Assessing the Duration of the Lead Appointed Party Coordination Tasks and Evaluating the Appropriate Team Composition on BIM Projects
Open Access
Abstract
This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning.Keywords
Funding Information
- Agentúra na Podporu Výskumu a Vývoja (APVV-18-0247)
This publication has 35 references indexed in Scilit:
- A Framework for Collaboration Management of BIM Model Creation in Architectural ProjectsJournal of Asian Architecture and Building Engineering, 2018
- BIM-based model for quantifying the design change time ripple effectCanadian Journal of Civil Engineering, 2017
- A cost-plus estimating framework for BIM related design and engineering servicesKSCE Journal of Civil Engineering, 2017
- Semi-automated budgeting of structures included in modern methods of construction based on 3D model2016
- Assessing the performance of the building information modeling (BIM) implementation process within a small specialty contracting enterpriseCanadian Journal of Civil Engineering, 2015
- Parallel vs. Sequential Cascading MEP Coordination Strategies: A Pharmaceutical Building Case StudyAutomation in Construction, 2014
- Comparison of Experienced and Novice BIM Coordinators in Performing Mechanical, Electrical, and Plumbing (MEP) Coordination Tasks2014
- Knowledge Discovery of Spatial Conflict Resolution Philosophies in BIM-Enabled MEP Design Coordination Using Data Mining Techniques: A Proof-of-Concept2013
- A review and outlook for a ‘Building Information Model’ (BIM): A multi-standpoint framework for technological developmentAdvanced Engineering Informatics, 2011
- Using Building Information Modeling to Improve the Mechanical, Electrical, and Plumbing Coordination Process for Buildings2008