Abstract
Hydrocarbon gas injection projects are undertaken in order to maintain reservoir pressure, produce oil through swelling and reduce residual oil saturation by decreasing the interfacial tension (IFT). Along with local displacement efficiency, macroscopic sweep efficiency plays a dominant role in the success of gas injection projects, as recovery from the field depends strongly on reservoir geology and petrophysical properties. In this paper, a case study of one of the hydrocarbon gas injection pilots is discussed as the performance of the other two pilots has already been described in Kumar et al. 2015a. A five-spot pattern hydrocarbon gas injection pilot in tertiary mode has been carried out in a giant carbonate reservoir offshore Middle East, which has long peripheral water injection history. A comprehensive monitoring plan, including an observer well, was applied through time-lapse saturation logging, single well chemical tracer test (SWCTT), pressure measurements, production testing, and tracer campaign to assess the pilot performance and minimize uncertainties before large-scale application. This paper presents the overview of the pilot, monitoring plan and the findings which include microscopic and macroscopic sweep efficiency. The pilot areal sweep performance was affected by the existing pressure gradient of peripheral water injection while the vertical sweep efficiency was strongly affected by the reservoir heterogeneity. At the cessation of the pilot, a value of 6 ± 3% was measured from SWCTT in the producer well, which shows the robustness of the gas local displacement efficiency. The history match performed indicates that for the same pilot, the performance can be improved using horizontal line drive in place of five-spot pattern and it can further be enhanced through water-alternating-gas (WAG) injection. The learning from the three gas injection pilots is used in re-designing the future large-scale development plan and is described in details in Kumar et al., 2016a and 2016b.Keywords
This publication has 15 references indexed in Scilit:
- Design of CO2 Injection Pilot in Offshore Middle East Carbonate Reservoir2016
- Gas Injection EOR Screening by Laboratory Experiment and Sector Modeling in Carbonate Reservoir2015
- Simulation of Residual Oil Saturation in Near-Miscible Gasflooding Through Saturation-Dependent Tuning of the Equilibrium ConstantsSPE Reservoir Evaluation & Engineering, 2015
- Modelling Residual Oil Saturation in Miscible and Immiscible Gas Floods By Use of Alpha-Factors2011
- Wettability and Saturation in Abu Dhabi Carbonate Reservoirs1999
- A Case Study in Scaleup for Multicontact Miscible Hydrocarbon Gas InjectionSPE Reservoir Evaluation & Engineering, 1998
- Design of Action Plan and Monitoring Program; Secondary and Tertiary Gas Injection Pilots in a Limestone Reservoir1998
- Single-Well Tracer Test in Complex Pore Systems1986
- Effect Of Grid Size In The Compositional Simulation Of CO2 Injection1977
- Single-Well Tracer Method To Measure Residual Oil SaturationJournal of Petroleum Technology, 1973