Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
Authors:
- Ehsan MolaeeEMEhsan Molaee
- Ghasem MoslehiGMGhasem Moslehi
- Mohammad ReisiMRMohammad Reisi
- 1 December 2010
- journal article
- Published by Elsevier in Computers & Mathematics with Applications
- Vol. 60 (11) , 2909-2919
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobsEuropean Journal of Operational Research, 2009
- Multi-objective production scheduling: a surveyThe International Journal of Advanced Manufacturing Technology, 2008
- Single-machine scheduling with multiple performance measures: Minimizing job-dependent earliness and tardiness subject to the number of tardy jobsInternational Journal of Production Economics, 2007
- Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardinessEuropean Journal of Operational Research, 2007
- Multicriteria schedulingEuropean Journal of Operational Research, 2005
- Single machine scheduling with maximum earliness and number tardyComputers & Industrial Engineering, 2003
- Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobsComputers & Industrial Engineering, 2001
- One machine scheduling to minimize the maximum earliness with minimum number of tardy jobsInternational Journal of Production Economics, 1998
- Complexity of Single Machine Hierarchical Scheduling: A Survey1993
- Scheduling with Multiple Performance Measures: The One-Machine CaseManagement Science, 1986