Abstract
Materials Requirement Planning (MRP) technique is widely employed by most manufacturing companies, even though field applications point out some weaknesses, including ignored production capacity constraints and fixed lead-times. These weaknesses often lead to infeasible production schedules, which trigger fluctuating workloads over time, significant adjustment effort and eventually unpredictably long lead times. This paper introduces a capacity-oriented MRP procedure that combines the traditional MRP procedure with an approach based on linear programming: in this way, requirement of lead times pre-determined a priori outside the MRP procedure is overcome. The new procedure is then applied to a real-life company and results highlight that feasible plans of orders are generated without requiring lead-times as input and without relevant computational burden.Keywords
This publication has 33 references indexed in Scilit:
- A simulation-based finite capacity MRP procedure not depending on lead time estimationInternational Journal of Operational Research, 2011
- Integrating production planning and control: towards a simple model for Capacitated ERPProduction Planning & Control, 2010
- A high performance finite capacitated MRP process using a computational gridInternational Journal of Production Research, 2009
- Evaluating supply chain integration: a case study using fuzzy logicProduction Planning & Control, 2008
- Capacitated lot sizing with alternative routings and overtime decisionsInternational Journal of Production Research, 2006
- Development of finite capacity material requirement planning system for assembly operationsProduction Planning & Control, 2004
- Finite capacity scheduling method for MRP with lot size restrictionsInternational Journal of Production Research, 2001
- The effect of MRP lot sizing on actual cumulative lead times in multi-level systemsProduction Planning & Control, 1998
- Integrating MRP and finite capacity planningProduction Planning & Control, 1997
- A System for Managing Job-Shop ProductionThe Journal of Business, 1966