Model Simulasi Risiko Rantai Pasok Material Proyek Konstruksi Gedung
Open Access
- 28 July 2017
- journal article
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in MEDIA KOMUNIKASI TEKNIK SIPIL
- Vol. 23 (1) , 1-13
Abstract
Delays related to materials are one of main problems of construction project. An effective supply chain management has a significant role in preventing this type of delay. The aim of this research is develop risk simulation model of construction supply chain in buildings. The materials include steel bars, steel profiles, formwork, and precast concrete, as they are considered the main building material. The supply chain risks are classified from supply, control, process, and demand sides. Monte Carlo simulation has been performed using Cristal Ball software. Risk identification was done through literature review, site observation, and interviews with 29 contractor personnel working for nine building projects. The simulation results show that the minimum, maximum, and most frequent delays (in days), as follows: steel bars (2.20. 17.05, 11.24); steel profiles (2.12, 15.10, 9.75), formwork (1.79, 16.04, 10.45), precast concrete (1.76, 15.61, 10.24). The sensitivity analysis shows that delay due to change order from client is the most sensitive for steel bars, steel profiles, and formwork of 25.5%, 37.4%, dan 17%, respectively. The results of this research is useful for contractors and owners who can use them as a guidance in identifying, predicting, and mitigating supply chain risks for a successful project.Keywords
This publication has 23 references indexed in Scilit:
- Analyzing delay causes in Egyptian construction projectsJournal of Advanced Research, 2014
- Robust supply chain network design with service level against disruptions and demand uncertainties: A real-life caseEuropean Journal of Operational Research, 2013
- Identifying and Categorizing the Sources of Uncertainty in Construction Supply ChainsJournal of Construction Engineering and Management, 2013
- A risk management-based approach for inventory planning of engineering-to-order productionCIRP Annals, 2012
- A quantitative analysis of disruption risk in a multi-echelon supply chainInternational Journal of Production Economics, 2012
- Dynamic pricing in the newsvendor problem with yield risksInternational Journal of Production Economics, 2012
- A service oriented framework for construction supply chain integrationAutomation in Construction, 2010
- Cost escalation and schedule delays in road construction projects in ZambiaInternational Journal of Project Management, 2009
- Coordination mechanisms for construction supply chain management in the Internet environmentInternational Journal of Project Management, 2007
- An agent-based framework for supply chain coordination in constructionAutomation in Construction, 2005