activities.

  • From Optimism Bias to Decision Excellence: Transforming Workforce Capability to Deliver Faster, Better, and Repeatable Oil & Gas Project Decisions

    by D. Reddy, L. Dcosta, Y. AlHosni

    The energy industry is operating in an increasingly challenging environment, where organizations are expected to deliver projects more quickly while maximizing capital efficiency and shareholder value. In this environment, the quality of investment decisions has become a key differentiator. Decisions made during the front-end development phase largely determine project outcomes, therefore the ability to objectively assess uncertainty and communicate risk transparently is an essential organizational capability. Within Petroleum Development Oman (PDO), Post Implementation Reviews (PIRs) of projects delivered over the past five years revealed some key insights, on why some projects couldn't not achieve the promised forecast/value. A systematic analysis identified three common contributors to these variances: optimism bias, systematic underestimation of uncertainty, and team behaviours that influenced the interpretation and communication of technical information. Together, these factors contributed to overly optimistic project forecasts, unrealistic commitments, and reduced predictability at critical investment decision gates. The findings indicated that improving project outcomes required more than robust technical uncertainty assessment. It also required strengthening the behavioural capabilities that underpin effective investment decisions, including recognizing cognitive biases, challenging assumptions, and communicating uncertainty in a structured and transparent manner.

  • Advances in quantitative seismic interpretation workshop in Muscat

    by Mahra Al-Hadhrami, Olivier Kirstetter, Ahmed Alhamad

    After a successful Society of Exploration Geophysicist’s (SEG) workshop held in 2023 on “Advances in Quantitative Seismic Interpretation,” a follow-up workshop was organized in 2025, which took place in Muscat, Oman in February 2025.

  • New geophysical aspects for production enhancement

    by Qais Al-Siyabi, Ali Mahozi, Eman Al-Shehri

    The Society of Exploration Geophysicists (SEG) hosted a transformative workshop titled “New Geophysical Aspects for Production Enhancement,” 13–15 May 2025, in Muscat, Oman. The workshop brought together over 55 participants from 19 companies across 12 countries to explore how emerging geophysical innovations are reshaping the landscape of reservoir development and production optimization.

  • Advanced Diagnostic and Inspection Solutions for Restoring Capacity in Non Piggable GRE Pipelines

    by Al-Kasbi Haitham

    This paper presents a practical de-bottlenecking methodology applied to an unexpected reduction in pipeline throughput following a shutdown and subsequent ramp-up event, which resulted in elevated back-pressure and production deferment. The affected pipeline is constructed from Glass Reinforced Epoxy (GRE), introducing additional operational challenges due to its non-piggable nature and limited accessibility for internal inspection and mechanical cleaning. Initial diagnostic activities included steady-state and transient hydraulic modeling calibrated against operating data, detailed review of fluid composition and flow assurance risks, pump and control valve performance assessment, and inspection of filters and strainers. Chemical treatment strategies were also reviewed to address potential deposition mechanisms. Despite these efforts, the underlying restriction could not be conclusively identified using conventional methods, consistent with challenges commonly reported for non-piggable composite pipelines. To overcome these limitations, a temporary Long-Length Reinforced Thermoplastic Pipeline (LLRTP) configuration was utilized to reroute production, enabling isolation of the GRE pipeline and internal inspection using camera-based techniques. This approach confirmed the presence of sludge and solid deposits within the pipeline, likely mobilized during the shutdown and ramp-up cycle, a phenomenon widely recognized in flow assurance literature. The applied methodology successfully enabled identification of the root cause, restoration of pipeline capacity, and maintenance of continuous production. The study highlights the value of integrating diagnostic modeling, equipment optimization, chemical treatment review, and temporary bypass infrastructure to manage flow assurance challenges in non-piggable pipeline systems.

  • Open Access

    Assessing Carbon Stock and Sequestration Capacity of Phragmites australis Using Integrated Destructive Sampling and Remote Sensing Approaches in Arid Environments

    by Khaled Aljabri, Yaseen Al-Mulla, Mohammed Al Sulaimani, Hameed Sulaiman, Ahmed Tabook, Ahmed Al-Abri

    Phragmites australis (common reed) is a resilient wetland species providing key ecosystem services, including carbon sequestration. However, its carbon storage potential in hyper-arid environments remains insufficiently quantified. This study develops an integrated framework combining destructive sampling and remote sensing to assess biomass distribution and carbon stocks in Oman. Results show that destructively measured AGB correlates only weakly with reed height (R² = 0.15), indicating that height alone is not a reliable standalone predictor of biomass in this system; an initially high fit (R² ≈ 0.99) reflected the mathematical dependence of the height-based allometric equations on their own input variable rather than genuine predictive validity. While predictive models based on dry biomass and TOC showed moderate to low performance (R² < 0.16), vegetation indices derived from remote sensing demonstrated high accuracy in estimating spatial biomass variability. Carbon stock estimates ranged between ~0.36 and 1.95 kg/m² depending on the method used. While localized allometric models showed limited predictive power due to high variability in tiller density, vegetation spectral indices demonstrated high accuracy (R² = 0.78), highlighting remote sensing as a viable tool for spatial carbon assessment in arid wetland ecosystems. These findings highlight the potential of integrating field-based and remote sensing approaches to improve carbon accounting in arid wetlands. The study provides a scalable framework for ecosystem-based carbon assessment and supports the role of P. australis as a nature-based solution for climate mitigation in water-stressed regions.