Ice-core drilling problems and solutions
Authors:
- Pavel ТalalayPТPavel Тalalay
- Cheng YangCYCheng Yang
- Pinlu CaoPCPinlu Cao
- Rusheng WangRWRusheng Wang
- Nan ZhangNZNan Zhang
- Xiaopeng FanXFXiaopeng Fan
- Yang YangYYYang Yang
- Youhong SunYSYouhong Sun
- 1 December 2015
- journal article
- Published by Elsevier in Cold Regions Science and Technology
- Vol. 120, 1-20
Abstract
No abstract availableFunding Information
- National Science Foundation of China (41276189, 41327804)
- Geological Survey of China (3R212W324424)
- Ministry of Land and Resources of China (201311041)
This publication has 32 references indexed in Scilit:
- A new leak-tight borehole casing at Dome Concordia station, Antarctica, for the SUBGLACIOR projectAnnals of Glaciology, 2014
- Replicate ice-coring system architecture: mechanical designAnnals of Glaciology, 2014
- Precision cable winch level wind for deep ice-coring systemsAnnals of Glaciology, 2014
- Drilling comparison in ‘warm ice’ and drill design comparisonAnnals of Glaciology, 2007
- Heat generated by cutting ice in deep ice-core drillingAnnals of Glaciology, 2007
- EPICA Dome C 2 drilling operations: performances, difficulties, resultsAnnals of Glaciology, 2007
- The Hans Tausen drill: design, performance, further developments and some lessons learnedAnnals of Glaciology, 2007
- Hot-water Drilling And Bore-hole Closure In Cold IceJournal of Glaciology, 1990
- Bore-Hole Survey at Dye 3, South GreenlandJournal of Glaciology, 1984
- Mechanical drill for deep coring in temperate iceJournal of Glaciology, 1974