Abstract
Drilling extended-reach horizontal wells (ERHWs) have become a viable option for field development because these wells bring additional reserves on line which may not be accessible with conventional well designs. Tubular design for ERHWs must be compatible with the intended well objectives, target location, wellbore trajectory in order to minimize the downhole dynamic events such as torque and drag, buckling and vibrations. Presently, the dynamic models used for calculating expected axial load and torque transfers along tubulars in ERHWs consider only the effect of the contact loads and frictional forces generated from torque, drag and buckling events. The expected axial loads and torque calculated during tubular design process are been underestimated using present dynamic models. However, the contact loads and frictional forces generated by lateral and torsional vibration events are critical to the tubular design for ERHWs and should not be ignored. This study in this paper incorporates torque and drag, buckling and vibration models into the Newton second law of motion/instability in order to derive an integrated dynamic equation for torque and axial load distribution along tubulars in ERHWs. This study also uses theories of unbalanced centripetal force and fluid added-mass to quantify the magnitude of the normal contact load generated during lateral vibrations of a near-straight tubular section in an ERHW. The developed equations can be used for calculating axial load and torque transfer along drilling and completion tubulars depending on assumptions of hydraulic effects, buckling and inertia terms. Results show that the occurrence of downhole dynamic events contributes a relatively higher percentage to torque transfer than they do to axial load transfer. Also, when all the downhole dynamic events occur together and the critical buckling loads have not been reached, torque and drag events contributes the major portion of the axial load transfer followed by lateral vibrations. The dynamic equations developed in this paper are validated using data from one of the world longest ERHWs. This study will lead to better tubular design through the minimization of failures, non-productive times, and ultimately reduced total drilling and completion costs.