Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis
- 1 November 2012
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 138 (11) , 1270-1280
Abstract
Perhaps the greatest challenge facing the cost-estimating community over the next decade is the loss of knowledge and experience of highly experienced estimators because a high percentage of them are retiring, and a shortage of qualified cost estimators is evident in the construction industry. This study identified 23 core estimating competencies classified into skills, knowledge, and personal attributes and also quantified the degree by which new estimators lack each competency. In total, 228 completed questionnaires were collected through the Construction Industry Institute member companies, through the Association for the Advancement of Cost Engineering International (AACE-I) and the American Society of Professional Estimators (ASPE) workshops. An estimating core-competency criticality matrix was developed to prioritize competencies on the basis of the combined effects of the level of importance of each competency and its associated gap between the ideal and actual level of competency. The fact...Keywords
This publication has 4 references indexed in Scilit:
- Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate RegressionJournal of Construction Engineering and Management, 2003
- A survey of current cost estimating practices in the UKConstruction Management and Economics, 2000
- Analysis of factors influencing project cost estimating practiceConstruction Management and Economics, 2000
- Cost‐Estimating PrinciplesJournal of Construction Engineering and Management, 1989