Haswika Haswika
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Haswika Haswika has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Agus Mansur
Universitas Islam Indonesia
1 shared publication Danang Setiawan
1 shared publicationM. Zikra Zizo Alfieta
1 shared publicationMuhamad Imron Zamzani
Institut Teknologi Kalimantan
1 shared publication- Qurtubi Qurtubi
Universitas Islam Indonesia
1 shared publication Siti Balkis Mohamed Ibrahim
Universiti Malaysia Perlis
1 shared publication
Latest Publications
- Open Access
- 28 June 2026
- Published by Universitas Serang Raya in Jurnal Sistem dan Manajemen Industri
- Vol. 10 (1) , 16-28
Integration of fuzzy SERVQUAL and TRIZ models in service quality method
Quality service in the field of Occupational Safety and Health (OSH) training is an important factor in supporting effective learning and participant success in the certification process. This study evaluates the quality of OSH training services and proposes solutions to enhance participant satisfaction using PT FTI as a case study. Fuzzy SERVQUAL and TRIZ methodologies were combined to identify inconsistencies between participants’ expectations and perceptions across five dimensions of service quality: physical form, reliability, responsiveness, assurance, and empathy. The results showed three attributes with the highest negative gaps: lack of even-handed attention, unclear information delivery, and perceived irrelevance of training materials. Based on TRIZ principles, the study proposes innovative solutions, such as hybrid training (online and offline), increased information transparency, separation of knowledge and skills evaluation, and rearranging materials to make them more contextual. The combined use of fuzzy SERVQUAL and TRIZ offers a systematic and effective strategy for analyzing and improving training quality.
- 28 June 2026
- Published by Universitas Serang Raya in Jurnal Sistem dan Manajemen Industri
- Vol. 10 (1) , 16-28
Open AccessIntegration of fuzzy SERVQUAL and TRIZ models in service quality method
Quality service in the field of Occupational Safety and Health (OSH) training is an important factor in supporting effective learning and participant success in the certification process. This study evaluates the quality of OSH training services and proposes solutions to enhance participant satisfaction using PT FTI as a case study. Fuzzy SERVQUAL and TRIZ methodologies were combined to identify inconsistencies between participants’ expectations and perceptions across five dimensions of service quality: physical form, reliability, responsiveness, assurance, and empathy. The results showed three attributes with the highest negative gaps: lack of even-handed attention, unclear information delivery, and perceived irrelevance of training materials. Based on TRIZ principles, the study proposes innovative solutions, such as hybrid training (online and offline), increased information transparency, separation of knowledge and skills evaluation, and rearranging materials to make them more contextual. The combined use of fuzzy SERVQUAL and TRIZ offers a systematic and effective strategy for analyzing and improving training quality.
- Open Access
- 25 December 2025
- Published by Universitas Serang Raya in Jurnal Sistem dan Manajemen Industri
- Vol. 9 (2) , 125-134
Discrete-event simulation of truck–excavator systems in surface mining using a finite-source closed-loop queuing model
Truck-excavator interaction in surface mining is often modeled as finite-source, closed-loop queuing systems. An optimization-based approach is typically used, assuming deterministic and homogeneous fleet configurations. This paper aims to contribute to the current literature by implementing a simulation-based approach, discrete-event simulation (DES), to analyze a finite-source closed-loop queuing model in a surface mining operation. The case study used was coal overburden removal activities, which operate under a first-come, first-served discipline, and loop through four phases: loading, hauling, dumping, and returning. Under the current fleet configuration, the overburden removal activity is experiencing a 19,17% production shortfall and a match factor (MF) of 0.74. An MF below 1 indicates an under-truck system, where the excavator often idles while waiting for the trucks to arrive. Three scenarios were tested using the validated DES model: (1) the as-is scenario with four trucks and one excavator, (2) variations of truck quantity, and (3) a route improvement scenario to reduce travel time. Simulation results indicate that adding five trucks yields the highest productivity (533.86 BCM/hour), utilization (92.48%), and MF (0.91), while the route improvement scenario achieved nearly comparable performance (513.94 BCM/hour, 88.86% utilization, MF = 0.88) with lower resource. Although the current case study operates under a homogeneous fleet with a single excavator, this study also tests the DES model under heterogeneous fleet configurations and a multi-server setup involving two excavators. These findings highlight the DES capability in modeling and analyzing a queuing system under a finite-source closed-loop, both for homogeneous and heterogeneous fleet configurations.
- 25 December 2025
- Published by Universitas Serang Raya in Jurnal Sistem dan Manajemen Industri
- Vol. 9 (2) , 125-134
Open AccessDiscrete-event simulation of truck–excavator systems in surface mining using a finite-source closed-loop queuing model
Truck-excavator interaction in surface mining is often modeled as finite-source, closed-loop queuing systems. An optimization-based approach is typically used, assuming deterministic and homogeneous fleet configurations. This paper aims to contribute to the current literature by implementing a simulation-based approach, discrete-event simulation (DES), to analyze a finite-source closed-loop queuing model in a surface mining operation. The case study used was coal overburden removal activities, which operate under a first-come, first-served discipline, and loop through four phases: loading, hauling, dumping, and returning. Under the current fleet configuration, the overburden removal activity is experiencing a 19,17% production shortfall and a match factor (MF) of 0.74. An MF below 1 indicates an under-truck system, where the excavator often idles while waiting for the trucks to arrive. Three scenarios were tested using the validated DES model: (1) the as-is scenario with four trucks and one excavator, (2) variations of truck quantity, and (3) a route improvement scenario to reduce travel time. Simulation results indicate that adding five trucks yields the highest productivity (533.86 BCM/hour), utilization (92.48%), and MF (0.91), while the route improvement scenario achieved nearly comparable performance (513.94 BCM/hour, 88.86% utilization, MF = 0.88) with lower resource. Although the current case study operates under a homogeneous fleet with a single excavator, this study also tests the DES model under heterogeneous fleet configurations and a multi-server setup involving two excavators. These findings highlight the DES capability in modeling and analyzing a queuing system under a finite-source closed-loop, both for homogeneous and heterogeneous fleet configurations.