Long‐term behavior of slender long‐span precast prestressed high‐strength concrete girders
- 29 January 2024
- journal article
- research article
- Published by Wiley in Structural Concrete
- Vol. 25 (3) , 1571-1589
Abstract
The long‐term behavior of slender (1/40) long‐span precast high‐strength concrete girders was experimentally investigated regarding their use as a competitive solution in relation to steel alternatives for highway overpasses. The time‐dependent effects of full‐scale girders has rarely been addressed, particularly the influence of creep and shrinkage of concrete with compressive strengths around 120 MPa. Two half‐scale girder specimens were produced using an economically optimized and high‐strength concrete mixture, nonfiber reinforced, designed only with conventional raw materials, currently available at Portuguese precast companies, and subjected to long‐term loading, with a magnitude of approximately 50% of the failure load in bending, during a period of 3.75 years. Using the same mixture, prismatic specimens were also produced and subjected to long‐term loading at 24 h and 7 days of age to assess both creep and shrinkage. Results show that the age of concrete at the loading day is of paramount importance regarding the time‐dependent effects. These are most relevant during the first days of loading and tend to stabilize from the 112th day of loading onward. The time‐dependent girder's mid‐span deflection at the end of the 3.75 years did not exceed more than 50% of the initial deformation. Comparison of results with those obtained with Model Code 2010 and the current version of Eurocode 2 shows that these underestimate strains and deflections due to creep, mostly because the short‐term development of these effects, occurring during the first days of loading, are not adequately represented. On the contrary, a sound agreement between experimental and theoretical values, both in short and long term, was obtained using the Auperin et al. approach.Keywords
This publication has 19 references indexed in Scilit:
- Shear Strength and Behavior of High-Strength Concrete Prestressed BeamsACI Structural Journal, 2017
- Size effect in ultra-high-performance concrete beamsEngineering Fracture Mechanics, 2016
- Simplified Procedure for Evaluating the Effects of Creep and Shrinkage on Prestressed Concrete Girder Bridges and the Application of European and North American Prediction ModelsJournal of Bridge Engineering, 2013
- Structural Performance of Precast/Prestressed Bridge Double-Tee Girders Made of High-Strength Concrete, Welded Wire Reinforcement, and 18-mm-Diameter StrandsJournal of Bridge Engineering, 2013
- Excessive Long-Time Deflections of Prestressed Box Girders. I: Record-Span Bridge in Palau and Other ParadigmsJournal of Structural Engineering, 2012
- Flexural Behavior of an Ultrahigh-Performance Concrete I-GirderJournal of Bridge Engineering, 2008
- Age-Adjusted Effective Modulus Method for Creep of High-Performance ConcreteKey Engineering Materials, 2006
- Long-Term Performance of Prestressed, Pretensioned High Strength Concrete Bridge GirdersPCI Journal, 1995
- Impact of High Strength Concrete on the Design and Construction of Pretensioned Girder BridgesPCI Journal, 1994
- High Strength Prestressed Concrete Bridge Girder PerformancePCI Journal, 1993