An adaptive genetic algorithm for demand-driven and resource-constrained project scheduling in aircraft assembly
- 8 April 2015
- journal article
- Published by Springer Nature in Information Technology and Management
- Vol. 18 (1) , 41-53
Abstract
No abstract availableKeywords
This publication has 67 references indexed in Scilit:
- Modeling and solving constrained two-sided assembly line balancing problem via bee algorithmsApplied Soft Computing, 2012
- Multi-mode renewable resource-constrained allocation in PERT networksApplied Soft Computing, 2012
- An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problemComputers & Industrial Engineering, 2011
- How to measure adaptation complexity in evolvable systems – A new synthetic approach of constructing fitness functionsExpert Systems with Applications, 2011
- An approach to find task sequence for re‐balancing of assembly linesAssembly Automation, 2010
- A resource-constrained assembly job shop scheduling problem with Lot Streaming techniqueComputers & Industrial Engineering, 2009
- A two-phase GA model for resource-constrained project schedulingAutomation in Construction, 2009
- Conceptual design of remote monitoring and fault diagnosis systemsInformation Systems, 2007
- Particle swarm optimization-based schemes for resource-constrained project schedulingAutomation in Construction, 2005
- An object-oriented intelligent CAD system for ceramic kilnKnowledge-Based Systems, 2001