The agglomeration production of Ural Steel JSC includes a charge preparation site and an agglomeration site. The raw material for the production of agglomerate is the charge, which is prepared at the charge preparation site using a four-roll crusher for crushing coke. When using existing equipment in an agglomeration shop, a significant disadvantage in its operation is the frequent failure of individual components due to a long service life and a long service life. As a result, device downtime occurs, as a rule, due to the low reliability of the current electric drive. In order to reduce the time of equipment repairs, which arise primarily due to the wear of outdated equipment, it is proposed to modernize the four-roll crusher, which consists in replacing the existing multi-element drive (electric motor, clutch and gearbox) with a coaxial gear motor, which is an appropriate solution for mechanisms operating in a repeated short-term mode. Additional capital expenditures required to modernize the drive of the crushers include the purchase and installation of gear motors, gear couplings and the manufacture of frames for gear motors. The total capital costs for the purchase of equipment, spare parts, logistics and the cost of dismantling old equipment and installing new equipment do not exceed 4.5 million rubles. As a result of this modernization: the cost of production decreased by 0.13 %; profit from sales increased by 0.42 %; the payback period of this event is less than 6 months. The project is efficient, pays off quickly and can be recommended for implementation not only at Ural Steel JSC, but also at other metallurgical enterprises in the industry.