UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) 26,4 KWP PADA SISTEM SMART MICROGRID UNUD
Open Access
- 6 September 2019
- journal article
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 6 (3) , 1-9
Abstract
Smart Microgrid System of Udayana University is collaboration project between Ministry of Energy and Mineral Resources with Udayana University. The system consist of 26.4 kWp Solar Power Plant, 5 kWp Wind Turbine, 20 kWp Diesel Generator, 192 kVAh battery and connected with a low voltage distribution network 220/380 V. This paper discusses performance of the solar power plant with HelioScope. The simulation results will be compared with the real energy production from solar power plant The simulation results is 43,055.4 kWh per year. Whereas the real production is 3,948.28 kWh, lower by 4,107.4 kWh or 9.53% than the simulation. Factors that influence the difference are shade, the cleanliness of solar modules and orientation of the solar modules.Keywords
This publication has 6 references indexed in Scilit:
- POTENSI PEMANFAATAN ATAP GEDUNG PUSAT PEMERINTAHAN KABUPATEN BADUNG UNTUK PLTS ROOFTOPJurnal SPEKTRUM, 2018
- Perencanaan Pembangkit Listrik Tenaga Surya Hybrid Pada Area Parkir Gedung Dinas Cipta Karya, Dinas Bina Marga Dan Pengairan Kabupaten BadungJurnal SPEKTRUM, 2018
- TINJAUAN TERHADAP PLTS 24 KW ATAP GEDUNG PT INDONESIA POWER PESANGGARAN BALIJurnal SPEKTRUM, 2018
- Implementation of Grid-connected PV Plant in Remote Location in Sumbawa Island of Indonesia: Lesson Learned2018
- Techno-economic Analysis of Solar-powered Lighting of Bali above Seawater Toll-RoadTELKOMNIKA (Telecommunication Computing Electronics and Control), 2018