Aimin Yuan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Aimin Yuan has a total of 44 co-authors. Here are the top co-authors by number of shared publications:
- Hang Dai
Lecturer, college of civil engineering and transportaion, Hohai university, Xikang Road 1#, Nanjing, Jiangsu P.R. China 210098
2 shared publications Shoulong Qian
Shanghai Tonghao Civil Engineering Consulting Co. Ltd
2 shared publicationsXinge Miao
Dept. of Civil and Transportation Engineering, Hohai University, Nanjing, China
2 shared publications- Xinge Miao
Hohai Univ
2 shared publications Yu He
Postgraduate Student, Dept. of Civil and Transportation Engineering, Hohai Univ., Nanjing 210098, China
2 shared publicationsBingnan Li
Architectural Design and Research Institute of Southeast University, Nanjing, People’s Republic of China
1 shared publication
Latest Publications
- 18 February 2026
- Published by Wiley in Structural Concrete
- Vol. 27 (4) , 6484-6504
Experimental investigation on fractal characterization of roughness and bond‐shear behavior at concrete interface treated by prefabricated rubber formwork
This study compared the interfacial performance and failure modes of prefabricated rubber formwork and traditional chiseling technique through slant shear test and splitting tensile test to reveal the governing mechanism of interface roughness on new and old concrete bond shear behavior. The fractal dimension value obtained via 3D laser scanning technology was used to quantitatively characterize interface roughness. This study conducted an in‐depth analysis of fractal dimension correlation with cohesion and friction coefficient, and established the fractal dimension‐interface shear strength quantitative model. The results demonstrate that the fractal dimension can effectively quantify interface roughness and exhibit the quadratic polynomial positive correlation with sand‐filling depth ( R 2 = 0.969); compared to the traditional chiseling technique, the prefabricated rubber formwork significantly enhances interface shear strength, splitting tensile strength, and ductility due to its uniform texturing while inducing negligible substrate damage; the fractal dimension exhibits the linear positive correlation with cohesion and friction coefficient ( R 2 = 0.887, 0.908). It is suggested that the rough surface with the sand‐filling depth H s > 1.5 mm (the fractal dimension D > 2.1296) should be preferred in the engineering practice to ensure the interface mechanical properties meet the existing code requirements; within the theoretical framework of the Mohr‐Coulomb criterion, the quantitative relationship model between fractal dimension and interface shear strength was established, and the theoretical values demonstrated close agreement with experimental results (errors < 5%), thus providing the theoretical basis for calculating the shear capacity of new and old concrete interface. Consequently, the prefabricated rubber formwork demonstrates significant advantages in enhancing the mechanical performance of new and old concrete interfaces. Its characteristics, such as prefabrication capability, reusability, construction efficiency, and cost‐effectiveness, endow it with broad application prospects in prefabricated structures.
- 18 February 2026
- Published by Wiley in Structural Concrete
- Vol. 27 (4) , 6484-6504
Experimental investigation on fractal characterization of roughness and bond‐shear behavior at concrete interface treated by prefabricated rubber formwork
This study compared the interfacial performance and failure modes of prefabricated rubber formwork and traditional chiseling technique through slant shear test and splitting tensile test to reveal the governing mechanism of interface roughness on new and old concrete bond shear behavior. The fractal dimension value obtained via 3D laser scanning technology was used to quantitatively characterize interface roughness. This study conducted an in‐depth analysis of fractal dimension correlation with cohesion and friction coefficient, and established the fractal dimension‐interface shear strength quantitative model. The results demonstrate that the fractal dimension can effectively quantify interface roughness and exhibit the quadratic polynomial positive correlation with sand‐filling depth ( R 2 = 0.969); compared to the traditional chiseling technique, the prefabricated rubber formwork significantly enhances interface shear strength, splitting tensile strength, and ductility due to its uniform texturing while inducing negligible substrate damage; the fractal dimension exhibits the linear positive correlation with cohesion and friction coefficient ( R 2 = 0.887, 0.908). It is suggested that the rough surface with the sand‐filling depth H s > 1.5 mm (the fractal dimension D > 2.1296) should be preferred in the engineering practice to ensure the interface mechanical properties meet the existing code requirements; within the theoretical framework of the Mohr‐Coulomb criterion, the quantitative relationship model between fractal dimension and interface shear strength was established, and the theoretical values demonstrated close agreement with experimental results (errors < 5%), thus providing the theoretical basis for calculating the shear capacity of new and old concrete interface. Consequently, the prefabricated rubber formwork demonstrates significant advantages in enhancing the mechanical performance of new and old concrete interfaces. Its characteristics, such as prefabrication capability, reusability, construction efficiency, and cost‐effectiveness, endow it with broad application prospects in prefabricated structures.
- 23 February 2024
- Published by Taylor & Francis in Structural Engineering International
- Vol. 35 (2) , 162-170
Arch First and Beam Later Technology: An Accelerated and Safe Construction for Tied Arch Bridges
- 23 February 2024
- Published by Taylor & Francis in Structural Engineering International
- Vol. 35 (2) , 162-170
Arch First and Beam Later Technology: An Accelerated and Safe Construction for Tied Arch Bridges
- Open Access
- 31 July 2023
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (10) , 4392-4405
Numerical Investigation of Cracks at Girder Ends of Prefabricated Post-Tensioned Prestressed Concrete I-Girders
- 31 July 2023
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (10) , 4392-4405
Open AccessNumerical Investigation of Cracks at Girder Ends of Prefabricated Post-Tensioned Prestressed Concrete I-Girders
- 1 February 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 27 (2) , 04021109
Strand Debonding for Prestressed Concrete Girders to Control End Horizontal Web Cracks Based on a Modified G-S Model
Horizontal web cracks are frequently observed at the ends of pretensioned concrete members (I girders or Bulb Tee girders) at the time of prestress transfer. Using a modified Gergely–Sozen (mG-S) model to calculate the spalling forces of prestressed concrete girder ends was illustrated step by step. A new design procedure based on the mG-S model was proposed with the aim to control horizontal web cracks by debonding a number of strands. Three different criteria were introduced to determine the suitable debonding ratios and debonding patterns of the girder ends. Prestressed Standard Wisconsin Wide-Flange girders (WF54) and Standard Nebraska I girders (NU1100) were chosen for case studies, in which several debonding ratios and debonding patterns were analyzed to check the reasonability and effectiveness of the current limits in the standards. The analysis results obtained from the mG-S model were validated by the finite-element analysis (FEA) method, which proved that 25% debonding can greatly reduce the concrete tension strains in the web but cannot eliminate the web crack, and it can satisfy the code requirements on the vertical reinforcement stresses and crack width. Four percent of the total prestressing force is enough to be used to design the vertical reinforcement at the girder ends. The recommendations on debonding patterns are also presented.
- 1 February 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 27 (2) , 04021109
Strand Debonding for Prestressed Concrete Girders to Control End Horizontal Web Cracks Based on a Modified G-S Model
Horizontal web cracks are frequently observed at the ends of pretensioned concrete members (I girders or Bulb Tee girders) at the time of prestress transfer. Using a modified Gergely–Sozen (mG-S) model to calculate the spalling forces of prestressed concrete girder ends was illustrated step by step. A new design procedure based on the mG-S model was proposed with the aim to control horizontal web cracks by debonding a number of strands. Three different criteria were introduced to determine the suitable debonding ratios and debonding patterns of the girder ends. Prestressed Standard Wisconsin Wide-Flange girders (WF54) and Standard Nebraska I girders (NU1100) were chosen for case studies, in which several debonding ratios and debonding patterns were analyzed to check the reasonability and effectiveness of the current limits in the standards. The analysis results obtained from the mG-S model were validated by the finite-element analysis (FEA) method, which proved that 25% debonding can greatly reduce the concrete tension strains in the web but cannot eliminate the web crack, and it can satisfy the code requirements on the vertical reinforcement stresses and crack width. Four percent of the total prestressing force is enough to be used to design the vertical reinforcement at the girder ends. The recommendations on debonding patterns are also presented.
- 24 May 2021
- Published by Taylor & Francis in Structural Engineering International
- Vol. 32 (4) , 484-490
Replacement of the Fire-Damaged Long Suspenders of the Runyang Suspension Bridge
Suspenders are key components of suspension bridges and are prone to corrosion, fatigue and deck fires, resulting in damage or fracture. It is necessary to study the emergency replacement technology for suspenders. In this study, a long suspender replacement device was designed for the Runyang Suspension Bridge after studying the configuration of a fire-damaged suspender anchorage structure. The proposed suspender replacement technology removed the damaged suspender with the pin shaft under zero stress instead of the traditional method with the suspender under zero stress. A finite element (FE) model was established to simulate the behavior of the suspension bridge during the suspender replacement process. The change rules for typical and key parameters, such as the temporary suspender force, replaced suspender force, and vertical displacement of the main cables and stiffening girders, are presented. Furthermore, the force monitoring data on the temporary and replaced suspender were recorded during the entire construction process without interrupting traffic. The results show that the changing trend between the FE analysis results and the measured results is consistent, and the method is safe and of little influence to the bridge.
- 24 May 2021
- Published by Taylor & Francis in Structural Engineering International
- Vol. 32 (4) , 484-490
Replacement of the Fire-Damaged Long Suspenders of the Runyang Suspension Bridge
Suspenders are key components of suspension bridges and are prone to corrosion, fatigue and deck fires, resulting in damage or fracture. It is necessary to study the emergency replacement technology for suspenders. In this study, a long suspender replacement device was designed for the Runyang Suspension Bridge after studying the configuration of a fire-damaged suspender anchorage structure. The proposed suspender replacement technology removed the damaged suspender with the pin shaft under zero stress instead of the traditional method with the suspender under zero stress. A finite element (FE) model was established to simulate the behavior of the suspension bridge during the suspender replacement process. The change rules for typical and key parameters, such as the temporary suspender force, replaced suspender force, and vertical displacement of the main cables and stiffening girders, are presented. Furthermore, the force monitoring data on the temporary and replaced suspender were recorded during the entire construction process without interrupting traffic. The results show that the changing trend between the FE analysis results and the measured results is consistent, and the method is safe and of little influence to the bridge.
- Open Access
- 1 September 2019
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 304 (5) , 052043
Calculation methods for reinforcement at the edge of epoxy joints of precast segmental box girders based on STM
To study the failure mechanism caused by diagonal crack near the joints in precast segmental box girder, a finite element model (FEM) of a standard segment of precast segmental box girder under pure bending was established. The stress field distribution for a selected segment was obtained by numerical analysis. Topological optimisation was adopted to determine the load path through the standard segment. Then, a strut-and-tie model (STM) for the standard segment under pure bending was established and verified, and calculation methods and formulae were provided for determining the reinforcement requirement at the edge of epoxy joints and at the middle of the web of the segments. Finally, a standard segment from the Fourth Nanjing Yangtze River Bridge was taken as an example to check the requirement for vertical reinforcement at the edge of the joint and horizontal reinforcement in the web, using the proposed STM. The results show that, using the STM for a standard segment when designing the reinforcement required at the edge of the joints and at the middle of the web, is acceptable, which further validates the feasibility of the proposed method.
- 1 September 2019
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 304 (5) , 052043
Open AccessCalculation methods for reinforcement at the edge of epoxy joints of precast segmental box girders based on STM
To study the failure mechanism caused by diagonal crack near the joints in precast segmental box girder, a finite element model (FEM) of a standard segment of precast segmental box girder under pure bending was established. The stress field distribution for a selected segment was obtained by numerical analysis. Topological optimisation was adopted to determine the load path through the standard segment. Then, a strut-and-tie model (STM) for the standard segment under pure bending was established and verified, and calculation methods and formulae were provided for determining the reinforcement requirement at the edge of epoxy joints and at the middle of the web of the segments. Finally, a standard segment from the Fourth Nanjing Yangtze River Bridge was taken as an example to check the requirement for vertical reinforcement at the edge of the joint and horizontal reinforcement in the web, using the proposed STM. The results show that, using the STM for a standard segment when designing the reinforcement required at the edge of the joints and at the middle of the web, is acceptable, which further validates the feasibility of the proposed method.
- 1 March 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 24 (3)
Model Derivation and Validation of Spalling-Force Calculations for Prestressed Concrete Bridge Girder Ends Based on a Modified G-S Model
Horizontal cracks occur at the web of prestressed bridge girder ends during prestress release due to the spalling force, which is produced by the transfer of the prestressing force to the concrete. To avoid using a trial-and-error method to determine the maximum moment section and unify the methods to determine the arm length of the maximum moment in the conventional Gergely-Sozen (G-S) model, a modified G-S model is proposed to calculate the spalling force in a pretensioned anchorage zone. A compression dispersion model (CDM) is developed and formulated for the pretensioned anchorage zone, and the extreme edge of isostatic lines is visualized mathematically with its geometric and physical boundary conditions, which can be used to accurately predict the arm length and spalling force of the horizontal moment at any horizontal section. Based on experimental and field observations and previous finite-element method (FEM) analysis results, the junction section between the bottom flange and the web, instead of the maximum moment section, is recommended as a critical control section to calculate the spalling force in the web. Compared with the numerical and experimental results, a good agreement was obtained confirming that the modified G-S model method not only can predict the arm length of the horizontal moment, but can also evaluate the magnitude of the spalling force. A case study illustrates how to apply the proposed method to calculate the spalling force at the junction section, and the results explain why horizontal cracks often occur at the junction section.
- 1 March 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 24 (3)
Model Derivation and Validation of Spalling-Force Calculations for Prestressed Concrete Bridge Girder Ends Based on a Modified G-S Model
Horizontal cracks occur at the web of prestressed bridge girder ends during prestress release due to the spalling force, which is produced by the transfer of the prestressing force to the concrete. To avoid using a trial-and-error method to determine the maximum moment section and unify the methods to determine the arm length of the maximum moment in the conventional Gergely-Sozen (G-S) model, a modified G-S model is proposed to calculate the spalling force in a pretensioned anchorage zone. A compression dispersion model (CDM) is developed and formulated for the pretensioned anchorage zone, and the extreme edge of isostatic lines is visualized mathematically with its geometric and physical boundary conditions, which can be used to accurately predict the arm length and spalling force of the horizontal moment at any horizontal section. Based on experimental and field observations and previous finite-element method (FEM) analysis results, the junction section between the bottom flange and the web, instead of the maximum moment section, is recommended as a critical control section to calculate the spalling force in the web. Compared with the numerical and experimental results, a good agreement was obtained confirming that the modified G-S model method not only can predict the arm length of the horizontal moment, but can also evaluate the magnitude of the spalling force. A case study illustrates how to apply the proposed method to calculate the spalling force at the junction section, and the results explain why horizontal cracks often occur at the junction section.
- 14 August 2018
- Published by Taylor & Francis in Structural Engineering International
- Vol. 28 (4) , 550-555
Taiping North Road Footbridge—Innovative Folding Girder and Cable Support System
To eliminate safety hazards and improve the traffic flow resulting from heavy vehicular and pedestrian traffic due to the demolition of a footbridge, a replacement footbridge was designed that uses lightweight folding girders, a multi-mast cable support system and multiple pylons. This new footbridge is regarded as an elegant solution due to its commendable constructability, sufficient design redundancy and cost competiveness. A finite-element method (FEM) model was established to determine the static and dynamic characteristics of the new footbridge. The natural frequencies and corresponding mode shapes of the footbridge were obtained, and comfort levels were evaluated according to the EN03 specification.
- 14 August 2018
- Published by Taylor & Francis in Structural Engineering International
- Vol. 28 (4) , 550-555
Taiping North Road Footbridge—Innovative Folding Girder and Cable Support System
To eliminate safety hazards and improve the traffic flow resulting from heavy vehicular and pedestrian traffic due to the demolition of a footbridge, a replacement footbridge was designed that uses lightweight folding girders, a multi-mast cable support system and multiple pylons. This new footbridge is regarded as an elegant solution due to its commendable constructability, sufficient design redundancy and cost competiveness. A finite-element method (FEM) model was established to determine the static and dynamic characteristics of the new footbridge. The natural frequencies and corresponding mode shapes of the footbridge were obtained, and comfort levels were evaluated according to the EN03 specification.
- Open Access
- 14 June 2018
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (11) , 4422-4429
Behavior and Efficiency of Corrosion Damaged Half-bottle Shaped Struts
- 14 June 2018
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (11) , 4422-4429
Open AccessBehavior and Efficiency of Corrosion Damaged Half-bottle Shaped Struts