Truck-excavator interaction in surface mining is often modeled as finite-source, closed-loop queuing systems. An optimization-based approach is typically used, assuming deterministic and homogeneous fleet configurations. This paper aims to contribute to the current literature by implementing a simulation-based approach, discrete-event simulation (DES), to analyze a finite-source closed-loop queuing model in a surface mining operation. The case study used was coal overburden removal activities, which operate under a first-come, first-served discipline, and loop through four phases: loading, hauling, dumping, and returning. Under the current fleet configuration, the overburden removal activity is experiencing a 19,17% production shortfall and a match factor (MF) of 0.74. An MF below 1 indicates an under-truck system, where the excavator often idles while waiting for the trucks to arrive. Three scenarios were tested using the validated DES model: (1) the as-is scenario with four trucks and one excavator, (2) variations of truck quantity, and (3) a route improvement scenario to reduce travel time. Simulation results indicate that adding five trucks yields the highest productivity (533.86 BCM/hour), utilization (92.48%), and MF (0.91), while the route improvement scenario achieved nearly comparable performance (513.94 BCM/hour, 88.86% utilization, MF = 0.88) with lower resource. Although the current case study operates under a homogeneous fleet with a single excavator, this study also tests the DES model under heterogeneous fleet configurations and a multi-server setup involving two excavators. These findings highlight the DES capability in modeling and analyzing a queuing system under a finite-source closed-loop, both for homogeneous and heterogeneous fleet configurations.Keywords
This publication has 22 references indexed in Scilit:
- Optimisation of shovel-truck haulage system in an open pit using queuing approachArabian Journal of Geosciences, 2021
- A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planningReliability Engineering & System Safety, 2020
- Bi-heuristic ant colony optimization-based approaches for traveling salesman problemSoft Computing, 2020
- Evaluation of Effect of the Excavator Cycle Duration on its ProductivityE3S Web of Conferences, 2020
- Management of heavy truck driver queuing and waiting for loading and unloading at road transport customers’ depotsSafety Science, 2019
- Simulation-based optimization of truck-shovel material handling systems in multi-pit surface minesSimulation Modelling Practice and Theory, 2019
- A Discrete-Event Simulation for a Truck-Shovel System2019
- Optimization of the fleet per shovel productivity in surface mining: Case study of Chilanga Cement, Lusaka ZambiaCogent Engineering, 2017
- Match factor for heterogeneous truck and loader fleetsInternational Journal of Mining, Reclamation and Environment, 2008
- An application of closed queueing networks theory in truck-shovel systemsInternational Journal of Surface Mining, Reclamation and Environment, 1991