Bi-criteria group scheduling in hybrid flowshops
Authors:
- Mir Abbas BozorgiradMBMir Abbas Bozorgirad
- Rasaratnam LogendranRLRasaratnam Logendran
- 1 October 2013
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 145 (2) , 599-612
Abstract
No abstract availableKeywords
This publication has 43 references indexed in Scilit:
- Sequence-dependent group scheduling problem on unrelated-parallel machinesExpert Systems with Applications, 2012
- Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min–max techniqueSoft Computing, 2010
- New multi-objective method to solve reentrant hybrid flow shop scheduling problemEuropean Journal of Operational Research, 2010
- A survey of scheduling problems with setup times or costsEuropean Journal of Operational Research, 2008
- Hybrid tabu search for re-entrant permutation flow-shop scheduling problemExpert Systems with Applications, 2008
- A tabu search approach for the flow shop scheduling problemEuropean Journal of Operational Research, 1998
- A composite heuristic for the single machine early/tardy job scheduling problemComputers & Operations Research, 1998
- Single Machine Group Scheduling with Two Ordered CriteriaJournal of the Operational Research Society, 1996
- Business process re‐engineeringWork Study, 1995
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976