Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint
Authors:
- Zhan-Tao LiZLZhan-Tao Li
- Qing-Xin ChenQCQing-Xin Chen
- Ning MaoNMNing Mao
- Xiaoming WangXWXiaoming Wang
- Jianjun LiuJLJianjun Liu
- 1 December 2013
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 146 (2) , 667-678
Abstract
No abstract availableFunding Information
- National Natural Science Foundations of China (51175094, 51205068, 51305083)
This publication has 30 references indexed in Scilit:
- Bi-criteria group scheduling in hybrid flowshopsInternational Journal of Production Economics, 2013
- A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited bufferInternational Journal of Production Economics, 2013
- Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machinesInternational Journal of Production Research, 2008
- An immune algorithm approach to the scheduling of a flexible PCB flow shopThe International Journal of Advanced Manufacturing Technology, 2003
- Heuristics for hybrid flow shops with controllable processing times and assignable due datesComputers & Operations Research, 2002
- Heuristics for scheduling in a flow shop with multiple processorsEuropean Journal of Operational Research, 1999
- Scheduling in job shops with machine breakdowns: an experimental studyComputers & Industrial Engineering, 1999
- Design of efficient job shop scheduling rulesComputers & Industrial Engineering, 1997
- Scheduling groups of jobs in the two-machine flow shopMathematical and Computer Modelling, 1990
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988