An exact method for designing Shewhart and S2 control charts to guarantee in-control performance
Authors:
- 26 September 2017
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (7) , 2570-2584
Abstract
No abstract availableKeywords
All Related Versions
Funding Information
- Fonds De La Recherche Scientifique - FNRS (FNRS)
This publication has 23 references indexed in Scilit:
- Guaranteed Conditional Performance of Control Charts via Bootstrap MethodsScandinavian Journal of Statistics, 2013
- Geometric Charts with Estimated Control LimitsQuality and Reliability Engineering International, 2012
- Assessing the effect of estimation error on risk-adjusted CUSUM chart performanceInternational Journal for Quality in Health Care, 2011
- The Variable Sample Size Chart with Estimated ParametersQuality and Reliability Engineering International, 2011
- THE EXACT RUN LENGTH DISTRIBUTION AND DESIGN OF THE S2 CHART WHEN THE IN-CONTROL VARIANCE IS ESTIMATEDInternational Journal of Reliability, Quality and Safety Engineering, 2009
- Conditional and marginal performance of the Poisson CUSUM control chart with parameter estimationInternational Journal of Production Research, 2007
- Parameter estimation and design considerations in prospective applications of theX¯ chartJournal of Applied Statistics, 2006
- New Corrections for Old Control ChartsQuality Engineering, 2005
- Are estimated control charts in control?Statistics, 2004
- A brief tutorial on the estimation of the process standard deviationIIE Transactions, 1999