I Nyoman Satya Kumara has a total of 39 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Analisis Efisiensi Energi dan Konservasi Energi Sistem Pendingin Ruangan Berdasarkan UI Greenmetric, Studi Kasus Fakultas Teknik Universitas Udayana

    by Ranga Bayu Natapathy, I Nyoman Satya Kumara, I. A. Dwi Giriantari

    The participation of universities in the development of Green Buildings through the implementation of the Green Campus program. One of the benchmarks for Green Campus development is the UI GreenMetric ranking. This research examines one of its assessment indicators, the Use of Energy-Efficient Equipment (EC1). This research evaluates the implementation of energy efficiency through stages ranging from data collection on existing conditions, recommendations for feasible energy efficiencies, comparison of existing energy consumption with the recommendations, and analysis of investment costs to determine the payback period.


  • Open Access

    Analysis of the Influence of Sunlight Radiation on the Output Power of Monocrystalline Full Cell, Half-Cut Cell, and Shingled Cell Solar Panels

    by Ita Ayu Purnawati, I Nyoman Satya Kumara, Wayan Gede Ariastina

    Indonesia has a huge potential for solar energy, but its utilization until 2024 only reach 573.8 MWp. The low utilization of solar energy is caused by the limited vacant land for solar power plant installations, especially in urban areas. Rooftop solar power plants are expected to increase the use of solar energy in urban areas. Choosing the right solar panels on rooftop solar is necessary to get the best performing solar panels even though they are placed on limited land. The development of cell arrangement and shape technology in solar panels has resulted in full cell, half-cut cell, and shingled cell solar panels. The weather parameter observed in this study is sunlight radiation. Direct observation was carried out for 4 days at 08.00-16.00 WIB in the Kediri Meteorological Station (BMKG Kediri), with data collection every 5 minutes. The results of the study show that sunlight radiation has a significant influence on the output power of solar panels. The determination coefficient (R2) value of sunlight radiation against solar panels is 0.60 in monocrystalline full cells, 0.65 in monocrystalline half-cut cells, and 0.66 in monocrystalline shingled cells.

  • Open Access

    Analisis Investasi PLTS 8 kWp On-Grid Pada Bangunan Apartemen Pariwisata di Bali

    by Ananda Sri Murti, I.N.S. Kumara, W.G. Ariastina

    Potensi Energi Baru terbarukan (EBT) di Indonesia tergolong sangat tinggi sehingga pemerintah berkomitmen untuk melakukan transisi energi menuju energi bersih dengan target bauran 23% pada tahun 2025 yang tertuang dalam RUEN. Salah satu EBT yang paling mudah untuk dikembangkan dan dibangun saat ini adalah Pembangkit Listrik Tenaga Surya (PLTS). Namun sampai tahun 2022, porsi bauran EBT baru mencapai 12,3% dan khusus PLTS dengan potensi sebesar 200 GW yang tersebar di seluruh Indonesia namun pemanfaatannya masih kurang dari 300 MW. Menurut data siaran pers ESDM 2023 menunjukkan kapasitas terpasang untuk PLTS tahun 2022 baru mencapai 271,6 MWp. Kondisi ini juga diperparah oleh perubahan regulasi terkait pemasangan PLTS, khususnya PLTS Atap dimana beberapa poin insentif dihilangkan sehingga investasi yang dilakukan menjadi kurang menarik di mata masyarakat. Oleh sebab itu Penelitian ini penting dilakukan untuk mengetahui regulasi PLTS mana yang bisa memberikan solusi yang saling menguntungkan baik bagi pemerintah serta masyarakat dalam hal meningkatkan bauran energi terbarukan serta dampak investasi yang dirasakan. Penelitian ini menggunakan PLTS terpasang sebesar 8 kWp on-grid yang terletak di Desa Tumbak Bayuh, Badung sebagai studi kasus penelitian. Selanjutnya dilakukan pengumpulan data untuk melakukan kelayakan investasi dari pembangunan PLTS Atap tersebut menggunakan 3 skenario regulasi yaitu Permen ESDM No 48 tahun 2018, Permen ESDM No 26 Tahun 2021, dan Permen ESDM No 2 Tahun 2024. Metode yang dipakai dalam menilai kelayakan investasi adalah Net Present Value, Internal Rate of Return, Benefit Cost Ratio, dan Payback Period. Hasil akhir menunjukkan bahwa Permen ESDM No 26 Tahun 2021 memberikan kelayakan investasi yang paling menarik yaitu dengan PP tercepat selama 5,7 Tahun, IRR sebesar 16,18%, NPV sebesar Rp. 162.920.001, dan nilai BCR sebesar 1,63. Namun regulasi Permen ESDM No 48 tahun 2018 layak untuk dipertimbangkan karena memberikan hasil investasi yang mendekati sama untuk nilai BCR dan IRR pada Permen ESDM No 26 Tahun 2021 serta mampu memberikan solusi yang saling menguntungkan baik bagi pemerintah serta masyarakat.


  • Open Access

    PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG PARKIR BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI

    by Gede Agus Wira Dharma, Dwi Giriantari, I Wayan Sukerayasa, I Nyoman Setiawan, Wayan Gede Ariastina, I Nyoman Satya Kumara

    Using sustainable energy as a source of electrical energy is a safe way to increase ecosystem energy. One of them is the utilization of photovoltaic directed energy by upgrading the PLTS on top of the structure as a mechanism for introducing photovoltaic modules. The study finalized the plan to install PLTS on the roof of the I Gusti Ngurah Rai Airport parking lot as a source of electrical energy to reduce PLN electricity bills. The I Gusti Ngurah Rai Airport Parking Roof Solar Power Plant uses a battery-free on gridsystem with 600 units of 555Wp monocrystalline solar-based modules and four 100kW inverter units. The solar power plant to be built on the car park of Terminal I Gusti Ngurah Rai will have a capacity of 333kWp and will produce 604.929kWh of energy annually. The required speculation cost is Rp 3.004.620.000 and payback period for 6 years.


  • Open Access

    PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI

    by Gede Purna Suartawan, I. A. Dwi Giriantari, I Wayan Sukerayasa, Wayan Gede Ariastina, I Nyoman Setiawan, I Nyoman Satya Kumara

    The installed PLTS capacity in Bali is currently still 3.44% of the target given by the General National Energy Plan (RUEN) of 108 MWp in 2025. The island of Bali has limited land availability so rooftop PLTS is a solution. The design of the rooftop PLTS was carried out on the roof of the Wisti Sabha Building at I Gusti Ngurah Rai International Airport. The research uses PVSyst simulation software while the investment feasibility method uses the Benefit-Cost Ratio (BCR), Net Present Value and discounted payback period (DPP) methods. Based on the simulation results, the rooftop PLTS capacity is 56.6 kWp with energy production of 98,009 kWh/year. The B-CR value obtained is 2.23, the net present value is IDR 707,436,838.55 and the DPP is 7 years, with a rooftop solar system life of 25 years.


  • Open Access

    STUDI PENGURANGAN EMISI KARBON SISTEM KETENAGALISTRIKAN PROVINSI BALI: ANALISIS RUPTL 2021-2030

    by Aditya Perdana Putra Purnomo, Ida Ayu Dwi Giriantari, I Nyoman Satya Kumara

    Indonesia's Nationally Determined Contribution (NDC) targets a 19 to 27% reduction in greenhouse gas (GHG) emissions from the energy sector compared to the business-as-usual scenario. Assuming this target applies uniformly to all provinces in Indonesia, including the power sector, a modeling analysis of Bali's power system is conducted to assess GHG emission reductions. Two scenarios are developed in the Low Emissions Analysis Platform (LEAP) to evaluate the future deployment of Bali's power system. The Business-As-Usual (BaU) scenario serves as the baseline for emission reduction in other scenarios and assumes the development of Bali's power system without emission reduction interventions. The RUPTL scenario assumes the continued development of Bali's power system in line with the electricity development plan document. Results show that the RUPTL scenario achieves a 20.89% reduction in emissions, which fulfills the regional assumption of a 19% NDC target. However, it falls short of achieving the 2030 target of 27% emission reduction.

  • Open Access

    RANCANG BANGUN CONTROLLER BLDC BERBASIS MIKROKONTROLER STM32 BLUE PILL PADA KENDARAAN LISTRIK URBAN AGNIJAYA WEIMANA

    by Mas Nyoman Ngadeg A. C., I Nyoman Satya Kumara, I Putu Elba Duta Nugraha

    The increase in the consumption of fuel oil causes the depletion of fossil fuel reserves. One alternative energy solution that can be utilized is electrical energy. One of the efforts to overcome the energy crisis can be realized in a creativity in the energy efficient car contest (KMHE). The Weimana Team of Udayana University participated in the urban concept category of electric motor drive under the name Agnijaya Vehicle. One important aspect in order to be able to compete and win the competition is the Motor Controller. In this paper, the results of the research are presented on a design of a Brushless DC Motor Controller based on the STM32 Blue Pill microcontroller and used to rotate the BLDC motor on the Agnijaya Weimana Urban Electric Vehicle. The specifications of the BLDC controller design are made to have a power dissipation inverter with a power of 1980 Watt connected to an 800 Watt sensored BLDC motor. The STM32 Blue Pill microcontroller-based Brushless DC Motor Controller has been successfully designed and manufactured and produces a sinusoidal output waveform containing switching noise when connected to a no-load BLDC motor. The performance to drive Agnijaya Wimana's Urban Electric Vehicle is capable of implementing a PWM duty cycle of up to 100% with an average current achievement of 24,775 Ampere, an average voltage drop of up to 48,485 VDC, an average power rating of up to 1200,5 Watt and a BLDC motor speed up to 419,5 RPM.

  • Open Access

    PERANCANGAN DAN SIMULASI PLTS ATAP 1 KWP MENGGUNAKAN HELIOSCOPE

    by I Gede Civavisna Brahma, I Nyoman Satya Kumara, Ida Ayu Dwi Giriantari

    Solar Power Plant (PLTS) as one of the renewable energy sources that is being focused on its development. This article discusses the design and simulation of the performance of a 1 kWp rooftop solar power plant using a Helisocope. The input data required by the Helioscope is PLTS technical specifications such as solar panel technology, inverter type, number and type of modules selected and land area. The location data required by the PLTS system includes the coordinates, the type of roof of the building, the environment around the PLTS and meteorological data. The 1 kWp PLTS roof system designed at the location that the author uses uses 7 pcs Canadian Solar 195 Wp panels, 1 pcs 1 kW AEC inverter, installed on the roof of the building facing north, and connected to the PLN network via a net meter. This 1 kWp rooftop PLTS is capable of producing an average daily average of 5,48 kWh, 41,07 kWh weekly, 164,29 kWh monthly, and annual 1971,5 kWh. Energy production varies by an average of 8% per month with the minimum production in January of 135,1 kWh and the highest in July of 184,5 kWh. The designed 1 kWp PLTS roof produces a performance ratio of 73,6% with the irradiation received in a year reaching 1859,2 kWh/m2. The initial investment required to build a 1 kwp PLTS roof is IDR. 20.000.000.


  • Open Access

    REVIEW STATUS PANEL SURYA DI INDONESIA MENUJU REALISASI KAPASITAS PLTS NASIONAL 6500 MW

    by Ni Made Neli Lestari, I Nyoman Satya Kumara, Ida Ayu Dwi Giriantari

    PLTS is a power plant that converts sunlight energy into electricity using photovoltaic technology. Solar panels play an important role in PLTS, because solar panels capture solar radiation then convert it into electrical energy. The development of solar panel technology is the key to support the development of PLTS. This article reviews about the development of solar panels in Indonesia as an important component to support the development of national solar power plants towards a capacity of 6500 MW by 2025. The review will be carried out on various aspects of solar panels including the national solar panel industry, solar panels available in the domestic market, and the availability of various panels. Data is obtained from the national panel industry, the PLTS project, the PLTS user association, the national EPC, the Ministry of Energy and Mineral Resources, and the national solar panel vendor. The survey result shows there are 241 panels, both local and foreign production. Panel capacities vary from 5 Watt to 500 Watt and panel voltages are available from 12 Volt, 24 Volt and 48 Volt. Based on the survey, it is also obtained the average of Rp/Wp is Rp.18,853/Wp and the average of W/m2 is 159,46 W/m2. Increasing solar panel production can be done by providing incentives to solar panel producers in the form of product purchase guarantees and incentives to develop new factories. Information regarding the current status of solar panels in Indonesia is expected to be a quick reference for people or institutions that need it, and can be used as an introduction to research and application of PLTS in Indonesia.


  • Open Access

    PERKEMBANGAN BATERAI DAN CHARGER UNTUK MENDUKUNG PEMASYARAKATAN SEPEDA LISTRIK DI INDONESIA

    by N. M. A. Wijaya, I. N. S. Kumara, Y. Divayana

    Nowadays electric vehicles begin to grow and are supported by improved batterytechnology such as smaller size and capable of storing large amounts of energy. One type ofsimple electric vehicle is an electric bicycle. This paper reviews the availability of batteries andbattery chargers for electric bicycles in Indonesia. The review includes a discussion on thetechnical specifications, manufacturer, the vendor of the battery, and battery charger. Thesurvey produced a data consists of 117 batteries and 54 chargers and then processed to obtainstatus on the availability in the domestic market. The information regarding the availability ofbatteries and battery chargers for electric bicycles is expected to be used as a quick referencefor the community in choosing batteries and battery chargers for electric bicycles and canprovide an overview to stakeholders about the status of batteries and chargers in conductingresearch and development of batteries and charging equipment for electric vehicles.