Abstract
Stope design optimisation defines three-dimensional extraction volumes aiming to maximise cashflows, subject to geotechnical and operational constraints. Available stope layout methods are deterministic, failing to account for grade uncertainty and variability that affect stope locations and sizes, as well as value. A two-stage stochastic integer programming model for stope design optimisation is proposed, integrating grade uncertainty quantified through geostatistical simulations, level allocation, variable stope and pillar sizes for different geotechnical zones, and development costs. An application at an underground gold mine employing sublevel open stoping highlights the integration and management of grade uncertainty to define risk-resilient stope design.
Funding Information
  • Natural Sciences and Engineering Research Council (NSERC) of Canada
  • COSMO Mining Industry Consortium
  • Natural Sciences and Engineering Research Council of Canada (Discovery Grant 239019)
  • Natural Sciences and Engineering Research Council of Canada (CRD Grant CRDPJ 500414-16)
  • Natural Sciences and Engineering Research Council of Canada (CRD Grant CRDPJ 500414-16)
  • Natural Sciences and Engineering Research Council of Canada (Discovery Grant 239019)

This publication has 26 references indexed in Scilit: