Simulation-based performance assessment of an implant scheduler in semiconductor manufacturing
Authors:
- 1 December 2017
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3704-3713
Abstract
The processes of implanting tools in semiconductor production involve a variety of setup parameters, suggesting utilization of a scheduler for planning lot allocation in a reasonable manner. However, a scheduler is complex by design, making evaluation difficult without appropriate aids. We describe an approach using discrete event simulation software for assessing the performance and supporting the parameterization of an implant scheduler. Furthermore, rolling-horizon approaches are discussed and the scheduler performance is compared to two dispatch rules.Keywords
This publication has 9 references indexed in Scilit:
- Modeling of complex decision making using forward simulation2016
- An Improved Imperialist Competitive Algorithm Based Rolling Horizon Strategy for Photolithography Machines SchedulingIFAC-PapersOnLine, 2016
- A methodology to solve large-scale cooperative transportation planning problemsEuropean Journal of Operational Research, 2012
- Scheduling2012
- Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication FacilityIEEE Transactions on Semiconductor Manufacturing, 2010
- Simulation-based benchmarking of production control schemes for complex manufacturing systemsControl Engineering Practice, 2007
- Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facilityIEEE Transactions on Semiconductor Manufacturing, 2003
- A Simulation Framework for the Performance Assessment of Shop-Floor Control SystemsSIMULATION, 2003
- Scheduling setup changes at bottleneck facilities in semiconductor manufacturing2002