The project scheduling problem with production and consumption of resources: A list-scheduling based algorithm
Authors:
- 1 October 2009
- journal article
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 157 (17) , 3631-3642
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- On the complexity of scheduling unit-time jobs with OR-precedence constraintsOperations Research Letters, 2005
- Heuristics for scheduling with inventory: dynamic focus via constraint criticalityJournal of Scheduling, 2002
- A Constraint-Based Method for Project Scheduling with Time WindowsJournal of Heuristics, 2002
- An integrated survey of deterministic project schedulingOmega, 2001
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- Chapter IV Network flows1989
- Scheduling project networks with resource constraints and time windowsAnnals of Operations Research, 1988
- A fast feasibility test for relocation problemsEuropean Journal of Operational Research, 1988
- Scheduling to Minimize Maximum Cumulative Cost Subject to Series-Parallel Precedence ConstraintsOperations Research, 1978
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954