Abstract
Reliable operation of multi-channel power electronic converters in large pumped storage plant is a main concern among policy makers and/or hydropower project developers. This paper aims to design a two-stage protection circuit operation strategy for large rated doubly fed induction machine (DFIM) employed for variable speed pumped storage power plants. The paper initially studies the dynamic behavior of DFIM under symmetrical short circuit faults in both 400-kV power system and stator terminal of the generating unit. Based on the fault analysis a two-stage protection circuit (dc-link braking chopper circuit, crowbar protection circuit) operation strategy is designed in consideration of practical limitations. The designed operation strategy ensures the continuous operation of large rated DFIM under marginal grid disturbances. To investigate the effective operation of two-stage protection circuit, a 250 MW DFIM with multi-channel power converters are implemented in MATLAB/Simulink tool. An experimental test is carried in a 2.2 kW DFIM laboratory prototype.
Funding Information
  • Central Power Research Institute (CPR-1394-WRC)

This publication has 21 references indexed in Scilit: