A. V. Nefedov
Research Subjects
A. V. Nefedov has a total of 26 co-authors. Here are the top co-authors by number of shared publications:
- N. A. Chichenev
National University of Science and Technology “MISIS, Moscow, Russia
7 shared publications - E. G. Novikov
Novotroitsk Branch, National University of Science and Technology MISiS, Novotroitsk, Russia
2 shared publications - I. I. Basyrov
NUST MISIS, Moscow, Russian Federation
2 shared publications I. V. Kotov
2 shared publications- O. N. Chicheneva
Natl Univ Sci & Technol MISiS, Dept Engn Technol Equipment, Moscow, Russia
2 shared publications - R. E. Ishmukhametov
Novotroitsk Branch of NUST MISIS, Novotroitsk, Russian Federation
2 shared publications
Latest Publications
- 15 July 2025
- Published by Springer Nature in Metallurgist
- Vol. 69 (4) , 586-591
Reengineering of the ball mill drive at the Novotroitsk Plant of Chromium Compounds
- 15 July 2025
- Published by Springer Nature in Metallurgist
- Vol. 69 (4) , 586-591
Reengineering of the ball mill drive at the Novotroitsk Plant of Chromium Compounds
- 30 June 2025
- Published by Ore and Metals Publishing House in CIS Iron and Steel Review
- Vol. 29, 33-36
Vibrating device for the collapse of bulk materials in the hoppers of the sintering shop
It was established as a result of the analysis of the operability of bunkers for temporary storage and dosage of bulk materials in the dosage site of the sintering shop, that an arching effect in the process of their long-term operation appears; this effect concludes in sticking of materials above the hopper outlet, which are temporarily or permanently preventing material flow. For normal operation of dosing devices, it is necessary to ensure the continuous flow of material from the bins, since the main purpose of the dosage is to ensure continuous material flow from hoppers, because production of sinter with established quality and constant physicochemical properties is the main aim of dosing. To eliminate hangings in hoppers along their walls, manual labor is used, which poses a high danger to human health, due to high dustiness and high trauma hazard of the work performed. In order to eliminate the problem of arching and sticking, it is proposed to apply a vibrating method for influencing on charge materials, namely installation of a vibrating device of the “false wall” type. This device is a vibration exciter (vibrator), rigidly fixed on a vibrating panel via support element. A vibrating shield (false wall) is a steel plate that makes oscillating motions. There is a rubber damper between vibrating shield and hopper wall, designed to protect both these components against wear. The main advantages of using a vibrating device of the “false wall” type are small capital costs for reengineering, simplicity of installation and suitability for use in a sintering shop. Introduction of the designed device ensures improvement of manufactured sinter quality by improving flowability of materials in the dosage site of the sintering shop and a more accurate dosage, as well as rejection of operations associated with cleaning of hoppers, which are hazardous for human health. The economic calculation confirms the feasibility of the conducting measures for reengineering of hoppers in the conditions of a sintering shop.
- 30 June 2025
- Published by Ore and Metals Publishing House in CIS Iron and Steel Review
- Vol. 29, 33-36
Vibrating device for the collapse of bulk materials in the hoppers of the sintering shop
It was established as a result of the analysis of the operability of bunkers for temporary storage and dosage of bulk materials in the dosage site of the sintering shop, that an arching effect in the process of their long-term operation appears; this effect concludes in sticking of materials above the hopper outlet, which are temporarily or permanently preventing material flow. For normal operation of dosing devices, it is necessary to ensure the continuous flow of material from the bins, since the main purpose of the dosage is to ensure continuous material flow from hoppers, because production of sinter with established quality and constant physicochemical properties is the main aim of dosing. To eliminate hangings in hoppers along their walls, manual labor is used, which poses a high danger to human health, due to high dustiness and high trauma hazard of the work performed. In order to eliminate the problem of arching and sticking, it is proposed to apply a vibrating method for influencing on charge materials, namely installation of a vibrating device of the “false wall” type. This device is a vibration exciter (vibrator), rigidly fixed on a vibrating panel via support element. A vibrating shield (false wall) is a steel plate that makes oscillating motions. There is a rubber damper between vibrating shield and hopper wall, designed to protect both these components against wear. The main advantages of using a vibrating device of the “false wall” type are small capital costs for reengineering, simplicity of installation and suitability for use in a sintering shop. Introduction of the designed device ensures improvement of manufactured sinter quality by improving flowability of materials in the dosage site of the sintering shop and a more accurate dosage, as well as rejection of operations associated with cleaning of hoppers, which are hazardous for human health. The economic calculation confirms the feasibility of the conducting measures for reengineering of hoppers in the conditions of a sintering shop.
- 30 May 2025
- Published by Ore and Metals Publishing House in Chernye Metally
- No. 5,p. 13-16
Reengineering of a four-roll crusher for coke grinding in order to increase its reliability and productivity
The agglomeration production of Ural Steel JSC includes a charge preparation site and an agglomeration site. The raw material for the production of agglomerate is the charge, which is prepared at the charge preparation site using a four-roll crusher for crushing coke. When using existing equipment in an agglomeration shop, a significant disadvantage in its operation is the frequent failure of individual components due to a long service life and a long service life. As a result, device downtime occurs, as a rule, due to the low reliability of the current electric drive. In order to reduce the time of equipment repairs, which arise primarily due to the wear of outdated equipment, it is proposed to modernize the four-roll crusher, which consists in replacing the existing multi-element drive (electric motor, clutch and gearbox) with a coaxial gear motor, which is an appropriate solution for mechanisms operating in a repeated short-term mode. Additional capital expenditures required to modernize the drive of the crushers include the purchase and installation of gear motors, gear couplings and the manufacture of frames for gear motors. The total capital costs for the purchase of equipment, spare parts, logistics and the cost of dismantling old equipment and installing new equipment do not exceed 4.5 million rubles. As a result of this modernization: the cost of production decreased by 0.13 %; profit from sales increased by 0.42 %; the payback period of this event is less than 6 months. The project is efficient, pays off quickly and can be recommended for implementation not only at Ural Steel JSC, but also at other metallurgical enterprises in the industry.
- 30 May 2025
- Published by Ore and Metals Publishing House in Chernye Metally
- No. 5,p. 13-16
Reengineering of a four-roll crusher for coke grinding in order to increase its reliability and productivity
The agglomeration production of Ural Steel JSC includes a charge preparation site and an agglomeration site. The raw material for the production of agglomerate is the charge, which is prepared at the charge preparation site using a four-roll crusher for crushing coke. When using existing equipment in an agglomeration shop, a significant disadvantage in its operation is the frequent failure of individual components due to a long service life and a long service life. As a result, device downtime occurs, as a rule, due to the low reliability of the current electric drive. In order to reduce the time of equipment repairs, which arise primarily due to the wear of outdated equipment, it is proposed to modernize the four-roll crusher, which consists in replacing the existing multi-element drive (electric motor, clutch and gearbox) with a coaxial gear motor, which is an appropriate solution for mechanisms operating in a repeated short-term mode. Additional capital expenditures required to modernize the drive of the crushers include the purchase and installation of gear motors, gear couplings and the manufacture of frames for gear motors. The total capital costs for the purchase of equipment, spare parts, logistics and the cost of dismantling old equipment and installing new equipment do not exceed 4.5 million rubles. As a result of this modernization: the cost of production decreased by 0.13 %; profit from sales increased by 0.42 %; the payback period of this event is less than 6 months. The project is efficient, pays off quickly and can be recommended for implementation not only at Ural Steel JSC, but also at other metallurgical enterprises in the industry.
- 30 January 2025
- Published by Ore and Metals Publishing House in Chernye Metally
- No. 1,p. 16-19
Modernization of the drive of the hopper gate of the blast furnace autoclave for preparation of liquid glass
As a result of the analysis of the operability of the autoclave for the preparation of liquid glass necessary for lining cast iron buckets of the blast furnace shop, it was found that during long-term operation, failures of individual devices occur, which lead to unplanned downtime of equipment for cooking liquid glass, and as a result, to disruption of the bucket lining schedule and delay in the supply of cast iron for the needs of the electric steelmaking shop. It has been established that during operation of the autoclave hopper gate drive, in which an electric single-turn mechanism is used to open and close it, its frequent failure is observed, which leads to increased maintenance and repair costs, as well as to a decrease in the productivity of the technological process. It is proposed to replace the old electromechanical actuator with a pneumatic actuator, which will have higher performance indicators and ensure efficient operation of the unit during production processes. Calculations show that the implementation of design solutions leads to a decrease in the cost of production by 0.01 %, an increase in the profitability of production by 0.09 % and an increase in profit from sales by 0.07 %. Additional capital expenditures do not exceed 400 thousand rubles and pay off in less than 4 months.
- 30 January 2025
- Published by Ore and Metals Publishing House in Chernye Metally
- No. 1,p. 16-19
Modernization of the drive of the hopper gate of the blast furnace autoclave for preparation of liquid glass
As a result of the analysis of the operability of the autoclave for the preparation of liquid glass necessary for lining cast iron buckets of the blast furnace shop, it was found that during long-term operation, failures of individual devices occur, which lead to unplanned downtime of equipment for cooking liquid glass, and as a result, to disruption of the bucket lining schedule and delay in the supply of cast iron for the needs of the electric steelmaking shop. It has been established that during operation of the autoclave hopper gate drive, in which an electric single-turn mechanism is used to open and close it, its frequent failure is observed, which leads to increased maintenance and repair costs, as well as to a decrease in the productivity of the technological process. It is proposed to replace the old electromechanical actuator with a pneumatic actuator, which will have higher performance indicators and ensure efficient operation of the unit during production processes. Calculations show that the implementation of design solutions leads to a decrease in the cost of production by 0.01 %, an increase in the profitability of production by 0.09 % and an increase in profit from sales by 0.07 %. Additional capital expenditures do not exceed 400 thousand rubles and pay off in less than 4 months.
- Open Access
- 23 November 2024
- Published by National University of Science and Technology MISiS in Izvestiya. Ferrous Metallurgy
- Vol. 67 (6) , 735-737
Re-engineering of ball mill at Novotroitsk Plant of Chromium Compounds
Novotroitsk Plant of Chromium Compounds (NPCC) specializes in the processing of chromite and dolomite ores. Operating experience showed that the loss of operability of the ball mill installed in this workshop leads to unplanned downtime due to the failure of drive elements, which account for 11.3 % of the rated operating time of the workshop. To improve the reliability of technological equipment, it was proposed to replace the existing electric drive with a modern geared motor, which transmits rotation to the mill drum through a gear coupling. As a result of the new drive engineering, it was possible to simplify its design and reduce the labor intensity of maintenance and repair. Additional capital expenditures do not exceed RUB 3.4 million and pay off in less than 3 months.
- 23 November 2024
- Published by National University of Science and Technology MISiS in Izvestiya. Ferrous Metallurgy
- Vol. 67 (6) , 735-737
Open AccessRe-engineering of ball mill at Novotroitsk Plant of Chromium Compounds
Novotroitsk Plant of Chromium Compounds (NPCC) specializes in the processing of chromite and dolomite ores. Operating experience showed that the loss of operability of the ball mill installed in this workshop leads to unplanned downtime due to the failure of drive elements, which account for 11.3 % of the rated operating time of the workshop. To improve the reliability of technological equipment, it was proposed to replace the existing electric drive with a modern geared motor, which transmits rotation to the mill drum through a gear coupling. As a result of the new drive engineering, it was possible to simplify its design and reduce the labor intensity of maintenance and repair. Additional capital expenditures do not exceed RUB 3.4 million and pay off in less than 3 months.
- 1 November 2022
- Published by Allerton Press in Steel in Translation
- Vol. 52 (11) , 1051-1055
Upgrading Hopper Cars for Transportation of Sinter and Other Materials
The paper considers the results of the operability analysis of transporting equipment used at sintering shops of metallurgical enterprises located in the U
- 1 November 2022
- Published by Allerton Press in Steel in Translation
- Vol. 52 (11) , 1051-1055
Upgrading Hopper Cars for Transportation of Sinter and Other Materials
The paper considers the results of the operability analysis of transporting equipment used at sintering shops of metallurgical enterprises located in the U
- 1 July 2022
- Published by Allerton Press in Steel in Translation
- Vol. 52 (7) , 651-655
Development of System for Centralized Supply of Release Agent to Molds of Casting Facilities of CJSC RIFAR
The Rifar company is a Russian manufacturer of a new series of high-quality bimetallic and aluminum sector radiators. Bimetallic heating radiators are made
- 1 July 2022
- Published by Allerton Press in Steel in Translation
- Vol. 52 (7) , 651-655
Development of System for Centralized Supply of Release Agent to Molds of Casting Facilities of CJSC RIFAR
The Rifar company is a Russian manufacturer of a new series of high-quality bimetallic and aluminum sector radiators. Bimetallic heating radiators are made
- 31 May 2022
- Published by Ore and Metals Publishing House in Chernye Metally
- p. 22-26
Reengineering of the roller hardening machine of the sheet-rolling shop of JSC Ural Steel
In connection with the planned increase in the production of heat-treated rolled products of large thickness and bridge steel at JSC "Ural Steel", it became necessary to increase the productivity of thermal equipment. For this purpose, the roller hardening machine of the sheet rolling shop was re-engineered. Currently, the lifting and lowering of the lifting frame of the hardening machine is carried out by a spindle drive consisting of an electric motor, a bevel gearbox, spindle gears and cardan shafts. In the process of operation, the equipment of the electromechanical drive for lifting and lowering the pressure frame often fails due to the presence of a large number of rubbing elements, and significant labor costs are required to restore the working condition of the unit. To increase the reliability of the hardening machine, it is proposed to carry out its reengineering by replacing the electromechanical drive of lifting and lowering the pressure frame with a hydraulic drive. Replacing the electric drive with a hydraulic drive is advisable because the existing design already has hydraulic equipment, and at the same time a number of advantages are achieved: stepless regulation of the speed of the output link and ensuring small stable speeds; small size and weight; reversing the movement of the output link of the hydraulic transmission; high performance; Protection against overloads, due to the presence of safety valves, etc. The economic efficiency of design solutions is to reduce the cost of one ton of flat products due to a reduction in repair downtime (by 54 hours) and an increase in production (by 0.9%).
- 31 May 2022
- Published by Ore and Metals Publishing House in Chernye Metally
- p. 22-26
Reengineering of the roller hardening machine of the sheet-rolling shop of JSC Ural Steel
In connection with the planned increase in the production of heat-treated rolled products of large thickness and bridge steel at JSC "Ural Steel", it became necessary to increase the productivity of thermal equipment. For this purpose, the roller hardening machine of the sheet rolling shop was re-engineered. Currently, the lifting and lowering of the lifting frame of the hardening machine is carried out by a spindle drive consisting of an electric motor, a bevel gearbox, spindle gears and cardan shafts. In the process of operation, the equipment of the electromechanical drive for lifting and lowering the pressure frame often fails due to the presence of a large number of rubbing elements, and significant labor costs are required to restore the working condition of the unit. To increase the reliability of the hardening machine, it is proposed to carry out its reengineering by replacing the electromechanical drive of lifting and lowering the pressure frame with a hydraulic drive. Replacing the electric drive with a hydraulic drive is advisable because the existing design already has hydraulic equipment, and at the same time a number of advantages are achieved: stepless regulation of the speed of the output link and ensuring small stable speeds; small size and weight; reversing the movement of the output link of the hydraulic transmission; high performance; Protection against overloads, due to the presence of safety valves, etc. The economic efficiency of design solutions is to reduce the cost of one ton of flat products due to a reduction in repair downtime (by 54 hours) and an increase in production (by 0.9%).
- 31 August 2021
- Published by Ore and Metals Publishing House in Chernye Metally
- p. 4-9
Manipulator for feeding a box with liquid solution for repair of cast iron buckets at blast furnace shop of JSC Ural Steel
In the course of production at the site of repair of cast iron buckets, an important stage is the time of transportation of the finished solution to the site for servicing cast iron buckets. This process is carried out manually for small-volume containers or with the help of a workshop bridge crane with a significant volume of the finished solution. In both cases, the repair staff is forced to distract from the main process of repairing the iron buckets and monitor the process of preparing and transporting the solution to the site, as a result of which the entire production process slows down. At the same time, an important aspect is the constant employment of the shop bridge crane due to its operations in other areas of the blast furnace shop. The result is a delay in the working process, and, consequently, an increase in the time required for the repair of cast iron buckets. In this regard, it is proposed to mechanize the process of transporting the finished solution by means of a manipulator, with the help of which the feed is made directly to the site for servicing cast iron buckets, which will exclude the use of manual labor and/or the use of a shop bridge crane. A new design of the manipulator for feeding a box with a liquid solution for the repair of cast iron buckets of the blast furnace shop of JSC Ural Steel has been developed, which allows to increase productivity and reduce operating costs. The main elements of the manipulator arm rotation drive are selected: electric motor, gearbox, clutch with brake, etc. Calculations show that as a result of the implementation of the proposed measures, the time required for transporting the solution to the site will be reduced from 40 to 10 minutes, i.e. the time savings for performing this operation will be 0.5 hours. This modernization requires relatively small capital expenditures for the manufacture and installation of new components and equipment, and the cost-effectiveness of design solutions is to reduce production costs. The payback period of the proposed investment project is less than 4 years.
- 31 August 2021
- Published by Ore and Metals Publishing House in Chernye Metally
- p. 4-9
Manipulator for feeding a box with liquid solution for repair of cast iron buckets at blast furnace shop of JSC Ural Steel
In the course of production at the site of repair of cast iron buckets, an important stage is the time of transportation of the finished solution to the site for servicing cast iron buckets. This process is carried out manually for small-volume containers or with the help of a workshop bridge crane with a significant volume of the finished solution. In both cases, the repair staff is forced to distract from the main process of repairing the iron buckets and monitor the process of preparing and transporting the solution to the site, as a result of which the entire production process slows down. At the same time, an important aspect is the constant employment of the shop bridge crane due to its operations in other areas of the blast furnace shop. The result is a delay in the working process, and, consequently, an increase in the time required for the repair of cast iron buckets. In this regard, it is proposed to mechanize the process of transporting the finished solution by means of a manipulator, with the help of which the feed is made directly to the site for servicing cast iron buckets, which will exclude the use of manual labor and/or the use of a shop bridge crane. A new design of the manipulator for feeding a box with a liquid solution for the repair of cast iron buckets of the blast furnace shop of JSC Ural Steel has been developed, which allows to increase productivity and reduce operating costs. The main elements of the manipulator arm rotation drive are selected: electric motor, gearbox, clutch with brake, etc. Calculations show that as a result of the implementation of the proposed measures, the time required for transporting the solution to the site will be reduced from 40 to 10 minutes, i.e. the time savings for performing this operation will be 0.5 hours. This modernization requires relatively small capital expenditures for the manufacture and installation of new components and equipment, and the cost-effectiveness of design solutions is to reduce production costs. The payback period of the proposed investment project is less than 4 years.
- 31 May 2021
- Published by Ore and Metals Publishing House in Chernye Metally
- p. 28-32
Modernization of a rolling table before gas cutting machine of bloom CCM
The results of the analysis of the design of the intermediate rolling table in front of the gas cutting machine of the four-strand continuous casting machine (CCM-1) of the electric steelmaking shop of JSC Ural Steel are presented. It is shown that as a result of exposure to high temperatures (due to the unsuccessful location of the gear motor near the high temperature zone), the operability of the gear coupling of the gear motor is often disrupted. To improve the performance of the intermediate rolling table CCM-1, it is proposed to modernise it by installing a pull-down device on each strand directly in front of the gas cutting machine, the working element of which is a drive roller located above the rolling table. Rotation of the roller is carried out from an individual electric drive, and its pressing to the workpiece – by means of a hydraulic drive through a system of levers. This makes it possible to perform all 28 rollers of the rolling table non-drive ones, without changing their location. As a result of the modernization of the intermediate rolling table CML-1 in front of the gas cutting machine, it was possible to simplify its design and reduce the complexity of maintenance and repair by 64 hours per year. Replacing 28 drive rollers with non-drive rollers increases the reliability of their operation, allows you to increase the repair period of operation and thereby reduce the cost of operating costs. In addition, reducing the number of electric motors from 28 to 4 provides significant energy savings. Calculations show that the implementation of design solutions leads to a reduction in the cost of one ton of steel by 0.05 %, an increase in product profitability by 0.19 % and an increase in labor productivity by 0.41 %. Additional capital expenditures of about 1 million rubles are recouped in less than 3 months.
- 31 May 2021
- Published by Ore and Metals Publishing House in Chernye Metally
- p. 28-32
Modernization of a rolling table before gas cutting machine of bloom CCM
The results of the analysis of the design of the intermediate rolling table in front of the gas cutting machine of the four-strand continuous casting machine (CCM-1) of the electric steelmaking shop of JSC Ural Steel are presented. It is shown that as a result of exposure to high temperatures (due to the unsuccessful location of the gear motor near the high temperature zone), the operability of the gear coupling of the gear motor is often disrupted. To improve the performance of the intermediate rolling table CCM-1, it is proposed to modernise it by installing a pull-down device on each strand directly in front of the gas cutting machine, the working element of which is a drive roller located above the rolling table. Rotation of the roller is carried out from an individual electric drive, and its pressing to the workpiece – by means of a hydraulic drive through a system of levers. This makes it possible to perform all 28 rollers of the rolling table non-drive ones, without changing their location. As a result of the modernization of the intermediate rolling table CML-1 in front of the gas cutting machine, it was possible to simplify its design and reduce the complexity of maintenance and repair by 64 hours per year. Replacing 28 drive rollers with non-drive rollers increases the reliability of their operation, allows you to increase the repair period of operation and thereby reduce the cost of operating costs. In addition, reducing the number of electric motors from 28 to 4 provides significant energy savings. Calculations show that the implementation of design solutions leads to a reduction in the cost of one ton of steel by 0.05 %, an increase in product profitability by 0.19 % and an increase in labor productivity by 0.41 %. Additional capital expenditures of about 1 million rubles are recouped in less than 3 months.