Construction Database‐Supported and BIM‐Based Interface Communication and Management: A Pilot Project
Open Access
- 1 January 2019
- journal article
- research article
- Published by Wiley in Advances in Civil Engineering
- Vol. 2019 (1)
Abstract
Construction projects are subject to numerous interface problems, particularly during the construction phase. The absence of suitable systems or platforms to tackle these issues could hinder the performance of construction management. Thus, the communication and management of interfaces (CMI) are necessary to improve the quality of the management of construction projects. E‐mail and generic construction information systems are commonly used communication tools; however, they pose several limitations in recording and managing as well as in responding to interface problems. Building information modeling (BIM), by contrast, saves and delivers information in a digital format in a 3D computer‐aided design (CAD) environment. The adoption of BIM technology integrated with web technology for construction projects allows users to communicate interface issues and obtain responses for them effectively. Thus, this study develops a database‐supported and BIM‐based CMI (DBCMI) system for general contractors to enhance their CMI work efficiency during the construction phase. To confirm the efficacy of the CMI, the DBCMI system was used in a building project in Taiwan. The case study results reveal that the proposed DBCMI system is an effective communication and management platform, particularly for practical CMI work integrated with BIM technology. This study concludes with the benefits of using the proposed system and possible limitations in its further application.Keywords
Funding Information
- Ministry of Science and Technology, Taiwan (MOST-107-2221-E-027-024)
This publication has 26 references indexed in Scilit:
- Enhancing Trust-Based Interface Management in International Engineering-Procurement-Construction ProjectsJournal of Construction Engineering and Management, 2017
- Current Status of Interface Management in Construction: Drivers and Effects of Systematic Interface ManagementJournal of Construction Engineering and Management, 2016
- Contractors’ Transformation Strategies for Adopting Building Information ModelingJournal of Management in Engineering, 2016
- Construction network-based interface management systemAutomation in Construction, 2013
- Object Model Framework for Interface Modeling and IT-Oriented Interface ManagementJournal of Construction Engineering and Management, 2010
- Organising for Improved Construction Interfaces2009
- Use of a WBS Matrix to Improve Interface Management in ProjectsJournal of Construction Engineering and Management, 2006
- Interface Management for China’s Build–Operate–Transfer ProjectsJournal of Construction Engineering and Management, 2005
- Process-Parameter-Interface Model for Design ManagementJournal of Construction Engineering and Management, 2003
- Common Interface Problems among Various Construction PartiesJournal of Performance of Constructed Facilities, 2000