DJDavid Hyung Seok Jeong

David Hyung Seok Jeong

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


David Hyung Seok Jeong has a total of 22 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis

    by Anwar Alroomi, David Hyung Seok Jeong, Garold D. Oberlender

    Perhaps the greatest challenge facing the cost-estimating community over the next decade is the loss of knowledge and experience of highly experienced estimators because a high percentage of them are retiring, and a shortage of qualified cost estimators is evident in the construction industry. This study identified 23 core estimating competencies classified into skills, knowledge, and personal attributes and also quantified the degree by which new estimators lack each competency. In total, 228 completed questionnaires were collected through the Construction Industry Institute member companies, through the Association for the Advancement of Cost Engineering International (AACE-I) and the American Society of Professional Estimators (ASPE) workshops. An estimating core-competency criticality matrix was developed to prioritize competencies on the basis of the combined effects of the level of importance of each competency and its associated gap between the ideal and actual level of competency. The fact...


  • Historical Data Driven and Component Based Prediction Models for Predicting Preliminary Engineering Costs of Roadway Projects

    by Asregedew Woldesenbet, David Hyung Seok Jeong

    Preliminary engineering cost is one of the essential components of a roadway project which accounts for on average 7% - 20% of an overall project cost. A reliable estimate of preliminary engineering (PE) cost is critical for highway agencies for allocating budgets, completing projects on time, and reducing public inconvenience. However, many highway agencies do not have a prediction system or mechanism to estimate their PE costs and usually utilize engineers' judgment in estimating PE costs. In addition, these agencies outsource approximately 50% of their design works to consulting firms due to insufficient in-house design capabilities and typically utilize excel-based fee proposal spreadsheets for negotiating the design fee with the consulting firm solely based on project type. This study investigates critical factors that should be taken into consideration to develop a reliable PE cost prediction model based on ten years of roadway project data collected from the Oklahoma Department of Transportation (ODOT) engineering division. This study conducts a factor analysis of a covariance and correlation matrix to investigate the significance and correlation of critical factors affecting PE cost. Then, the study presents data driven and component based PE cost prediction models of PE costs by utilizing a knowledge discovery in database (data mining) techniques. Based on the study, critical factors affecting PE costs were classified into five major categories; project scope, geographical attributes, design attributes, environmental attributes, and external factors. It was identified that roadway length, location, and highway type were highly correlated with PE costs. For this paper, a combination of knowledge discovery in database methods (regression models, and decision tree models) are developed and compared to obtain the optimum PE cost model as a function of a) engineering hours required per number of sheets, b) number of sheets and c) cost per engineering hours for the various plan development tasks. A comparison of these models resulted in decision tree model to be the best model for predicting PE costs. The results of this study will greatly influence how efficiently and economically roadway projects are planned, executed, managed, and gives more accurate accountability of project developments during the early phases of a roadway project. In addition, the model will not only allow ODOT to be equipped with a streamlined procedure for estimating PE costs but also facilitate consistent practices and structured format of PE cost estimating.


  • Impact of Unit Time Value on Contractors' Optimal Bidding Strategies in Price-Time Bi-Parameter Bidding

    by Saeed Abdollahipour, David Hyung Seok Jeong

    State Highway Agencies have started to utilize price-time bi-parameter bidding (A+B bidding) in order to accelerate projects by incorporating construction time in the bidding competition. Since this method is based on the principle of cost reimbursement to the contractor for contract time reduction, the owner has to calculate unit time value (UTV) before letting projects. Unlike most studies performed in this area that have focused on optimizing the incentive/disincentive (I/D) rates with respect to road user costs and added construction cost, this study investigates how different UTVs can impact the competitiveness of contractors in A+B bidding. By evaluating the optimal strategies of multiple contractors participating in an A+B bidding competition, new criteria are developed to determine the amount of UTV and I/D. Finally, the paper concludes with some discussions regarding a set of criteria that need to be considered in both A+B with I/D and A+B without I/D contracts. This study shows how the owner would be able to adjust the UTV and I/D rates for A+B bidding projects by estimating the price-time curves of contractors. It would also enable contractors to adopt a more competitive strategy by estimating their competitors' optimal bidding strategies.

  • Effective Methods and Learning Environment for Retaining Cost Estimating Knowledge and Skills

    by Anwar Alroomi, David Hyung Seok Jeong

    Recent studies have shown that 80% of the baby boomer generation who have critical "know-how" and "how-to" knowledge and skills will be retiring within the next 10 years. Also the American Society of Civil Engineers (ASCE) predicts a significant shortfall of engineers in the next decades. In many companies, the retirement of the senior employees basically translates into the retirement of their years of experience and knowledge as most companies do not have well planned strategies and methods to retain the knowledge and skills of their retiring employees. Decades of downsizing and outsourcing management practices also have exacerbated this problem. There have been rich research efforts outside the construction industry on the importance of knowledge management (KM) which emphasizes the collection and managed sharing of knowledge within the organization. Furthermore, learning organization concepts as an evolved framework from KM have been established as dynamic and effective environments for proactively capturing, sharing, disseminating, and retaining knowledge and skills. This study investigates the effectiveness of the methods used to retain cost estimators' knowledge and skills and evaluates the significant effect of the organizational learning environment in promoting the continuity of learning, and knowledge and skills development. The Structural Equation Modeling method (SEM) was employed to investigate and assess the causal relation between the learning environment provided and the retention methods used. The findings of this study will significantly improve engineering and construction companies' practices in retaining cost estimators' knowledge and skills, and help companies adapt a healthy learning environment that can facilitate learning and sustain knowledge transfer.


  • Performance Assessment of On-Grade Horizontal Directional Drilling

    by Saeed Abdollahipour, David Hyung Seok Jeong, Reeti R. Burman, Floyd Gunsaulis

    Although horizontal directional drilling (HDD) has been widely accepted and used for installing gas lines, waterlines, and telecommunication cables, its applications to gravity-flow sewer lines have been limited. One primary reason is the difficulty with maintaining critical grades essential for gravity-flow sewer systems when using the conventional HDD tracking methods. Recently, advancements made in tracking systems, electronics, and operational techniques have made this HDD technology a technically feasible and an economically attractive method for installing on-grade underground pipes in many situations. This paper presents a newly developed HDD technology in terms of its technical capabilities and economic feasibilities compared with the traditional open-cut method on the basis of two real-scale case studies. Installation errors are quantitatively analyzed and discussed, and a general set of boundary site conditions for the application of this new technology is also discussed. The detailed analysis of the two case studies demonstrates that the on-grade HDD method could be a very attractive alternative construction method for gravity-flow sewer pipelines when some favorable site conditions are available.


  • Multi-layered assessment of emerging internet based business for construction product information

    by Ung-Kyun Lee, David Hyung Seok Jeong, Ki-Beom Ju, Choonghan Han


  • Dynamic Deterioration Models for Sewer Pipe Network

    by Syadaruddin Syachrani, Hyung Seok (David) Jeong, Colin S. Chung

    One of the key components in successfully implementing asset-management programs is to have accurate and reliable deterioration models for the assets because the deterioration models are the core computational basis for predicting and prioritizing future maintenance, rehabilitation, or replacement activities of the assets. Many large and advanced utilities have put extensive efforts into collecting condition assessment data of their assets since the late 1990s. This change has posed new challenges in developing deterioration models. This paper presents a framework for developing dynamic deterioration models that can avoid the uniform treatment of the entire sewer pipe network by using the clustering and filtering process on the basis of location-related attributes and operational conditions. The dynamic deterioration models are dynamic because they are dual models for a single sewer network; one model is for individual prediction and the other for group prediction. The performance and benefits of the dynamic deterioration models are discussed with the conventional deterioration models developed in this study for comparison purposes. More realistic and reliable decisions can be made by using the dynamic deterioration models, which can translate into accountable short-term and long-term funding strategies for sustainable infrastructure asset management.


  • Linear Scheduling Model with Varying Production Rates

    by Gregory A. Duffy, Garold D. Oberlender, David Hyung Seok Jeong

    Activity production rates drive the development and accuracy of linear schedules. The nature of linear projects dictates an assortment of variables that affect each activity’s production rate. The purpose of this research was to expand the capabilities of linear scheduling to account for variance in production rates when and where the variance occurs and to enhance the visual capabilities of linear scheduling. This new linear scheduling model, a linear scheduling model with varying production rates (LSMVPR ), has two objectives. The first is to outline a framework to apply changes in production rates when and where they occur along the horizontal alignment of the project. The second objective is to illustrate the difficulty or ease of construction through the time-location chart. This research showed that the changes in production rates because of time and location can be modeled for use in predicting future construction projects. Using the concept of working windows, LSMVPR allows the scheduler to develop schedule durations on the basis of minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. The graphical format allows the construction team to visualize the obstacles in the project when and where they occur by using a new feature called the activity performance index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.


  • Using Real Age As a Better Indicator of Predicting Asset Remaining Life

    by Syadaruddin Syachrani, David Hyung Seok Jeong, Colin S. Chung

    In water and wastewater asset management, the Environmental Protection Agency has long emphasized the significant role of risk assessment to measure the criticality of an asset. Critical assets are defined as assets with a high probability of failure (old, poor condition, etc.) and high consequences if they do fail (major expense, system failure, safety concerns, etc.). In practice, the consequences of failure are typically estimated by experts through the Delphi method. However, the estimation of the probability of failure has been a challenging problem as it requires the analysis of the utility owned data such as condition assessment data, and repair and replacement records. The most common predictor of estimating the probability of failure for sewer pipes is by determining the remaining life. However, using the calendar age of a sewer pipe completely ignores different aging patterns of pipes under different operational and environmental conditions. This paper introduces a new method using the "real age" of a pipe in estimating the remaining life. Unlike calendar age, real age represents the adjusted age given the unique location and current operational conditions (grease condition, root problem, sludge problem, etc.). Depending on unique deterioration patterns of an individual pipe, the real age could be higher or lower than its calendar age. A variable selection process prior to a model development is conducted to ensure that the final model is lean but well performed. A case study using actual sewer pipe data collected from a sewer utility organization is discussed to show the differences of the estimated remaining life based on calendar age and real age.

  • Open Access

    Asset Management Assessment Model for State Departments of Transportation

    by Steven R. Cooksey, “David” Hyung Seok Jeong, Myung Jin Chae

    Transportation asset management (AM) research has yielded a well-accepted AM framework for state departments of transportation (DOTs) to model. However, no studies have developed a model to measure the level of AM implementation for a benchmarking purpose. This is accomplished through the deliverable of this study: the AM Assessment Model [(AM)2]. The model was developed through the identification of the most critical indicators that point to successful practices for an ideal AM system. These indicators are weighted according to their level of importance using the analytic hierarchy process (AHP). While identifying the indicators, a new indicator, AM Culture, was identified and recognized as significant by some of the leading AM experts in the United States. The (AM)2 can be used as a quick diagnostic tool for agencies to determine where they stand in regard to AM practice, and it can assist them in determining how to focus their resources to improve AM within their agencies.