Multifactor Uncertainty Analysis of Construction Risk for Deep Foundation Pits
Open Access
- 13 August 2022
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 12 (16) , 8122
Abstract
As it is affected by many uncertain factors, the construction risk of deep foundation subway station pits involves fuzzy and random uncertainties. Considering the fuzzy and random uncertainties involved in risk evaluation, an improved fuzzy comprehensive evaluation method combining a triangular cloud model and the probability density function (PDF) is proposed in this study. First, with reference to the actual situation of deep foundation pit construction, the sources of construction risk are identified, and a construction risk evaluation index system is established. Second, the Delphi method is used to analyse the importance of each index of the evaluation object in order to obtain the evaluation data. The fuzzy best worst method (FBWM) is used to calculate the weight of the evaluation indices. Then, the triangular cloud model is used to represent the risk grade membership function. In addition, the fuzzy comprehensive evaluation method is used to comprehensively evaluate the construction risk of deep foundation pits. The fuzzy comprehensive evaluation vector is obtained for the indices possibility (P) and loss (C), and the weighted average value of the vector’s risk grade is calculated. Finally, probability analysis is carried out using PDF to determine the risk grade of P and C, and thus, to determine the risk grade of deep foundation pit construction. This method optimises the risk evaluation process of deep foundation pit construction and realises the visualisation of the comprehensive evaluation results, making the risk evaluation process transparent and convenient for use by risk analysts. This method is applied to predict the construction risk grade of a deep foundation pit project in Nanning, China, and the prediction results are consistent with the actual situation.Keywords
Funding Information
- the Guangxi Natural Science Foundation (2022GXNSFBA035580)
- Specific Research Project of Guangxi for Research Bases and Talents (AD21220039)
- the Guangxi Postgraduate Education Innovation Programme (YCSW2022071)
This publication has 14 references indexed in Scilit:
- Construction risk assessment of deep foundation pit in metro station based on G-COWA methodIOP Conference Series: Earth and Environmental Science, 2018
- Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an iranian case studyJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017
- Fuzzy best-worst multi-criteria decision-making method and its applicationsKnowledge-Based Systems, 2017
- Best-worst multi-criteria decision-making methodOmega, 2015
- Fuzzy Analytic Hierarchy Process Synthetic Evaluation Models for the Health Monitoring of Shield TunnelsComputer-Aided Civil and Infrastructure Engineering, 2014
- The Risk Management Practice of a Deep Foundation Pit ProjectApplied Mechanics and Materials, 2014
- Study on Risk Management of Deep Foundation Pit EngineeringApplied Mechanics and Materials, 2014
- Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, ChinaJournal of Construction Engineering and Management, 2011
- Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2Tunnelling and Underground Space Technology, 2004
- Fuzzy setsInformation and Control, 1965