The tool transporter movements problem in flexible manufacturing systems
Authors:
- 4 April 2008
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 46 (11) , 3059-3084
Abstract
We consider a job sequencing and tool transporter movements problem on a single flexible machine with limited tool magazine capacity. A tool transporter having limited capacity is used in transporting the tools between the machine and tool crib area. Our aim is to minimize the number of the tool transporter movements. We present several lower and upper bounds, propose a Branch-and-Bound algorithm and a Beam Search procedure, and report results from a computational experiment. We find that optimal solutions can be quickly obtained for medium-sized instances with 25 jobs and 25 tools. For large-sized problem instances, Beam Search provides high quality solutions very quickly. Finally, we address the problem of minimizing the total flow time.Keywords
This publication has 19 references indexed in Scilit:
- Minimizing total flow time on a single flexible machineInternational Journal of Flexible Manufacturing Systems, 2006
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performanceEuropean Journal of Operational Research, 2004
- Exact algorithms for the job sequencing and tool switching problemIIE Transactions, 2004
- Minimization of the Number of Tool Magazine Setups on Automated Machines: A Lagrangean Decomposition ApproachOperations Research, 2003
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performanceNaval Research Logistics (NRL), 2002
- Heuristic procedures for the parallel machine problem with tool switchesInternational Journal of Production Research, 2002
- The online tool switching problem with non-uniform tool sizeInternational Journal of Production Research, 1998
- Modelling a tool switching problem on a single NC-machineJournal of Intelligent Manufacturing, 1995
- Minimizing the number of tool switches on a flexible machineInternational Journal of Flexible Manufacturing Systems, 1994
- A Heuristic for Minimizing the Number of Tool Switches on a Flexible MachineIIE Transactions, 1988