Arch First and Beam Later Technology: An Accelerated and Safe Construction for Tied Arch Bridges
- 23 February 2024
- journal article
- research article
- Published by Taylor & Francis in Structural Engineering International
- Vol. 35 (2) , 162-170
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51878250)
This publication has 4 references indexed in Scilit:
- Constructional Safety-Based Cost Optimization for the Buckling–Anchorage System of Cantilever Casting Concrete Arch BridgesJournal of Bridge Engineering, 2022
- Innovative Launch of Long-Span Arch Bridge Across Waterway Using Special Hydraulic CrawlerPractice Periodical on Structural Design and Construction, 2020
- Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch BridgeJournal of Construction Engineering and Management, 2017
- Horizontal Rotation via Floatation as an Accelerated Bridge Construction for Long-Span Footbridge Erection: Case StudyJournal of Bridge Engineering, 2015