On the robustness of joint production and maintenance scheduling in presence of uncertainties
- 11 February 2017
- journal article
- research article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 30 (4) , 1515-1530
Abstract
No abstract availableKeywords
This publication has 87 references indexed in Scilit:
- A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planningInternational Journal of Production Research, 2013
- A joint production scheduling approach considering multiple resources and preventive maintenance tasksInternational Journal of Production Research, 2012
- A genetic algorithm for scheduling dual flow shopsExpert Systems with Applications, 2012
- Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristicsComputers & Operations Research, 2011
- Analysis of robustness in proactive scheduling: A graphical approachComputers & Industrial Engineering, 2010
- Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streamingJournal of Materials Processing Technology, 2009
- Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraintsComputers & Industrial Engineering, 2004
- Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environmentInternational Journal of Production Research, 1999
- Predictable scheduling of a single machine subject to breakdownsInternational Journal of Computer Integrated Manufacturing, 1999
- Robust deterministic scheduling in stochastic environments: The method of capacity hedge pointsInternational Journal of Production Research, 1997