Xiuli Wu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Xiuli Wu has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
- Hao Zhou
School of Computer and Communication Technology, Lanzhou University of Technology, Lanzhou, China
2 shared publications Jing Li
School of Mechanical Engineering University of Science and Technology Beijing Beijing People's Republic of China
2 shared publicationsZirun Xie
2 shared publications- Chenxing Wang
School of Mechanical Engineering, University of Science and Technology Beijing, Beijing, China
1 shared publication - Cong Peng
School of Electronic and Information Engineering, Beijing Jiaotong University, Beijing, PR China
1 shared publication Dongliang Gao
University of Science and Technology Beijing
1 shared publication
Latest Publications
- 18 September 2026
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 278
Gaussian-mixture importance sampling for reliability evaluation of dependent degradation systems under epistemic uncertainty
- 18 September 2026
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 278
Gaussian-mixture importance sampling for reliability evaluation of dependent degradation systems under epistemic uncertainty
- 24 November 2025
- Published by Elsevier in Expert Systems with Applications
- Vol. 301
Feature-based neural network optimization framework for flexible job shop scheduling
- 24 November 2025
- Published by Elsevier in Expert Systems with Applications
- Vol. 301
Feature-based neural network optimization framework for flexible job shop scheduling
- 8 July 2023
- Published by Springer Nature
- p. 242-255
An Improved NSGA-II for Solving Reentrant Flexible Assembly Job Shop Scheduling Problem
- 8 July 2023
- Published by Springer Nature
- p. 242-255
An Improved NSGA-II for Solving Reentrant Flexible Assembly Job Shop Scheduling Problem
- 8 March 2021
- Published by Wiley in International Journal of Intelligent Systems
- Vol. 36 (6) , 2895-2921
On investigation of the Bayesian anomaly in multiple imprecise dependent information aggregation for system reliability evaluation
- 8 March 2021
- Published by Wiley in International Journal of Intelligent Systems
- Vol. 36 (6) , 2895-2921
On investigation of the Bayesian anomaly in multiple imprecise dependent information aggregation for system reliability evaluation
- Open Access
- 2 March 2021
- Published by Institution of Engineering and Technology (IET) in IET Collaborative Intelligent Manufacturing
- Vol. 3 (2) , 119-130
A survival duration‐guided NSGA‐III for sustainable flexible job shop scheduling problem considering dual resources
Considering the increasing concern on sustainable development from manufacturers, focus is given to three kinds of indicators of sustainable development, that is, economy, environment, and society, and schedule two types of resource, that is machines and workers, simultaneously in the classical flexible job shop scheduling problem. The authors define it as a sustainable flexible job shop scheduling problem considering dual resources (SFJSPCDR). First, a model of the SFJSPCDR is formulated to optimise the makespan, the energy consumption, and the ergonomic risk simultaneously. Second, an improved survival duration‐guided NSGA‐III algorithm (SDG‐NSGA‐III) is proposed to solve SFJSPCDR. The survival duration of each individual determines whether it takes part in generating offspring. In order to balance the energy consumption and ergonomic risk while minimising the makespan, a double‐low decoding algorithm is proposed, which is composed of two decoding algorithms. Cross‐generation selection is employed with the non‐dominated sorting, and the next‐generation population is selected according to the reference point‐based selection strategy. In addition, a restart strategy is also integrated to improve the exploration and exploitation performance of the SDG‐NSGA‐III algorithm. Finally, a group of experiments are carried out and the results prove the effectiveness of the proposed algorithm.
- 2 March 2021
- Published by Institution of Engineering and Technology (IET) in IET Collaborative Intelligent Manufacturing
- Vol. 3 (2) , 119-130
Open AccessA survival duration‐guided NSGA‐III for sustainable flexible job shop scheduling problem considering dual resources
Considering the increasing concern on sustainable development from manufacturers, focus is given to three kinds of indicators of sustainable development, that is, economy, environment, and society, and schedule two types of resource, that is machines and workers, simultaneously in the classical flexible job shop scheduling problem. The authors define it as a sustainable flexible job shop scheduling problem considering dual resources (SFJSPCDR). First, a model of the SFJSPCDR is formulated to optimise the makespan, the energy consumption, and the ergonomic risk simultaneously. Second, an improved survival duration‐guided NSGA‐III algorithm (SDG‐NSGA‐III) is proposed to solve SFJSPCDR. The survival duration of each individual determines whether it takes part in generating offspring. In order to balance the energy consumption and ergonomic risk while minimising the makespan, a double‐low decoding algorithm is proposed, which is composed of two decoding algorithms. Cross‐generation selection is employed with the non‐dominated sorting, and the next‐generation population is selected according to the reference point‐based selection strategy. In addition, a restart strategy is also integrated to improve the exploration and exploitation performance of the SDG‐NSGA‐III algorithm. Finally, a group of experiments are carried out and the results prove the effectiveness of the proposed algorithm.
- Open Access
- 17 June 2019
- Published by Institution of Engineering and Technology (IET) in IET Collaborative Intelligent Manufacturing
- Vol. 1 (2) , 56-66
Hybrid flow shop scheduling problem in ubiquitous manufacturing environment
As a new smart manufacturing mode, Internet of manufacturing things could collect information from production line and help to make a timely and accurate decision. However, this new mode poses new challenges to production operation management. This article focuses on the hybrid flow shop scheduling problem in ubiquitous manufacturing environment. Advanced wireless devices such as radio frequency identification are deployed to enable interconnection and perception among workers, materials and equipment in shop floor. The scheduling optimisation models for the planning layer and the scheduling layer are established, respectively. The evolutionary game algorithm is proposed to optimise the assignment of daily production tasks in the planning layer. According to the real‐time situations of various production resources, the non‐dominated sorted genetic algorithm is utilised to optimise the real‐time scheduling of daily tasks in the scheduling layer. Between the two layers, real‐time production information is exchanged by advanced wireless devices. Finally, two production scenarios in off‐season and peak‐season are presented. The experimental results verify the efficiency and the effectiveness of the proposed approach under different production conditions.
- 17 June 2019
- Published by Institution of Engineering and Technology (IET) in IET Collaborative Intelligent Manufacturing
- Vol. 1 (2) , 56-66
Open AccessHybrid flow shop scheduling problem in ubiquitous manufacturing environment
As a new smart manufacturing mode, Internet of manufacturing things could collect information from production line and help to make a timely and accurate decision. However, this new mode poses new challenges to production operation management. This article focuses on the hybrid flow shop scheduling problem in ubiquitous manufacturing environment. Advanced wireless devices such as radio frequency identification are deployed to enable interconnection and perception among workers, materials and equipment in shop floor. The scheduling optimisation models for the planning layer and the scheduling layer are established, respectively. The evolutionary game algorithm is proposed to optimise the assignment of daily production tasks in the planning layer. According to the real‐time situations of various production resources, the non‐dominated sorted genetic algorithm is utilised to optimise the real‐time scheduling of daily tasks in the scheduling layer. Between the two layers, real‐time production information is exchanged by advanced wireless devices. Finally, two production scenarios in off‐season and peak‐season are presented. The experimental results verify the efficiency and the effectiveness of the proposed approach under different production conditions.