Complexity of single machine scheduling subject to nonnegative inventory constraints
Authors:
- Dirk BriskornDBDirk Briskorn
- Byung-Cheon ChoiBCByung-Cheon Choi
- Kangbok LeeKLKangbok Lee
- Joseph LeungJLJoseph Leung
- Michael PinedoMPMichael Pinedo
- 1 December 2010
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 207 (2) , 605-619
Abstract
No abstract availableThis publication has 19 references indexed in Scilit:
- The project scheduling problem with production and consumption of resources: A list-scheduling based algorithmDiscrete Applied Mathematics, 2009
- Scheduling tests in automotive R&D projectsEuropean Journal of Operational Research, 2009
- Scheduling inbound and outbound trucks at cross docking terminalsOR Spectrum, 2008
- Job-shop scheduling with limited capacity buffersOR Spectrum, 2006
- Basic scheduling problems with raw material constraintsNaval Research Logistics (NRL), 2005
- Flow-shop problems with intermediate buffersOR Spectrum, 2003
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new resultsArtificial Intelligence, 2003
- Heuristics for scheduling with inventory: dynamic focus via constraint criticalityJournal of Scheduling, 2002
- Approximation Schemes for the Restricted Shortest Path ProblemMathematics of Operations Research, 1992
- Faster algorithms for the shortest path problemJournal of the ACM, 1990