A hybrid approach to the single line scheduling problem with multiple products and sequence-dependent time
- 31 December 2003
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 45 (4) , 573-583
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Scheduling manufacturing systems in an agile environmentRobotics and Computer-Integrated Manufacturing, 2001
- A framework for the description of evolutionary algorithmsEuropean Journal of Operational Research, 2000
- Constraint propagation techniques for the disjunctive scheduling problemArtificial Intelligence, 2000
- Multi-product planning and scheduling using genetic algorithm approachComputers & Industrial Engineering, 2000
- Evaluation and comparison of production schedulesComputers in Industry, 2000
- Constraint satisfaction problems: Algorithms and applicationsEuropean Journal of Operational Research, 1999
- A tutorial survey of job-shop scheduling problems using genetic algorithms: Part II. Hybrid genetic search strategiesComputers & Industrial Engineering, 1999
- A modified genetic algorithm for single machine schedulingComputers & Industrial Engineering, 1999
- Deterministic job-shop scheduling: Past, present and futureEuropean Journal of Operational Research, 1999
- Costs in design of scheduling algorithms: A study on branch-and-bound methodologyComputers & Industrial Engineering, 1997