Alireza Faraz
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Alireza Faraz has a total of 37 co-authors. Here are the top co-authors by number of shared publications:
Erwin Saniga
Business Administration, University of Delaware, Newark, DE, USA
8 shared publicationsCédric Heuchenne
HEC Liège, Management School of the University of Liège, Liège, Belgium
7 shared publications- Mohammad Bameni Moghadam
Allameh Tabataba'i University Department of Statistics
6 shared publications - Ahmad Parsian
University of Tehran
3 shared publications - Asghar Seif
Department of Statistics, Bu-Ali Sina University, Hamedan, Iran
3 shared publications - Erwin Saniga
University of Delaware Newark DE 19716 USA
3 shared publications
Latest Publications
- 1 October 2018
- Published by Emerald Publishing in International Journal of Quality & Reliability Management
- Vol. 35 (9) , 1809-1834
Constrained optimal design of X̅ control chart with multiple assignable causes under Burr XII failure mechanism
Purpose: The purpose of this paper is to develop a cost model by the variable sampling interval and optimization of the average cost per unit of time. The paper considers an economic–statistical design of the X̅ control charts under the Burr shock model and multiple assignable causes were considered and compared with three types of prior distribution for the mean shift parameter. Design/methodology/approach: The design of the modified X̅ chart is based on the two new concepts of adjusted average time to signal and average number of false alarms for X̅ control chart under Burr XII shock model with multiple assignable causes. Findings: The cost model was examined through a numerical example, with the same cost and time parameters, so the optimal of design parameters were obtained under uniform and non-uniform sampling schemes. Furthermore, a sensitivity analysis was conducted in a way that the variability of loss cost and design parameters was evaluated supporting the changes of cost, time and Burr XII distribution parameters. Research limitations/implications: The economic–statistical model scheme of X̅ chart was developed for the Burr XII distributed with multiple assignable causes. The correlated data are among the assumptions to be examined. Moreover, the optimal schemes for the economic-statistic chart can be expanded for correlated observation and continuous process. Practical implications: The economic–statistical design of control charts depends on the process shock model distribution and due to difficulties from both theoretical and practical aspects; one of the proper alternatives may be the Burr XII distribution which is quite flexible. Yet, in Burr distribution context, only one assignable cause model was considered where more realistic approach may be to consider multiple assignable causes. Originality/value: This study presents an advanced theoretical model for cost model that improved the shock model that presented in the literature. The study obviously indicates important evidence to justify the implementation of cost models in a real-life industry.
- 1 October 2018
- Published by Emerald Publishing in International Journal of Quality & Reliability Management
- Vol. 35 (9) , 1809-1834
Constrained optimal design of X̅ control chart with multiple assignable causes under Burr XII failure mechanism
Purpose: The purpose of this paper is to develop a cost model by the variable sampling interval and optimization of the average cost per unit of time. The paper considers an economic–statistical design of the X̅ control charts under the Burr shock model and multiple assignable causes were considered and compared with three types of prior distribution for the mean shift parameter. Design/methodology/approach: The design of the modified X̅ chart is based on the two new concepts of adjusted average time to signal and average number of false alarms for X̅ control chart under Burr XII shock model with multiple assignable causes. Findings: The cost model was examined through a numerical example, with the same cost and time parameters, so the optimal of design parameters were obtained under uniform and non-uniform sampling schemes. Furthermore, a sensitivity analysis was conducted in a way that the variability of loss cost and design parameters was evaluated supporting the changes of cost, time and Burr XII distribution parameters. Research limitations/implications: The economic–statistical model scheme of X̅ chart was developed for the Burr XII distributed with multiple assignable causes. The correlated data are among the assumptions to be examined. Moreover, the optimal schemes for the economic-statistic chart can be expanded for correlated observation and continuous process. Practical implications: The economic–statistical design of control charts depends on the process shock model distribution and due to difficulties from both theoretical and practical aspects; one of the proper alternatives may be the Burr XII distribution which is quite flexible. Yet, in Burr distribution context, only one assignable cause model was considered where more realistic approach may be to consider multiple assignable causes. Originality/value: This study presents an advanced theoretical model for cost model that improved the shock model that presented in the literature. The study obviously indicates important evidence to justify the implementation of cost models in a real-life industry.
- 22 March 2018
- Published by Taylor & Francis in Journal of Statistical Computation and Simulation
- Vol. 88 (11) , 2111-2136
Economic statistical design of a multivariate control chart under a Burr XII shock model with multiple assignable causes
Control charts show the distinction between the random and assignable causes of variation in a process. The real process may be affected by many characteristics and several assignable causes. Therefore, the economic statistical design of multiple control chart under Burr XII shock model with multiple assignable causes can be an appropriate candidate model. In this paper, we develop a cost model based on the optimization of the average cost per unit of time. Indeed, the cost model under the influence of a single match case assignable cause and multiple assignable causes under a same cost and time parameters were compared. Besides, a sensitivity analysis was also presented in which the changeability of loss-cost and design parameters were evaluated based on the changes in cost, time and Burr XII distribution parameters.
- 22 March 2018
- Published by Taylor & Francis in Journal of Statistical Computation and Simulation
- Vol. 88 (11) , 2111-2136
Economic statistical design of a multivariate control chart under a Burr XII shock model with multiple assignable causes
Control charts show the distinction between the random and assignable causes of variation in a process. The real process may be affected by many characteristics and several assignable causes. Therefore, the economic statistical design of multiple control chart under Burr XII shock model with multiple assignable causes can be an appropriate candidate model. In this paper, we develop a cost model based on the optimization of the average cost per unit of time. Indeed, the cost model under the influence of a single match case assignable cause and multiple assignable causes under a same cost and time parameters were compared. Besides, a sensitivity analysis was also presented in which the changeability of loss-cost and design parameters were evaluated based on the changes in cost, time and Burr XII distribution parameters.
- 2 March 2018
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (18) , 6225-6239
Monitoring type B buyer–supplier relationships
The ability to monitor supplier performance is a critical capability for maintaining strong buyer–supplier relationships. Monitoring type B suppliers is especially challenging as they are not as clearly defined as either type A, with strong strategic partnerships, or type C, with little partnership. This research develops a non-parametric multivariate Hoteling’s T 2 control chart to capture the in-control state of a dyadic relationship (Phase I), and show how it would be developed based on survey data of buyer–supplier relationship attributes. Modelling the satisfactory level of dyadic relationship performance is very useful for identifying when the relationship begins to move away from the desired state. We then use the designed control chart to monitor the relationship between dyads over time to determine if any unusual behaviour has occurred (Phase II) and illustrate its implementation through a case study from the auto industry. This research illustrates how supply chain managers can secure and improve their supply chain performance by monitoring and maintaining strong relationships with their partners. The proposed method extends the existing SPC tools to effectively manage Type B buyer–supplier relationships.
- 2 March 2018
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (18) , 6225-6239
Monitoring type B buyer–supplier relationships
The ability to monitor supplier performance is a critical capability for maintaining strong buyer–supplier relationships. Monitoring type B suppliers is especially challenging as they are not as clearly defined as either type A, with strong strategic partnerships, or type C, with little partnership. This research develops a non-parametric multivariate Hoteling’s T 2 control chart to capture the in-control state of a dyadic relationship (Phase I), and show how it would be developed based on survey data of buyer–supplier relationship attributes. Modelling the satisfactory level of dyadic relationship performance is very useful for identifying when the relationship begins to move away from the desired state. We then use the designed control chart to monitor the relationship between dyads over time to determine if any unusual behaviour has occurred (Phase II) and illustrate its implementation through a case study from the auto industry. This research illustrates how supply chain managers can secure and improve their supply chain performance by monitoring and maintaining strong relationships with their partners. The proposed method extends the existing SPC tools to effectively manage Type B buyer–supplier relationships.
- 26 September 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (7) , 2570-2584
An exact method for designing Shewhart and S2 control charts to guarantee in-control performance
- 26 September 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (7) , 2570-2584
An exact method for designing Shewhart and S2 control charts to guarantee in-control performance
- 23 October 2016
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 33 (5) , 1057-1066
The np Chart with Guaranteed In‐control Average Run Lengths
We evaluate the in‐control performance of the np‐control chart with estimated parameter conditional on the Phase I sample. We then apply the bootstrap method to adjust the control chart limits to guarantee the desired in‐control average run length (ARL0) value in the monitoring stage. The adjusted limits ensure that the ARL0 would take a value greater than the desired value (say, B) with a certain specified probability, that is, Pr(ARL0 > B) = 1 − ρ. The results indicate that adjusting control limits is not always necessary. We present a method to design control charts such that in control and out of control run lengths are guaranteed with pre specified probabilities. This method is an improvement of the classical statistical design approach employing constraints on in control and out of control ARL because, with this approach, there is a substantial probability that the actual run length in control may be too small. In addition, using the ARL approach may result in an actual out of control run length that is too large. Some numerical examples illustrate the efficacy of this design method. Copyright © 2016 John Wiley & Sons, Ltd.
- 23 October 2016
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 33 (5) , 1057-1066
The np Chart with Guaranteed In‐control Average Run Lengths
We evaluate the in‐control performance of the np‐control chart with estimated parameter conditional on the Phase I sample. We then apply the bootstrap method to adjust the control chart limits to guarantee the desired in‐control average run length (ARL0) value in the monitoring stage. The adjusted limits ensure that the ARL0 would take a value greater than the desired value (say, B) with a certain specified probability, that is, Pr(ARL0 > B) = 1 − ρ. The results indicate that adjusting control limits is not always necessary. We present a method to design control charts such that in control and out of control run lengths are guaranteed with pre specified probabilities. This method is an improvement of the classical statistical design approach employing constraints on in control and out of control ARL because, with this approach, there is a substantial probability that the actual run length in control may be too small. In addition, using the ARL approach may result in an actual out of control run length that is too large. Some numerical examples illustrate the efficacy of this design method. Copyright © 2016 John Wiley & Sons, Ltd.
- 1 January 2015
- Published by Springer Nature
- p. 201-217
Characteristics of Economically Designed CUSUM and $\bar{X}$ Control Charts- 1 January 2015
- Published by Springer Nature
- p. 201-217
Characteristics of Economically Designed CUSUM and $\bar{X}$ Control Charts- 3 November 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (14) , 4405-4413
Guaranteed conditional performance of theS2control chart with estimated parameters
We evaluate the in-control performance of the S2 control chart with estimated parameters conditional on the Phase I sample. Simulation results indicate no realistic amount of Phase I data is enough to have confidence that the in-control average run length (ARL) obtained will be near the desired value. To overcome this problem, we adjust the S2 chart’s control limits such that the in-control ARL is guaranteed to be above a specified value with a certain specified probability. The required adjustment does not have too much of an adverse effect on the out-of-control performance of the chart.
- 3 November 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (14) , 4405-4413
Guaranteed conditional performance of theS2control chart with estimated parameters
We evaluate the in-control performance of the S2 control chart with estimated parameters conditional on the Phase I sample. Simulation results indicate no realistic amount of Phase I data is enough to have confidence that the in-control average run length (ARL) obtained will be near the desired value. To overcome this problem, we adjust the S2 chart’s control limits such that the in-control ARL is guaranteed to be above a specified value with a certain specified probability. The required adjustment does not have too much of an adverse effect on the out-of-control performance of the chart.
- 3 November 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (14) , 4218-4230
Economic statistical design of the VP control charts for monitoring a process under non-normality
Recent studies proved that variable parameters (VP) control charts not only detect process mean shifts quicker than the classical control chart but also have better economic properties. While most papers in control chart design assume that process data are normally distributed this may not be true in practice. In this paper, we investigate the economic statistical design of the VP control chart when the underlying process distribution is non-normal. Here, we use the Burr distribution as a model of the process quality variable distribution because of its flexibility in terms of being able to model many distributions including the normal. We illustrate the design procedure and perform a sensitivity analysis on the process and cost parameters based upon the degrees of skewness and kurtosis of the population using an industrial application.
- 3 November 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (14) , 4218-4230
Economic statistical design of the VP control charts for monitoring a process under non-normality
Recent studies proved that variable parameters (VP) control charts not only detect process mean shifts quicker than the classical control chart but also have better economic properties. While most papers in control chart design assume that process data are normally distributed this may not be true in practice. In this paper, we investigate the economic statistical design of the VP control chart when the underlying process distribution is non-normal. Here, we use the Burr distribution as a model of the process quality variable distribution because of its flexibility in terms of being able to model many distributions including the normal. We illustrate the design procedure and perform a sensitivity analysis on the process and cost parameters based upon the degrees of skewness and kurtosis of the population using an industrial application.
- 11 July 2014
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 31 (8) , 1565-1574
Shewhart Control Charts for Monitoring Reliability with Weibull Lifetimes
In this paper, we present Shewhart‐type and S2 control charts for monitoring individual or joint shifts in the scale and shape parameters of a Weibull distributed process. The advantage of this method is its ease of use and flexibility for the case where the process distribution is Weibull, although the method can be applied to any distribution. We illustrate the performance of our method through simulation and the application through the use of an actual data set. Our results indicate that and S2 control charts perform well in detecting shifts in the scale and shape parameters. We also provide a guide that would enable a user to interpret out‐of‐control signals. Copyright © 2014 John Wiley & Sons, Ltd.
- 11 July 2014
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 31 (8) , 1565-1574
Shewhart Control Charts for Monitoring Reliability with Weibull Lifetimes
In this paper, we present Shewhart‐type and S2 control charts for monitoring individual or joint shifts in the scale and shape parameters of a Weibull distributed process. The advantage of this method is its ease of use and flexibility for the case where the process distribution is Weibull, although the method can be applied to any distribution. We illustrate the performance of our method through simulation and the application through the use of an actual data set. Our results indicate that and S2 control charts perform well in detecting shifts in the scale and shape parameters. We also provide a guide that would enable a user to interpret out‐of‐control signals. Copyright © 2014 John Wiley & Sons, Ltd.
- 16 June 2014
- Published by Taylor & Francis in Journal of Statistical Computation and Simulation
- Vol. 85 (12) , 2442-2455
Evaluation of the economic statistical design of the multivariateT2control chart with multiple variable sampling intervals scheme: NSGA-II approach
The economic and statistical merits of a multiple variable sampling intervals scheme are studied. The problem is formulated as a double-objective optimization problem with the adjusted average time to signal as the statistical objective and the expected cost per hour as the economic objective. Bai and Lee's [An economic design of variable sampling interval ¯X control charts. Int J Prod Econ. 1998;54:57–64] economic model is considered. Then we find the Pareto-optimal designs in which the two objectives are minimized simultaneously by using the non-dominated sorting genetic algorithm. Through an illustrative example, the advantages of the proposed approach are shown by providing a list of viable optimal solutions and graphical representations, which indicate the advantage of flexibility and adaptability of our approach.
- 16 June 2014
- Published by Taylor & Francis in Journal of Statistical Computation and Simulation
- Vol. 85 (12) , 2442-2455
Evaluation of the economic statistical design of the multivariateT2control chart with multiple variable sampling intervals scheme: NSGA-II approach
The economic and statistical merits of a multiple variable sampling intervals scheme are studied. The problem is formulated as a double-objective optimization problem with the adjusted average time to signal as the statistical objective and the expected cost per hour as the economic objective. Bai and Lee's [An economic design of variable sampling interval ¯X control charts. Int J Prod Econ. 1998;54:57–64] economic model is considered. Then we find the Pareto-optimal designs in which the two objectives are minimized simultaneously by using the non-dominated sorting genetic algorithm. Through an illustrative example, the advantages of the proposed approach are shown by providing a list of viable optimal solutions and graphical representations, which indicate the advantage of flexibility and adaptability of our approach.