Replenishment run time problem with machine breakdown and failure in rework
Authors:
- Yuan-Shyi Peter ChiuYCYuan-Shyi Peter Chiu
- Kuang-Ku ChenKCKuang-Ku Chen
- Chia-Kuan TingCTChia-Kuan Ting
- 1 January 2012
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 39 (1) , 1291-1297
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- An Algebraic Approach for Determining the Optimal Lot Size for EPQ Model with Rework ProcessMathematical and Computational Applications, 2010
- An integrated approach for logistic and vendor managed inventory in supply chainExpert Systems with Applications, 2010
- Production lot sizing with process deterioration and machine breakdown under inspection scheduleOmega, 2009
- Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizonExpert Systems with Applications, 2007
- Effects of random defective rate and imperfect rework process on economic production quantity modelJapan Journal of Industrial and Applied Mathematics, 2004
- Determining the optimal lot size for the finite production model with an imperfect rework process of defective itemsJournal of Information and Optimization Sciences, 2004
- Optimizing multi-stage production with constant lot size and varying number of unequal sized batchesOmega, 2001
- Bounds for production lot sizing with machine breakdownsComputers & Industrial Engineering, 1997
- A simple approximation of the EMQ model with Poisson machine failuresProduction Planning & Control, 1997
- An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production ProcessesIIE Transactions, 1991