Abstract
Failure of the unreinforced concrete invert of the Burnley Tunnel during a field pressure test to 600kPa required the installation of some 5200 permanent ground anchors for structural remediation. The paper describes grout simulation gun barrel tests, carried out under factory controlled conditions, to investigate and demonstrate the effectiveness of the anchor components when grouted and subjected to tensile loading. In addition, the techniques to ensure satisfactory in situ grouting of the anchors under hydrostatic pressures of up to 600kPa are described. The associated testing and quality control systems employed for the grouting are detailed as they were considered essential in order to ensure that the highest quality product was constructed and fit for its intended purpose over the 120-year designed service life of the tunnel.