SLStuart Littlejohn

Stuart Littlejohn

*This is an algorithmically generated author record based on publicly available information.

Stuart Littlejohn has a total of 2 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Grouting of Anchors to Resist Hydrostatic Uplift at Burnley Tunnel, Melbourne, Australia

    by Devon Mothersille, Stuart Littlejohn

    Failure of the unreinforced concrete invert of the Burnley Tunnel during a field pressure test to 600kPa required the installation of some 5200 permanent ground anchors for structural remediation. The paper describes grout simulation gun barrel tests, carried out under factory controlled conditions, to investigate and demonstrate the effectiveness of the anchor components when grouted and subjected to tensile loading. In addition, the techniques to ensure satisfactory in situ grouting of the anchors under hydrostatic pressures of up to 600kPa are described. The associated testing and quality control systems employed for the grouting are detailed as they were considered essential in order to ensure that the highest quality product was constructed and fit for its intended purpose over the 120-year designed service life of the tunnel.


  • Grouting of Permanent Intruded Concrete Tunnel Plugs at South Deep Gold Mine, South Africa

    by Stuart Littlejohn, Donald A. Bruce

    The potential closure and subsequent flooding of a neighbouring mine necessitated the construction of a rough parallel intruded concrete plug within each of the tunnels connecting the two mines through a 40m thick boundary rock wall. The paper describes the design and construction of three 30m long tunnel plugs formed in Witwatersrand quartzite to withstand safely highly acidic groundwater at a maximum hydrostatic head of 1500m for 100 years and two 25m long plugs in Ventersdorp lava where the groundwater was neutral at a head of 1250m. For the known rock mass properties, design considerations include grout design for the rock/plug interface and rock mass, mortar design for injection of the preplaced aggregate and associated strength and stiffness properties. For plug construction, each critical element is described, i.e. rock preparation, pre-grouting of rock mass, placement of coarse aggregate, grouting plant, injection procedures and the associated quality controls.