Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost
- 1 July 2008
- journal article
- research article
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 26 (7) , 679-691
Abstract
Uncertainties should be considered in any time–cost trade‐off problems when minimizing project cost and duration, which leads to the so‐called stochastic time–cost trade‐off problem. A new approach to investigate stochastic time–cost trade‐off problems employing fuzzy logic theory is presented. The proposed approach fully embeds the fuzzy structure of the uncertainties in total direct cost into the model. An appropriate GA is used to develop a solution to the multi‐objective fuzzy time cost model. The accepted risk level of the project manager is defined through α cut approach for which a separate Pareto front with set of non‐dominated solutions has been developed. To compare the alternative set of options for any assumed project duration, associated fuzzy costs for different values of α cut are ranked employing two appropriate approaches for fuzzy costs comparison. The proposed models are applied to solve two benchmark test problems. It is shown that the models facilitate the decision‐making process by selecting specified risk levels and employing the associated Pareto front.Keywords
This publication has 21 references indexed in Scilit:
- A MODEL FOR CONSTRUCTION PROJECT BUDGET AND SCHEDULE PERFORMANCES USING FUZZY DATACivil Engineering and Environmental Systems, 2001
- A GA-based fuzzy optimal model for construction time–cost trade-offInternational Journal of Project Management, 2001
- Stochastic Construction Time-Cost Trade-Off AnalysisJournal of Computing in Civil Engineering, 2000
- Optimization of construction time-cost trade-off analysis using genetic algorithmsCanadian Journal of Civil Engineering, 1999
- Using Machine Learning and GA to Solve Time-Cost Trade-Off ProblemsJournal of Construction Engineering and Management, 1999
- Using Improved Genetic Algorithms to Facilitate Time-Cost OptimizationJournal of Construction Engineering and Management, 1997
- Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off ProblemsJournal of Computing in Civil Engineering, 1997
- Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid MethodJournal of Construction Engineering and Management, 1995
- Fuzzy Multiple Attribute Decision Making1992
- Optimal Probabilistic Compression of PERT NetworksJournal of Construction Engineering and Management, 1984