Exact and metaheuristic algorithms for flow-shop scheduling problems with release dates
Authors:
- 15 August 2021
- journal article
- research article
- Published by Taylor & Francis in Engineering Optimization
- Vol. 54 (11) , 1853-1869
Abstract
Flow-shop scheduling is an extremely popular optimization model in industrial production, where each job must be scheduled on a series of machines following an identical process. The optimal criteria, makespan and maximum delivery–completion time, are investigated separately. A mixed integer programming model is built to evaluate the exact algorithm in simulation experiments. Given that these problems are NP hard and cannot be solved in polynomial time, exact and metaheuristic methods are proposed for different problem sizes. For small-scale instances, optimal schedules are achieved using an effective branch-and-bound algorithm, in which elaborately designed lower bound and branching rules significantly improve computational efficiency. For medium-scale instances, satisfactory solutions are obtained using a hybrid discrete differential evolution algorithm with improvement schemes to promote its performance. The experimental results show the effectiveness of the proposed algorithms.Keywords
Funding Information
- National Natural Science Foundation of China (61433014, 61473073, 61873173)
- Program for Liaoning Excellent Talents in University (LJQ2014028)
- Fundamental Research Funds for the Central Universities (181706001, 182608003, N161702001, N171706003)
This publication has 29 references indexed in Scilit:
- An effective hybrid discrete differential evolution algorithm for the flow shop scheduling with intermediate buffersInformation Sciences, 2011
- New heuristics for flow shop problem to minimize makespanJournal of the Operational Research Society, 2010
- Note on Shim and Kim’s lower bounds for scheduling on identical parallel machines to minimize total tardinessEuropean Journal of Operational Research, 2009
- Flowshop scheduling research after five decadesEuropean Journal of Operational Research, 2006
- The effectiveness of the longest delivery time rule for the flow shop delivery time problemNaval Research Logistics (NRL), 2003
- Minimizing tardiness in a two-machine flow-shopComputers & Operations Research, 2002
- A computational study with a new algorithm for the three-machine permutation flow-shop problem with release timesEuropean Journal of Operational Research, 2001
- Minimising makespan in the two-machine flow-shop with release timesJournal of the Operational Research Society, 1998
- On Flow Shop Scheduling with Release and Due Dates to Minimize Maximum LatenessJournal of the Operational Research Society, 1983
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954