Basic aspects of partial discharge on-site testing of long length transmission power cables
- 24 April 2017
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Dielectrics and Electrical Insulation
- Vol. 24 (2) , 1077-1087
Abstract
More and more transmission power cable circuits with lengths up to several tens of kilometers will be installed and put into operation. This contribution discusses basic aspects of selecting an on-site test voltage and the partial discharge measurement under on-site testing conditions of power cable lines with long length. On the one side, the generation of suitable test voltages for high capacitive loads, especially long cables, is evaluated and experiences of on-site measurements are described. On the other hand, the challenges for sensitive partial discharge measurement on long length power cables are discussed. Under this scope, partial discharge measurement by dual-sided measurement technique is described and examples are shown.Keywords
This publication has 7 references indexed in Scilit:
- On-site testing and diagnosis of transmission power cables up to 230 kV using damped AC voltagesIEEE Electrical Insulation Magazine, 2014
- Practical aspects of PD localization for long length power cables2013
- Power cable modeling for PD pulse propagation and sensitivity2013
- On-site testing and diagnosis of long medium voltage cables2012
- New developments in on-site testing of long lengths of (E)HV power cable2012
- Estimation of dielectric loss using damped AC voltagesIEEE Electrical Insulation Magazine, 2011
- Two years of experience with a mobile resonant test system for testing of installed medium- and high voltage power cables1999