Influence of Drawdown Period on Overflow Volume and Pollutant Treatment for Detention-Based Stormwater Control Measures in Raleigh, North Carolina
- 1 May 2015
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Sustainable Water in the Built Environment
- Vol. 1 (2)
Abstract
No abstract availableKeywords
This publication has 33 references indexed in Scilit:
- Water‐Quality Performance of a Constructed Stormwater Wetland for All Flow Conditions1Jawra Journal of the American Water Resources Association, 2010
- Nitrogen2008
- Modelling wet weather sediment removal by stormwater constructed wetlands: Insights from a laboratory studyJournal of Hydrology, 2007
- Constructed Wetlands for Water Pollution Control ‐ Processes, Parameters and PerformanceDevelopments in Chemical Engineering and Mineral Processing, 2004
- Effectiveness of dry ponds for stormwater total suspended solids removalCanadian Journal of Civil Engineering, 2002
- Pollutant Removal Efficacy of Three Wet Detention PondsJournal of Environmental Quality, 2002
- Comparison of the heavy metal content of motorway stormwater following discharge into wet biofiltration and dry detention ponds along the London Orbital (M25) motorwayScience of The Total Environment, 1999
- Modelling residence time in stormwater pondsEcological Engineering, 1998
- Pollutant removal by a stormwater dry detention pondWater Environment Research, 1996
- Effects of vegetation on flow through free water surface wetlandsEcological Engineering, 1995