An Evolutionary Hyper-heuristic for the Software Project Scheduling Problem
- 31 August 2016
- book chapter
- Published by Springer Nature
- p. 37-47
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Dynamic Software Project Scheduling through a Proactive-Rescheduling MethodIEEE Transactions on Software Engineering, 2015
- A Max–Min Ant System algorithm to solve the Software Project Scheduling ProblemExpert Systems with Applications, 2014
- Effective learning hyper-heuristics for the course timetabling problemEuropean Journal of Operational Research, 2014
- Dynamic Selection of Evolutionary Algorithm Operators Based on Online Learning and Fitness Landscape Metrics2014
- Adaptive Operator Selection With Bandits for a Multiobjective Evolutionary Algorithm Based on DecompositionIEEE Transactions on Evolutionary Computation, 2013
- Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based SchedulerIEEE Transactions on Software Engineering, 2012
- A Classification of Hyper-heuristic Approaches2010
- Time-line based model for software project scheduling with genetic algorithmsInformation and Software Technology, 2008
- Software project management with GAsInformation Sciences, 2007
- Scheduling subject to resource constraints: classification and complexityDiscrete Applied Mathematics, 1983